Omicron Consulting 1500 Market Street Philadelphia, PA 19102 Implementing RTPM Infrastructure for a Validated Environment May 14, 2003 Bill Smith Mead.

Slides:



Advertisements
Similar presentations
DIGIDOC A web based tool to Manage Documents. System Overview DigiDoc is a web-based customizable, integrated solution for Business Process Management.
Advertisements

Use of RtReports in the Pharmaceutical Environment
Empowering Business in Real Time. © Copyright 2009, OSIsoft Inc. All rights Reserved. Using PI for Reporting Regional Seminar Series Skye Blair and Alan.
© 2008 OSIsoft, Inc. | Company Confidential Event Frames Initiative Update Chris Nelson Chris Coen Chris Nelson Chris Coen.
HP Quality Center Overview.
© 2009 OSIsoft, Inc. – Company Confidential 1 Empowering Business in Real Time Regional Seminar Series Presents: Jonathan Procopio, Project Engineer,
ECM RFP 101 Presented by: Carol Mitchell C.M. Mitchell Consulting.
Security Controls – What Works
70-290: MCSE Guide to Managing a Microsoft Windows Server 2003 Environment Chapter 1: Introduction to Windows Server 2003.
Tools and Services for the Long Term Preservation and Access of Digital Archives Joseph JaJa, Mike Smorul, and Sangchul Song Institute for Advanced Computer.
Implementation/Acceptance Testing / 1 Implementation and Acceptance Testing Physical Implementation Criteria: 1. Data availability 2. Data reliability.
Maintaining and Updating Windows Server 2008
1 Empowering Business in Real Time. © Copyright 2009, OSIsoft Inc. All rights Reserved. Integrating Disparate Platforms for Consistent Analysis and Batch.
70-290: MCSE Guide to Managing a Microsoft Windows Server 2003 Environment, Enhanced Chapter 1: Introduction to Windows Server 2003.
1 Empowering Business in Real Time. © Copyright 2009, OSIsoft Inc. All rights Reserved. Reaching across boundaries, collaboration, Web Parts, and Notifications.
Andrea Sartori Solution Architect EMEA
Microsoft ® Application Virtualization 4.6 Infrastructure Planning and Design Published: September 2008 Updated: February 2010.
© 2007 OSIsoft, Inc. – Company Confidential Visualization in the Real- Time Enterprise Don Baron Product Manager.
Hands-On Microsoft Windows Server 2008 Chapter 1 Introduction to Windows Server 2008.
High-Speed, High Volume Document Storage, Retrieval, and Manipulation with Documentum and Snowbound March 8, 2007.
BMC Software confidential. BMC Performance Manager Will Brown.
Introduction to the Enterprise Library. Sounds familiar? Writing a component to encapsulate data access Building a component that allows you to log errors.
Security Ray Verhoeff Vice President – Engineering.
Software Licensing, Made Simple SELECT Server XM Edition
ENVIROTRAC: A Premier Chamber Monitoring and Data Acquisition System Envirotrac A Guided Tour.
9/10/20151 Hyperion Enterprise 6.5 New Features & Functionality Robert Cybulski, CPA Finit Solutions.
RtReports in Action Barry Higgins Automation & Control Engineer.
Microsoft ® System Center Operations Manager 2007 Infrastructure Planning and Design Published: June 2008 Updated: July 2010.
Module 8 Configuring and Securing SharePoint Services and Service Applications.
The PI-ProcessBook Family Customizable views of your data - Anywhere you want them.
AL-MAAREFA COLLEGE FOR SCIENCE AND TECHNOLOGY INFO 232: DATABASE SYSTEMS CHAPTER 1 DATABASE SYSTEMS (Cont’d) Instructor Ms. Arwa Binsaleh.
Implementing and Administrating Redundant PI-Advanced Computing Engine (ACE) Servers Craig Taylor PI Administrator.
USM Regional PeopleSoft Conference
Visualization in the Real-Time Enterprise Ken Marsh Service Manager OSI Software Asia Pte Ltd.
Copyright © 2002 OSI Software, Inc. All rights reserved Review 2002 Look-ahead.
User Manager Pro Suite Taking Control of Your Systems Joe Vachon Sales Engineer November 8, 2007.
Module 7: Fundamentals of Administering Windows Server 2008.
Dream Report: Secure and Reliable Reporting Renee Sikes Applications Engineer Dream Report Brand Manager.
European Plant-to-Enterprise Conference October 27-28, 2009, Utrecht, The Netherlands Mdf MES Development Framework Massimiliano Papaleo.
Yokogawa Electric Corporation Copyright © Yokogawa Electric Corporation Release 2.10 Functionality Overview September 2004.
Copyright © 2007 OSIsoft, Inc. All rights reserved. Ekho - MES Applications that leverages AF 2.0 Yannick Galipeau Inexcon Technologies Patrick Ramsey.
© Siemens AG All rights reserved. openlab III Board of Sponsors 3-4 May 2011 at CERN Joint Report Siemens - CERN.
Computer Emergency Notification System (CENS)
April 2004 At A Glance CAT is a highly portable exception monitoring and action agent that automates a set of ground system functions. Benefits Automates.
Introduction to RtReports – Tony Fenn & Chris Nelson Introduction to RtReports Chris Nelson - Senior Developer Tony Fenn - Product Manager.
Site Specification Management Using the RtPM Platform
Copyright © Yokogawa Electric Corporation Release 2.10 Functionality Overview September 2004.
The IT Quality Assurance FDA Validation Specialists Phone: 877-MGD-TEST ( ) n n n n Web Site:
Systems Management Server 2.0: Backup and Recovery Overview SMS Recovery Web Site location: Updated.
5 - 1 Copyright © 2006, The McGraw-Hill Companies, Inc. All rights reserved.
Analysis Framework PI AF 2.0 Foundation Project
OSIsoft High Availability PI Replication
SharePoint enhancements through SQL Server RSS integration with SharePoint What’s New Elimination of IIS
Copyright © 2007 OSIsoft, Inc. All rights reserved. Ad-Hoc Reporting Using The RtReports Web Part Tamara Carbaugh RtReports Product Manager OSIsoft, Inc.
11 CLUSTERING AND AVAILABILITY Chapter 11. Chapter 11: CLUSTERING AND AVAILABILITY2 OVERVIEW  Describe the clustering capabilities of Microsoft Windows.
PI Notifications and ProcessBook 3.1
Managing and Monitoring the Microsoft Application Platform Damir Bersinic Ruth Morton IT Pro Advisor Microsoft Canada
PI in a Modern Power Plant – American National Power, Inc. PI User Conference ‘03 Presented by: Brian M. Wood, American National Power, Inc More Uses Than.
Copyright © 2002 OSI Software, Inc. All rights reserved. PI BatchView 3.0 Presentation of your rich batch information Chris Coen, Software Developer, OSISoft.
Unit 17: SDLC. Systems Development Life Cycle Five Major Phases Plus Documentation throughout Plus Evaluation…
Copyright © 2002 OSI Software, Inc. All rights reserved. Regulatory Compliant PI Batch Reporting Designing for the PI Application Framework.
New Businesses for OSIsoft – Phil Ryder New Markets – New Businesses Phil Ryder Executive VP Worldwide Sales.
1 © 2008 OSIsoft, Inc. – All Rights Reserved PI T&D Users Group via LiveMeeting June 18, 2008 Transmission & Distribution Webinar PI for Asset Model and.
Maintaining and Updating Windows Server 2008 Lesson 8.
Final Review Systems Analysis and Design in a Changing World, 4th Edition 1 Final Review u Chapters 1-6, 8-10, 13, 14, 15 u Multiple choice, short answer,
OSIsoft High Availability PI Replication Colin Breck, PI Server Team Dave Oda, PI SDK Team.
October 2014 HYBRIS ARCHITECTURE & TECHNOLOGY 01 OVERVIEW.
SQL Database Management
Module Overview Installing and Configuring a Network Policy Server
Overview Activities from additional UP disciplines are needed to bring a system into being Implementation Testing Deployment Configuration and change management.
Presentation transcript:

Omicron Consulting 1500 Market Street Philadelphia, PA Implementing RTPM Infrastructure for a Validated Environment May 14, 2003 Bill Smith Mead Johnson Nutritionals Mike Purcell Omicron Consulting

Overview Drivers and Objectives Vision Infrastructure Planning Architecture/Standards Implementation Strategy Futures Summary

Drivers and Objectives PI Infrastructure in an FDA Compliant Environment Help Facilitate Validation of Other Areas Serve as a Model for Other sites Balance Implementation to Maximize Cost Effectiveness and Resource Utilization Leverage Emerging OSI technologies to Expose Process Data Position PI Infrastructure for the System of Record

Vision Compliant OSIsoft Infrastructure – Full Validation Documentation Provide Enterprise Access to Real Time Manufacturing Data Browser-Based Tools (Thin Client) Proactive Notification System of Record Rapid, Reliable and Informed Decision Making

Infrastructure Planning Phased Implementation Phase I: Validation & Batch Configuration Phase II: System of Record and Flexible Reporting/Notification Phase III: Enterprise Integration

Architecture/Standards

Naming Conventions PI Tags Implement a well-defined naming convention Utilize SCADA tag names as the core Prefix tags with area abbreviation Ensure naming convention makes it easy for users to find things via wildcard searches Consolidate from previously used conventions

Module Database Hierarchy Design a flexible hierarchy Ensure compatible hierarchy with other components: Event File Interface PIBaGen RTreports Make the structure “repeatable” Ease report generation issues by enabling the “general case” reporting

PI System Security PI Points The Interface User to own the data Only interface can write data Even PIAdmin cannot write/edit/delete data without first editing security attributes of the point PIAdmin to own the point (attributes) Interface Admin Group associated with point and data Group to have read/write access to attributes but read/only to data

PI System Security PI Users All users will have their own PI User ID SOP’s developed for User ID administration Procedures for adding/deleting/changing users

PI System Security Custom Application Security Utilize Windows NT/Netware Security to determine access rights Utilize AppName Trust to “proxy” user into PI to allow read/write access for manual data applications

PI System Security Backup Create custom cluster version of PISRVSTART and PISRVSTOP batch files SOP to address backup and recovery

PI Message Log Audit Trail Allows auditing of: Edits or Deletes to the Data Archive Does not support logging BLOB auditing PI Batch Database Changes Audit trail is written to the PI Message Log Message logs typically are purged after 15 days A backup procedure will accommodate longer retention of message log (audit trail)

Real-Time Data Collection OPC Interface Multiple OPC Interfaces Provide a level of fault-tolerance Logical delineations of data collection Data in PLC’s is accessed directly from the PLC’s via RSLinx Data in SCADA are accessed via the SCADA’s OPC server

Batch Data Collection EVT Interface for Batch Execution System batch files PI Batch Generator Interface New version is currently in development Provide for down-stream processing hierarchical batch generation Only be used where a Batch Execution System does not generate the batch information

Fault-Tolerance Server Use Microsoft Windows Clustering Validation Test Strategy includes testing failure modes

Fault-Tolerance Interfaces Use multiple OPC Interfaces Failure of a single interface will stop data from being collected from a section of the facility rather than the whole facility Run the interfaces on a Windows 2000 cluster to provide high reliability Use Buffering to protect against network outages and PI server outages

Alarming and Notification PI-ACE Based Use Module Database for Configuration Allow multiple instances of the same code Each instance runs in a context (module) and uses the Aliases defined in that context Use PI-SQC and PI-ALARMS for more complex triggering of notifications

Reporting Tools PI-DataLink Possible add-ins for things such as: Cycle time analysis Batch Hierarchy Reporting Note: Next Version of the Excel portion of BatchView will not access Batch Database Training to provide users with Ad-hoc query capabilities

Reporting Tools PI-ProcessBook Next Version of BatchView will support Batch Database Hierarchical Batches Batch Trends Gant Charts

Reporting Tools PI-ICE Web based access to PI Data, Trends, and Diagrams Uses “Web parts” to allow end-user customization Extensible via PI-ICE SDK Build custom Web parts such as: Batch Cycle Time Batch Hierarchy Batch Discrete Data Reporting

Reporting Tools RTreports Early Adopter Program Key batch reporting tool Supports PI Batch Database Hierarchical Batches Custom Calculations Designed to be 21CFR11 Compliant

Implementation Strategy

Phase I Validation & Batch Configuration First Half of 2003 Define Architecture/Standards Compliant PI Server Installation Interface Consolidation and Validated Implementation Batch Infrastructure Implementation (EVT) System of Record Prototype (ICE, ACE, RTreports) Quality Reporting cGMP Training

Phase I Server Validation Build Cluster as the Validated Server Using PI 3.3 SR2 Generate Validation Plan Generate URS, FRS, GDS Requirements Traceability Matrix Generate and Execute IQ/OQ Generate SOPs (Backup, Administration, Operations, Audit) Generate Traceability Matrix

Phase I Validated Implementation OPC Interface Design Multiple Interfaces Providing a Level of Fault- tolerance Generate DDS (Detail Design Document) Specific Implementation Appendix Listing All Tags Generate and Execute IQ/OQ Functional Test Specification (FTS) Structural Test Specification (STS)

Phase I Batch Infrastructure Implementation (EVT) Generate DDS EVT Generates Tags/MDB so DDS does not Have Tag List Generate and Execute IQ/OQ Test Plan

Phase I Manual Data Entry Yield Application Separate Validation Validation Plan, FRS, DDS, IQ/OQ, Unit Test Plan, Integration Test Plan, System Acceptance Test Plan, Traceability Matrix, PQ Leverage MDB for Correlation

Phase I System of Record Proof of Concept Non-validated, Read-only, Demonstrates Capabilities Installation of PI-ICE and Configuration of Screens Installation of PI-ACE and Generation of Notifications Installation of RTreports and Generation of Reports

Phase I Quality Reporting Foundation Shaped by Feedback from Proof of Concept Generation of URS and FRS

Phase I cGMP Training PI Client Tools PI-ICE Administration

Phase II - System of Record Central Repository Reliable Decision Making Fully Validated - End to End Quality Data – Batch Release 21 CFR Part 11 Compliant

Phase II - System of Record Quality Needs Specification Compliance Analysis Tools Internal Audits Batch Release Criteria Certificates of Analysis Root cause analysis SQC

Phase II - System of Record Regulatory Needs Exception Reporting Exception Analysis Regulatory Compliance Reports Environmental

Phase II - System of Record Manufacturing Needs Batch Summary Utility Reports Detail by Unit, Product, etc. Yield, Efficiency, Throughput CIP/SIP

Phase II July March 2004 MDB & PIBAGEN for non-iBatch Validated Implementation PI-RTreports PI-ICE Notification/PI-ACE Other Automation Areas Communicate Findings to Other Sites

Phase III (futures) Packaging & Enterprise Integration March September 2004 Evaluations Integration/Migration SAP RLINK Maintenance Management System Automation Integration of Packaging Evaluate PLM Integration Other Site Implementations

Questions & Answers ?

Omicron Consulting 1500 Market Street Philadelphia, PA Implementing RTPM Infrastructure for a Validated Environment May 14, 2003 Bill Smith Mead Johnson Nutritionals Mike Purcell Omicron Consulting