NORTHERN VIRGINIA HIGHLIGHTS for the Dulles Area Transportation Association June 19, 2013 Helen Cuervo VDOT District Administrator, Northern Virginia.

Slides:



Advertisements
Similar presentations
Transportation Funding Alternatives and Outreach
Advertisements

1 Transportation Update for Loudoun County Presentation to DATA June 23, 2010.
1 Fairfax County Base Realignment and Closure Laura Miller Fairfax County BRAC Coordinator October 18, 2011.
County of Fairfax, Virginia Department of Transportation Transportation Funding Discussion (Continued) Board Transportation Committee February 14, 2012.
County of Fairfax, Virginia Board Transportation Committee Updates on Alternatives for Improving Roadway Services in Fairfax County Discussion of Converting.
PWC Transportation Report DATA Meeting June 19, 2013 Rick Canizales Transportation Planning Division Chief Department of Transportation.
Click to edit Master title style »Click to edit Master text styles –Second level Third level –Fourth level Fifth level Construction Update 11/13/2012 Larry.
1 TransAction 2040 NVTA Presentation 1 May 10, 2012.
County of Fairfax, Virginia Department of Transportation Transportation Funding Discussion Board Retreat February 7, 2012.
Some things cant wait for traffic Capital Beltway HOT Lanes Project Update – January 2011 New Travel Choices Ahead.
I-95 HOT/HOV Lanes Project Fairfax County TAC August 16, 2011.
Some things cant wait for traffic Capital Beltway HOT Lanes Project Fairfax County TAC Update – August 16, 2011 New Travel Choices Ahead.
Prince William County Government Prince William County Department of Transportation Road Program DATA June 23, 2010.
Dulles Corridor Metrorail Project Status Update Fairfax County Transportation Advisory Commission November 16, 2010 Richard Stevens Fairfax County Department.
County of Fairfax, Virginia Department of Transportation Board Four Year Transportation Plan 2012 to 2015 Board Transportation Committee November 29, 2011.
I-95 Transit & TDM Plan I-95 Transit and TDM Plan Summary of Recommendations Slide 1.
County of Fairfax, Virginia Department of Transportation Board Four Year Transportation Plan 2013 to 2016 Board Transportation Committee June 12, 2012.
Capital Beltway HOT Lanes Project Project Update April 2009.
1 I-95/395 HOV/Bus/HOT Lanes April Current Status Project Sections Military Corridor Improving Transit & HOV Other Issues Agenda 2.
Silver Line Rail Project Update
Some things cant wait for traffic Capital Beltway HOT Lanes Project New Travel Choices Ahead.
R O A D U S E R F E E T A S K F O R C E 1 OREGONS TRANSPORTATION FUNDING CHALLENGE.
April 25, 2012 ODOT Planners Meeting. 2 Purpose of Project Improve mobility and safety for people and freight for local, regional, and through travel.
0 - 0.
DIVIDING INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
SUBTRACTING INTEGERS 1. CHANGE THE SUBTRACTION SIGN TO ADDITION
MULT. INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
Addition Facts
MDOT University Region 10 county region 3 Transportation Service Centers (TSC) Jackson TSC Jackson County Jackson County Hillsdale County Hillsdale County.
The Hale Street Link Project. Project Vision The Hale Street Link Alliance will build a landmark, inner city bridge to enhance accessibility and livability.
1 Item 11, Presentation to the TPB, September 15, 2010.
Yellow Light for P3s in Virginia? Presentation by Ronald D. Utt American Dream Conference, Washington DC, October 30, 2013.
Grade Separation (GS-16) Project. Project Location - Bensenville N.
Gateway Corridor Alternatives Analysis Findings Metropolitan Council Transportation Committee November 26, 2012.
Addition 1’s to 20.
Test B, 100 Subtraction Facts
CALTRANS - SIDUE California-Baja California Border Master Plans August 1, 2012.
Week 1.
Proposed Significant Additions and Changes for the 2010 CLRP Public Comment Release April 15, 2010 National Capital Region Transportation Planning Board.
Route 29 Western Bypass: Background and Timeline May 13, 2014 John Lynch, P.E. Culpeper District Administrator.
THE 2012 FINANCIALLY CONSTRAINED LONG-RANGE TRANSPORTATION PLAN (CLRP) AND THE FY TRANSPORTATION IMPROVEMENT PROGRAM (TIP) Transportation Planning.
County of Fairfax, Virginia Sully District Council Meeting November 19, 2014.
Dulles Corridor Metrorail Project 23-mile new Metrorail line branching off the Orange Line after East Falls Church 11 new stations 5 in Phase 1: East Falls.
Corridor #5 Update United States Senate Briefing September 26, 2007.
1 Corey W. Hill Chief of Public Transportation May 20, 2008 May 20, 2008.
Route 28 South of I-66 Corridor Safety and Operations Study Technical Committee Meeting #2 June 25,
County of Fairfax, Virginia Department of Transportation Update on Transportation Activities in Fairfax County Transportation Roundtable Dulles Area Transportation.
Congressional District Projects New CD-1 Central Park Blvd/I-70 — $47.2 million project funded through the American Recovery and Reinvestment Act (ARRA).
1 The 2010 Financially Constrained Long-Range Transportation Plan And FY Transportation Improvement Program TPB Technical Committee November.
Congressional District Projects New CD-3 SMART 160 Trail: — This trail will be a multiple use trail and will offer access to a network of current and proposed.
Performance Analysis Presentation to the National Capital Region Transportation Planning Board (NCR-TPB) November 28, 2012 Adopted: July 18, 2012 Item.
DRAFT 1 Significant Changes for the 2006 Constrained Long-Range Plan March 3, 2006.
Performance Analysis Presentation to the National Capital Region Transportation Planning Board (NCR-TPB) December 19, 2012 (updated from November 28, 2012)
Proposed Significant Additions and Changes for the 2010 CLRP As Approved by the TPB on May 19, 2010 National Capital Region Transportation Planning Board.
Interstate 95 Corridor Improvement Program June 20, 2012.
1 Item 12: Report on Draft Bicycle and Pedestrian Plan for the National Capital Region Michael Farrell TPB Staff Presentation to the Transportation Planning.
Freeway Congestion In The Washington Region Presentation to National Capital Region Transportation Planning Board February 15, 2006 Item # 9.
I-95 Access Study Fredericksburg Area Project Status Update February 12, 2010.
Overview Presentation Fall 2015 Gainesville-Haymarket Extension Study.
Think Globally, Act Locally August 19, Introduction Why freight is important to central Ohio Global implications and impacts Highway system challenges.
I-66 Corridor Improvements Morteza Farajian Interstate 66 Corridor Improvements From US Route 15 in Prince William County To Interstate 495 in Fairfax.
The 2006 Constrained Long-Range Transportation Plan: Plan Performance Ronald F. Kirby Director of Transportation Planning October 18, 2006 Item #7.
County of Fairfax, Virginia Department of Transportation Update on Transportation Activities in Fairfax County Transportation Roundtable Dulles Area Transportation.
Local land-use and transportation
Sully District Council of Citizens Associations January 25, 2017 Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation.
DATA Transportation 101 Project Status March 20, 2002
I-85 Widening Project MM Cherokee County Public Hearing March 14, 2017.
Responsibilities and FUNDING
Bi-County Parkway Evaluation of Impacts on Fairfax County Roads
I-85 Widening Project MM Cherokee County Public Hearing March 14, 2017.
Presentation transcript:

NORTHERN VIRGINIA HIGHLIGHTS for the Dulles Area Transportation Association June 19, 2013 Helen Cuervo VDOT District Administrator, Northern Virginia

Route 29/Linton Hall Road Interchange New interchange in Gainesville eliminates at-grade railroad crossings, improves congestion and stop-and-go traffic. Two new overpasses will carry Route 29 over the Norfolk Southern Railroad, and Linton Hall and Gallerher Roads over the railroad and Route 29. Route 29 will be widened to six lanes. Route 29 traffic moves to the new bridge this August. $267 million Completion June Underway 2

Route 50 Widening Widening Route 50 to reduce congestion. 3.7-mile widening to six lanes from Poland Road in Loudoun County to Route 28 in Fairfax County. $100 million Completion June 2015 Underway 3

I-66 Active Traffic Management 4 $32 million project to improve safety from D.C. to Haymarket using sign gantries, lane controls, incident and queue detection. Underway

I-66 Gainesville to Haymarket I-66 widening to eight lanes – from Route 29 in Gainesville to Route 15 in Haymarket. $78 million project begins I-66/Route 15 Interchange in Haymarket – Construction on the $78 million interchange begins Coming Soon

Route 606 (Loudoun County Parkway) Five-mile reconstruction and widening of rural two- lane road to four lanes between Evergreen Mills Road and the Dulles Greenway Design approval this fall; construction begins In design 6

7 I-66/Route 28 Interchange New! $50 million for design, right of way and phase 1 construction

8888

9

10

11

12

13

14

15 East-West Improvements Total Over $ 2 Billion Programmed Route 7 Widen to 6 Lanes Reston Ave. to Jarrett Valley in Design Rolling Holly to Reston Ave Underway I-66 Spot Improvement 2 Westmoreland St to Haycock Rd In Design Metro Silver Line East Falls Church to Route 772 Underway US 50 Widen to 6 Lanes Poland Rd to VA 28 Underway I-66 /28 Int. In Design I-66 Widening Gainesville to Haymarket Begins 2013 I-66 / US 15 Int. Begins 2015 US 29 / Linton Hall Rd Interchange Underway VA 234 Bypass / Balls Ford Rd Relocated Interchange In Study I-66 EIS (Tier 1) US 15 to I-495 RFI coming Buses on Shoulder I-66 inside beltway In Design I-66 ATM Underway Dulles Loop Rt 606/VA 28/US 50 In Design

Bi-County Parkway EIS & Location Study A north-south Parkway connecting Route 234 (north of I-66) in Prince William County to Route 50 in Loudoun County. The 10.4-mile Parkway will provide needed capacity to address approved and planned residential and commercial growth. 16

Proposed Bi-County Parkway Prince William and Loudoun counties are two of the fastest growing in the nation. Their combined population is expected to increase by more than 300,000 by 2040 – equivalent to the population of Loudoun today. Roads like Route 15, 234, Gum Spring Road will be seriously congested by 2040 if Bi-County is not built. The Bi-County will serve as a direct connection for travelers who are now forced to travel east and west – exacerbating traffic on those routes – in order to access north-south roads. 17

Bi-County Parkway Route 29 will remain open until the Manassas National Battlefield Park Bypass is built. Funding has not been identified for the Bypass. Existing Route 234 would be widened and relocated 2.5 miles west of the Manassas National Battlefield Park. Route 234 in the Park would close to through traffic after the Bi-County is built. The only access points in the Rural Crescent to the Bi-County Parkway will be from connections at I-66, Route 29 and existing Route 234 west of the Battlefield. There will be no tolls on the Bi-County Parkway. Next steps: Finalize Programmatic Agreement and submit DEIS to FHWA for approval. $12 million available to begin design. 18

Manassas National Battlefield Park Bypass EIS and Location Study Initiated as directed by Congress in 1988 legislation to develop alternatives that allow for the closure of Routes 29 and 234 to preserve the Battlefield. National Park Service managing study. Funding not identified. 19

Dulles Air Cargo, Passenger and Metro Access Highway Enhance the movement of people, passenger services and air cargo traffic to Dulles International Airport. Public hearing held on 3 alternatives June 13. Funding not identified. 20 Location Study