Enhanced Production Audit Program (EPAP) CAPPA Conference Panel Hosted by: Al McCue 21 October 2009.

Slides:



Advertisements
Similar presentations
MONITORING OF SUBGRANTEES
Advertisements

The Petroleum Registry of Alberta The Petroleum Registry of Alberta Energizing the flow of information Registry Information Session January 24, 2006.
Managing Evaluations for Consistently High Quality American Evaluation Association Annual Conference Molly Hageboeck.
Vice President of Facilities
Corvelle Drives Concepts to Completion 1. Case Study: Implementing a risk-based continuous compliance assessment program ISACA Fall Conference 25 November.
The Petroleum Registry of Alberta The Petroleum Registry of Alberta Energizing the flow of information Registry Information Session September 22, 2005.
Sarbanes-Oxley Compliance Process Automation
The Federal Regulator’s Perspective Industrial Railway Safety Conference Fort Saskatchewan, Alberta April 28, 2015.
QUALITY MANAGEMENT DEFINITIONS AND CONCEPTS QUALITY MANAGEMENT TOOLS QA / QC PROCESS COMPUTERS AND PROJECT QUALITY.
Chapter 5: Project Scope Management
Chapter 5: Project Scope Management
ECM Project Roles and Responsibilities
1 Change Management FOR University Medical Group Saint Louis University Click this icon for Audio.
Welcome ISO9001:2000 Foundation Workshop.
REVIEW AND QUALITY CONTROL
Session No. 3 ICAO Safety Management Standards ICAO SMS Framework
What is Business Analysis Planning & Monitoring?
Overview of NPG Social Responsibility Audit Process
THEN and NOW Lessons Learned with Process Change and Management Evaluation in the State of Pennsylvania August 2014.
3 Dec 2003Market Operations Standing Committee1 Market Rule and Change Management Consultation Process John MacKenzie / Darren Finkbeiner / Ella Kokotsis,
PMP® Exam Preparation Course
PILOT PROJECT: External audit of quality assurance system on HEIs Agency for Science and Higher Education Zagreb, October 2007.
From Research Prototype to Production
Organize to improve Data Quality Data Quality?. © 2012 GS1 To fully exploit and utilize the data available, a strategic approach to data governance at.
Industrial Engineering Roles In Industry
Demystifying the Business Analysis Body of Knowledge Central Iowa IIBA Chapter December 7, 2005.
Corvelle Drives Concepts to Completion 1. Monitor Compliance Risks Through Data Analytics IIA Calgary Luncheon 15 September
Lecture #9 Project Quality Management Quality Processes- Quality Assurance and Quality Control Ghazala Amin.
A DEPARTMENTAL PERSPECTIVE Drive Value through Compliance with the Green Book – Stop Checking the Box.
Module N° 8 – SSP implementation plan. SSP – A structured approach Module 2 Basic safety management concepts Module 2 Basic safety management concepts.
1 Today’s Presentation Sarbanes Oxley and Financial Reporting An NSTAR Perspective.
U.S. Department of Agriculture eGovernment Program July 15, 2003 eAuthentication Initiative Pre-Implementation Status eGovernment Program.
Avoid Disputes, Not Complaints Presented by: Stuart Ayres and Derek Pullen Stuart Ayres, Scheme Manager Derek Pullen, Scheme Adjudicator.
© Mahindra Satyam 2009 Configuration Management QMS Training.
Circuit Rider Training Program (CRTP) Circuit Rider Professional Association Annual General Meeting and Conference August 30, 2012.
Corvelle Drives Concepts to Completion EPAP Compliance Guidance Zedi EPAP Education Seminar October 27, 2009.
CIC Program Delivery Presentation to BC Organizations Feb. 8, 2013.
Introduction This presentation is intended as an introduction to the audit process for employees of entities being audited by MACD. Please refer to the.
University of Minnesota Internal\External Sales “The Internal Sales Review Process” An Overview of What Happens During the Review.
Internal Control Systems
Compliance Monitoring and Enforcement Audit Program - The Audit Process.
Project Scope Management 1. 2 Learning Objectives Understand the elements that make good project scope management important. Explain the scope planning.
SOLUTION What kind of plan do we need? How will we know if the work is on track to be done? How quickly can we get this done? How long will this work take.
Flow of Strategic Management Committee (SMC) Internal Controls effectively redefined Strategic management involves the formulation and implementation of.
1 Banking and Reconciliation. 2 To Certify As A Cash Handler  Visit the training website  Review the Payment Card Industry (PCI)
Office of Pipeline Safety Hazardous Liquid Pipeline Integrity Management July , 2002 Houston, Texas Welcome.
Corvelle Drives Concepts to Completion EPAP Compliance Guidance.
1 City of Shelby Wastewater Treatment Division Becomes State’s Second Public Agency to Implement a Certified Environmental Management System CERTIFICATION.
Overview PRINCE Hogeschool Rotterdam. 2 Project definition  A project is a temporary organization that is created for the purpose of delivering.
29 th May Agenda 9.15 Arrival – Tea/Coffee served 9.30 Breakfast served 9.45 The importance of the Framework within the world of Service Companies
BSBPMG501A Manage Project Integrative Processes Manage Project Integrative Processes Project Integration Processes – Part 2 Diploma of Project Management.
12/06/20161 ObjectiveProcess Risk Inherent Risk – risk of not achieving objectives Inherent risk Inherent risk – before the assessment of any controls.
CHB Conference 2007 Planning for and Promoting Healthy Communities Roles and Responsibilities of Community Health Boards Presented by Carla Anglehart Director,
IS&T Project Reviews September 9, Project Review Overview Facilitative approach that actively engages a number of key project staff and senior IS&T.
Field Office Training 1 U.S. Department of Housing & Urban Development CFFP Overview Field Office Conference Call March, 2008 Todd Wendorf Office of Capital.
Software Configuration Management
How to Survive an External Quality Assessment
Intercompany Project Time and Expenses Scenario Overview
Enhanced Production Audit Program (EPAP)
Internal Controls.
Strawman Best Practice IIA Change Forum June 2017
Guidance notes for Project Manager
MMU Project Management Community of Practice
RECORDS AND INFORMATION
Value from Measurement Schematics
Portfolio, Programme and Project
(Project) SIGN OFF PROCESS MONTH DAY, YEAR
Executive Project Kickoff
Internal Controls.
Internal Controls.
Presentation transcript:

Enhanced Production Audit Program (EPAP) CAPPA Conference Panel Hosted by: Al McCue 21 October 2009

How we will proceed  Each panellist will present for 6 – 7 minutes  We’ll spend the bulk of the time responding to your questions  We’ll close with short remarks from some panellists 2

Question period  After all panellists have made their presentations, we will open up the session to your questions  Your package contains index cards  Write your questions legibly on a card  Hold it high in the air where a volunteer will run it up to the podium 3

Today’s Panel  Colby Ruff  Rhon Rose  Al Davis  Eric Hazeldine  Yogi Schulz  Earl Quantz ERCB BP Canada (IMG) NAL Resources (CAPPA) Quorum Business Solutions Corvelle (ERCB – EPAP Project Manager) CAPPA 4

Enhanced Production Audit Program ERCB Overview CAPPA Conference Panel Presented by: Colby Ruff 21 October 2009

6 Presentation Outline  EPAP Goals  EPAP Philosophy  EPAP Benefits

7 EPAP Goals  Raise level of compliance to ERCB measurement and reporting requirements  Raise level of assurance over compliance to ERCB measurement and reporting requirements

EPAP Philosophy “Trust, but verify” - Ronald Reagan TrustOperator Declaration VerifyCompliance Assessment Process 8

9 Benefits to Operators  Appropriate level of assurance over compliance with ERCB requirements  Improved compliance with ERCB requirements  Improved volumetric business processes & controls  Higher quality volumetric data

Enhanced Production Audit Program New Business Practices CAPPA Conference Panel Presented by: Rhon Rose 21 October 2009

General Context  EPAP targets long term improvement in the compliance to:  Directive 007 reporting  Directive 017 measurement  Reporting is more visible  IMG is building a set of business practices for measurement  Most of the IMG areas will impact/involve the Production Accounting community 11

IMG Business Practices PA Impact Schematic Metering DiagramsHigh Gas and Liquid AnalysisHigh Gas Chart ReadingsLow Calibrations and ProvingLow SCADA/EFM/AutomationLow Fuel, Flare, and VentMedium Oil Well TestingMedium Gas Well TestingMedium Effluent Well TestingMedium 12

Impacts on You from Measurement Practices  In the Compliance Assessment Report you will get “bad” point (s) for:  Data anomalies  Field inspection findings  Your Senior Executives will have to sign an annual Declaration  You will generally need to implement more controls and have clearer lines of accountability 13

Metering Schematics  Do you have current ones?  Does it match how you do your allocations?  Do they contain the required information?  Has someone been assigned responsibility to maintain them?  Does your company have a control in place to ensure they are done and kept up to date? 14

Metering Schematics IMG DocumentBP Example Note: Any party tied to a BP plant is asked to request and review these with your PA 15

Enhanced Production Audit Program PA Business Process Best Practices CAPPA Conference Panel Presented by: Al Davis 21 October 2009

CAPPA Objectives  Strengthen the profession of Production accounting  Represent P.A. industry technically and procedurally  Provide education program for P.A.  Promote cordial relations among members  Provide production statistics forum 17

CAPPA Best Practices Committee Mandate  To develop and document Production Accounting best practices  initially focusing on required EPAP procedures 18

Process  ERCB has identified 74 non- compliance issues  CAPPA has determined that 33 of these are production accounting  Committee is developing processes  Using ERCB process template 19

Status  33 processes to be developed  9 are high risk, 24 are low risk  Draft completed for 6 high risk processes  Draft completed for 16 low risk processes  66% have drafts completed  currently starting draft reviews 20

Next Steps  Complete remaining drafts – Nov.  Review and finalize all drafts – Jan.  Standardize formats – Feb.  Review with CAPPA board - ongoing  Post on CAPPA website, access to industry  Plan to post some processes for year end 21

ERCB Process Template Components  Process Description:  Process background  Risk of noncompliance  Process owners  Process description  Process map/flow chart  Process control matrix 22

Process Example Gas Disposition Reporting Background  Gas disposition volumes are used to calculate gas volumes at a facility or well therefore the gas volumes must be reported in an accurate and timely manner 23

Process Example Gas Disposition Reporting Associated risk of non-compliance  Incorrect reporting results in inaccurate production, inaccurate revenue, incorrect royalty payments, increased government monitoring, audits and penalties, incorrect partner information and additional costs associated with reworks. 24

Process Example Gas Disposition Reporting Process owners  Field operator  Production accountant for the receiving facility  Production Accountant for the delivering facilities 25

Process Example Gas Disposition Reporting Process description  The following process is performed monthly:  The receipt facility/pipeline field operator measures gas volumes coming into the receiving facility/pipeline with a compliant gas measurement device and also spot checks gas analysis as required. 26

Process Example Gas Disposition Reporting Process map/flow chart  Outlines the process steps, how they all hang together and associated controls. 27

Process Example Gas Disposition Reporting Process control matrix  Defines the details of every associated control 28

Enhanced Production Audit Program Preparing for EPAP CAPPA Conference Panel Presented by: Eric Hazeldine 21 October 2009

High-Level Considerations  All operators have measurement and reporting business processes  Are they documented?  Do they leave an audit trail?  Also have controls that assure timely and quality results from processes  Automated or manual?  Facility-level or Company-level?  Do they assure D007 & D017 compliance?  Answers influence EPAP approach 30

Measurement Program Best Practices  Processes and Controls:  Strengthening is easier than creating and replacing  Modifications that move toward automation with full audit trail are most valuable  Consideration of D-007 and D-017 requirements in context of process modifications will yield appropriate controls 31

Measurement Program Best Practices, continued  Strive for uniform processes and controls across fields / assets  Greatly simplifies evaluations of controls  Lower cost to implement and maintain processes and controls  Job sharing and job transfers are easier  Change Management is key when processes are being changed  Increases long-term adherence and buy-in  More than documentation and training 32

Specific Example  D017: 8.4 Sampling and Analysis Frequency  Process Considerations -Does your meter setup process include designation of required sample frequency? -Is your sampling process driven off a schedule? -Are all new and accepted samples recorded centrally?  Controls -Preventive Control: The sample schedule itself -Detective Control: A report of overdue samples 33

Specific Example  D017: Measurement Data Audit Trail  Process Considerations -Where are raw volumes first recorded? -Raw volumes: EFM, SCADA, Data Historian, Chart Integrator, 3rd Party -How do they propagate into -Field Data Capture / Measurement system? -Production Accounting system? -Registry?  Controls -Detective Controls: Reconcile… -Production Accounting inputs to Registry inputs -Field Data Capture inputs to Production Accounting inputs 34

Enhanced Production Audit Program Project Summary CAPPA Conference Panel Presented by: Yogi Schulz 21 October 2009

36 Presentation Outline  EPAP development  EPAP components  Implementation schedule  Operator role Please any questions you may have to: EPAP is further described under Projects & Issues at:

EPAP Development PhaseTime span Initial analysis Project proposal Opportunity Evaluation Development 2Q – 3Q Q Q 2008 August 2008 – 4Q

38 EPAP Components  Operator evaluations of controls  Declaration process  Compliance assessment process  Action item process  D-019 Enforcement

Control Evaluation of Control Business Process Assesses Overview of Relationship 39

Review Well Test logs For sample of Well Tests, examine review of the log Conduct Well Tests Assesses Oil & Gas Example 40

Implementation Schedule PhasePlanned DevelopmentAugust 2008 – 4Q 2009 Implementation Phase Trial declaration period2010 First declaration period2011 Ongoing operationBeyond

42 Operator Role  Operations & Production Accounting  Execute business processes  Execute controls  Implement remediation plan  Audit group  Create the annual evaluation plan  Evaluate & strengthen controls  Develop remediation plan for findings  Senior management  Review / approve annual evaluation plan  Review evaluation results  Issue declaration

43 Operator Next Steps Internal EPAP implementation  Conduct an assessment  Plan for evaluations of controls  Communicate EPAP implementation plan internally  Respond to Compliance Assessment Report  Conduct trial evaluations of controls  Strengthen processes & controls

Enhanced Production Audit Program EPAP Actions for PA CAPPA Conference Panel Presented by: Earl Quantz 21 October 2009

EPAP Actions for Production Accountants  Embrace and build EPAP visibility  Action monthly compliance assessment report  Collaborate with field operations and measurement staff  Identify the controls on your desk and confirm are they working  Respond to evaluation of controls findings 45

Annual Operator EPAP Work  Create annual evaluation plan  Conduct evaluations of controls  Remediate deficiencies  Collaborate in the compliance assessment process  Submit the annual declaration 46

Discussion

Extra Slides

49 ERCB Role Production Audit Team  Review declarations  Perform compliance assessment process  Interact with operators on action items  Monitor execution of remediation work  Perform operator escalation process  Apply D-019 compliance enforcement