Title slide/end slide image dimensions: Title slide images must always fit this size: Height: 10.6 cm; Width: 25.4 cm Title slide images must always follow.

Slides:



Advertisements
Similar presentations
Add presentation information via View/Header and Footer To add pre-formatted bullets please use the increase/decrease indent buttons found in the PowerPoint.
Advertisements

Vestas.com WMI Concept at Vestas. 2 | Presentation title, January 21, 2014 Challenges to the project The plan What is the long- and short term objectives.
Title slide/end slide image dimensions: Title slide images must always fit this size: Height: 10.6 cm; Width: 25.4 cm Title slide images must always follow.
Show guidelines, which are useful when placing elements and photos: 1. Rightclick on the slide and choose ’Grid and Guides’ 2. Check ’Display drawing guides.
Title slide/end slide image dimensions: Title slide images must always fit this size: Height: 10.6 cm; Width: 25.4 cm Title slide images must always follow.
Create subtitle 1. Make a line break 2. Click on ‘Increase Indent’ from Top Ribbon under ‘Home’/Paragraph 3. Insert or type the subtitle NB! The dashed.
Copyright © 2013 Pearson Education, Inc. Publishing as Prentice Hall. 1 Skills for Success with Office 2010 Vol. 1, 2e PowerPoint Lecture to Accompany.
Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall Chapter 3 Global Supply Chain Quality and International Quality Standards.
Copyright © 2011 Pearson Education 17-1 International Business Environments and Operations, 13/e Global Edition Part 6 Managing International Operations.
International Business Environments & Operations
Title slide/end slide image dimensions: Title slide images must always fit this size: Height: 10.6 cm; Width: 25.4 cm Title slide images must always follow.
Title slide/end slide image dimensions: Title slide images must always fit this size: Height: 10.6 cm; Width: 25.4 cm Title slide images must always follow.
Meeting the Wind Power Challenge – Industry Perspective AWEA Transportation Logistics Working Group.
Chapter 3 Global Supply Chain Quality and
Vestas.com Condition Based Maintenance of Vestas Offshore Turbines European Offshore Wind Conference & Exhibition 2009, Stockholm Jacob Juhl Christensen,
Are you fit for nuclear? Opportunities for SMEs in the nuclear sector.
Introduction to Operations and Supply Chain Management
Manufacturing Processes Copyright © Texas Education Agency, All rights reserved.
© 2010 Plexent – All rights reserved. 1 Change –The addition, modification or removal of approved, supported or baselined CIs Request for Change –Record.
Vestas.com How Can Offshore Wind Contribute To The European Energy Portfolio? Uffe Vinther Schou, Sales Director, Vestas Offshore A/S.
Vestas.com Wind Energy in Poland – Potential, Prospects and Pitfalls A presentation for the joint seminar by demosEuropa and the Danish Embassy in Warsaw.
VI. KAZENERGY Eurasian Forum Wind energy development in the emerging markets including Kazakhstan Andreas Thomas, Senior Vice President Business Development.
Title slide/end slide image dimensions: Title slide images must always fit this size: Height: 10.6 cm; Width: 25.4 cm Title slide images must always follow.
1- 1 Copyright © 2012 Pearson Education. Chapter One Creating and Capturing Customer Value.
Copyright © 2011 Pearson Education 14-1 International Business Environments and Operations, 13/e Global Edition Part 5 Global Strategy, Structure, and.
8-1 Organizational Design and Strategy in a Changing Global Environment Copyright © 2013 Pearson Education, Inc. Publishing as Prentice Hall.
Title slide/end slide image dimensions: Title slide images must always fit this size: Height: 10.6 cm; Width: 25.4 cm Title slide images must always follow.
1 | Corporate Presentation, October 9, 2015 vestas.com Improvement of loads verification tools.
Diana Carpenter Team Lead No Worker Left Behind Bureau of Workforce Transformation Department of Energy, Labor & Economic Growth Linda Patrick Division.
1 Delta Industries… AS9103 Implementation & Benefits Presentation for I.A.Q.G. October 7, 2005 Dave Wentworth - C.I. manager.
1 | Wind in British Columbia Wind in British Columbia Generate 2010: Getting It Built November 8, 2010 Title slide/end slide image dimensions: Title slide.
Chapter Six Competitor Analysis and Sources of Advantage.
Chapter Six Competitor Analysis and Sources of Advantage.
Copyright © 2009 Pearson Education, Inc. Publishing as Prentice Hall. 1 Skills for Success with Microsoft ® Office 2007 PowerPoint Lecture to Accompany.
Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall 1 1 Committed to Shaping the Next Generation of IT Experts. Chapter 4: Create, Edit,
Chapter 2: Analyzing the Current Situation The Marketing Plan Handbook Fourth Edition Marian Burk Wood 2-1.
Westinghouse Non-Proprietary Class 3© 2015 Westinghouse Electric Company LLC. All Rights Reserved. 1 Graham Cable Vice President, New Plant Development.
RSM International Conference, Singapore 2007 RSM Global Business Forecast Middle Enterprises in the World Economy David Bartlett Economic Adviser, RSM.
With Microsoft ® PowerPoint 2010© 2011 Pearson Education, Inc. Publishing as Prentice Hall1 PowerPoint Presentation to Accompany GO! with Microsoft ® PowerPoint.
Vestas.com Texas/European Union Wind Energy Symposium October 2009 Dr. Carsten Hein Westergaard Vestas Technology R&D Americas, Inc.
Copyright © 2009 Pearson Education, Inc. Publishing as Prentice Hall. 1 Skills for Success with Microsoft ® Office 2007 PowerPoint Lecture to Accompany.
INTERNATIONAL OPERATION MANAGEMENT - Introduction - Different perception of Globalization : investment in the other countries, innovations in computer.
Copyright © 2011 Pearson Education, Inc. publishing as Prentice Hall 17-1 International Business Environments and Operations, 13/e Part 6 Managing International.
7 chapter Business Essentials, 8 th Edition Ebert/Griffin Operations Management and Quality Instructor Lecture PowerPoints PowerPoint Presentation prepared.
Global Wind Turbine Components Market WEBSITE Single User License: US$ 2500 No of Pages: 73 Corporate User License:
CHAPTER 11 STRUCTURE AND CONTROLS WITH ORGANIZATIONS.
Copyright © 2015 International Market Analysis Research & Consulting (IMARC). All Rights Reserved imarc w.imarcgroup.com Parboiled and White Rice Manufacturing.
Go to View > Master > Slide Master to insert your unit name here Author 1 | Author 2 | Author 3 (edit this list on View > Slide Master) Go to View > Slide.
1 Top of Client’s Logo Bottom of Client’s Logo Change to blue backgroundcolor Go to Design menu, categorie Themes Choose the ‘Blue Kunde & Co’ template.
ГММ -1( а ) Li Jianfei. By 2040, the world and, in particular, countries which have large and technologically advanced economies – such as the USA,
Purchasing Suppliers.
Introduction to Operations and Supply Chain Management
Customizable Focus Walls
Chapter 1 Marketing: Creating and Capturing Customer Value
GO! with Microsoft® Office for Mac 2011
© 2016 Global Market Insights, Inc. USA. All Rights Reserved Hybrid Solar Wind Energy Storage Market to grow at 9%+ CAGR from :
Valuation Creation Through Strategy
Managing Supplier Quality
I4.0 in Action The importance of people and culture in the Industry 4.0 transformation journey Industry 4.0 Industry 3.0 Industry 2.0 Industry 1.0 Cyber.
Peanut Butter Market PPT : Global Trends, Scope, Demand, Opportunity and Forecast by 2024
Telecom Power Systems Market Report, Share, Size, Trends, Growth and Forecast 2024
Presentation transcript:

Title slide/end slide image dimensions: Title slide images must always fit this size: Height: 10.6 cm; Width: 25.4 cm Title slide images must always follow this position: Horizontal: 0 cm; Vertical: 0 cm To change title slide/end slide image: Insert image according to the dimensions and position listed above Right-click on image and select ‘Order/Send to back’ Delete original image Tip: Fit images easily to the right dimension using Vestas drawing guides. Vestas drawing guides will help you position and crop images. Images will snap to drawing guides when repositioned or cropped. To add drawing guides: Right-click on next to slide Select ‘Grid and Guides…’ Check ‘Display drawing guides on screen’ Press ‘OK’ AMT's Global Forecasting & Marketing Conference Miami, October 20, 2010 Gene Cuenot Vestas Nacelles Supply Chain Management – The Americas

Add Name of presentation via ‘View/Header and Footer’ To add pre-formatted bullets please use the increase/decrease indent buttons found in the PowerPoint menu Add footnotes above Name of presentation (Arial 9, Black) AMT's Global Forecasting & Marketing Conference2 The overall sourcing and manufacturing strategy: In the region for the region. Importance of Location

Add Name of presentation via ‘View/Header and Footer’ To add pre-formatted bullets please use the increase/decrease indent buttons found in the PowerPoint menu Add footnotes above Name of presentation (Arial 9, Black) AMT's Global Forecasting & Marketing Conference3 Importance of Location Location of Suppliers and Competitors Foundry Machining Gears Generators Supplier Information GE Gamesa Suzlon Siemens Mitsubishi Turbine Manufacturers Top Quartile 2 nd Quartile Existing Suppliers Modeled Location State Ranking for Potential Suppliers

Add Name of presentation via ‘View/Header and Footer’ To add pre-formatted bullets please use the increase/decrease indent buttons found in the PowerPoint menu Add footnotes above Name of presentation (Arial 9, Black) AMT's Global Forecasting & Marketing Conference4 Chicago Nacelles - Overview Chicago Location  Centrally located  Available talent  Response time to market  Closeness to supply base

Add Name of presentation via ‘View/Header and Footer’ To add pre-formatted bullets please use the increase/decrease indent buttons found in the PowerPoint menu Add footnotes above Name of presentation (Arial 9, Black) AMT's Global Forecasting & Marketing Conference5 Establishing Nacelles’ Supply Chain  Category Sourcing  Lean, Six Sigma, APQP, PPAP and ISO certifications desired  Established sourcing milestones and detailed timelines  Experienced staff selected from auto and off-highway industries

Add Name of presentation via ‘View/Header and Footer’ To add pre-formatted bullets please use the increase/decrease indent buttons found in the PowerPoint menu Add footnotes above Name of presentation (Arial 9, Black) AMT's Global Forecasting & Marketing Conference6 Historic Industry growth Economic Down-turn Critical components sourcing Commodities level sourcing Credit Conditions – tight but monies are available Demand for High Quality and Delivery Competition will be fierce N. America Sourcing but for global suppliers Industry driven ISO9000-like baseline work practices Baseline

Add Name of presentation via ‘View/Header and Footer’ To add pre-formatted bullets please use the increase/decrease indent buttons found in the PowerPoint menu Add footnotes above Name of presentation (Arial 9, Black) AMT's Global Forecasting & Marketing Conference7 Supply opportunities Bearings Hydraulics, pumps Lubrications systems Plastics Wires and Cables Transformers Castings Weldings Fasteners Machined components Sheet metal work Lifts V90/3MW V82/2MW Nacelles - Overview

Add Name of presentation via ‘View/Header and Footer’ To add pre-formatted bullets please use the increase/decrease indent buttons found in the PowerPoint menu Add footnotes above Name of presentation (Arial 9, Black) AMT's Global Forecasting & Marketing Conference8 The Sourcing Experience

Add Name of presentation via ‘View/Header and Footer’ To add pre-formatted bullets please use the increase/decrease indent buttons found in the PowerPoint menu Add footnotes above Name of presentation (Arial 9, Black) AMT's Global Forecasting & Marketing Conference9 North America Suppliers Strengths  Ability & Flexibility to Invest  Transferrable skills  Quality systems  Knowledge in APQP and PPAP  State and Government support Improvements  Grow knowledge of wind industry  Drive continuous improvements in quality & delivery  Achieve one-piece flow  Appropriate investment planning

Add Name of presentation via ‘View/Header and Footer’ To add pre-formatted bullets please use the increase/decrease indent buttons found in the PowerPoint menu Add footnotes above Name of presentation (Arial 9, Black) AMT's Global Forecasting & Marketing Conference10 Emphasis on Safety and Quality Our Number 1 Priority Safety and Quality High quality = satisfied customer Wind suppliers MUST master basic quality management tools Industry specific standard to achieve quality fundamentals

Add Name of presentation via ‘View/Header and Footer’ To add pre-formatted bullets please use the increase/decrease indent buttons found in the PowerPoint menu Add footnotes above Name of presentation (Arial 9, Black) AMT's Global Forecasting & Marketing Conference11 Importance of Quality One “small” supplier defect = Rework up tower Rework up tower = Down Turbine Crane Cost Technician Cost Shipping Cost Down Turbine = Loss of Production Loss of customer satisfaction Loss of Production = Lower business case certainty Raises perception of high risk investment High Risk Investment = Lower investments made Lower investment = No growth for any OEM and fewer jobs.

Add Name of presentation via ‘View/Header and Footer’ To add pre-formatted bullets please use the increase/decrease indent buttons found in the PowerPoint menu Add footnotes above Name of presentation (Arial 9, Black) AMT's Global Forecasting & Marketing Conference12 Current Supplier Quality Performance Typical Industry Root Causes: Product received does not meet form, fit & function requirements Un-validated product/process changes Critical Process not in statistical Control Poor inspection and test coverage

Add Name of presentation via ‘View/Header and Footer’ To add pre-formatted bullets please use the increase/decrease indent buttons found in the PowerPoint menu Add footnotes above Name of presentation (Arial 9, Black) AMT's Global Forecasting & Marketing Conference13 Market and Customer Expectations Suppliers must drive to improve the basics of Quality Management. Implement Culture of Quality: OWN your product quality Improve controls and test coverage Improve responsiveness & take ownership of problem resolution

Add Name of presentation via ‘View/Header and Footer’ To add pre-formatted bullets please use the increase/decrease indent buttons found in the PowerPoint menu Add footnotes above Name of presentation (Arial 9, Black) AMT's Global Forecasting & Marketing Conference14 The Supply Impact

Add Name of presentation via ‘View/Header and Footer’ To add pre-formatted bullets please use the increase/decrease indent buttons found in the PowerPoint menu Add footnotes above Name of presentation (Arial 9, Black) AMT's Global Forecasting & Marketing Conference15 Extreme growth – Fastest growing of the renewables sectors for quality suppliers Renewables industry expansion drives need for uniform supply standard. Industry growth driving: - manufacturing, installations and employment - supplier process optimization Need for continuous improvement Industry Impact on Suppliers

Add Name of presentation via ‘View/Header and Footer’ To add pre-formatted bullets please use the increase/decrease indent buttons found in the PowerPoint menu Add footnotes above Name of presentation (Arial 9, Black) AMT's Global Forecasting & Marketing Conference16 Innovativeness Increased co-operation Increased reliability Multiple sourcing Partnering and long term agreements Production readiness Industry Expectations of Suppliers

Add Name of presentation via ‘View/Header and Footer’ To add pre-formatted bullets please use the increase/decrease indent buttons found in the PowerPoint menu Add footnotes above Name of presentation (Arial 9, Black) AMT's Global Forecasting & Marketing Conference17 APQP – advance product quality planning PPAP – production part approval process FFF – form, fit and function CTQ – critical to quality Record retention Expected Tools

Add Name of presentation via ‘View/Header and Footer’ To add pre-formatted bullets please use the increase/decrease indent buttons found in the PowerPoint menu Add footnotes above Name of presentation (Arial 9, Black) AMT's Global Forecasting & Marketing Conference18 Industry Outlook

Title slide/end slide image dimensions: Title slide images must always fit this size: Height: 10.6 cm; Width: 25.4 cm Title slide images must always follow this position: Horizontal: 0 cm; Vertical: 0 cm To change title slide/end slide image: Insert image according to the dimensions and position listed above Right-click on image and select ‘Order/Send to back’ Delete original image Tip: Fit images easily to the right dimension using Vestas drawing guides. Vestas drawing guides will help you position and crop images. Images will snap to drawing guides when repositioned or cropped. To add drawing guides: Right-click on next to slide Select ‘Grid and Guides…’ Check ‘Display drawing guides on screen’ Press ‘OK’ Copyright Notice The documents are created by Vestas Wind Systems A/S and contain copyrighted material, trademarks, and other proprietary information. All rights reserved. No part of the documents may be reproduced or copied in any form or by any means—such as graphic, electronic, or mechanical, including photocopying, taping, or information storage and retrieval systems without the prior written permission of Vestas Wind Systems A/S. The use of these documents by you, or anyone else authorized by you, is prohibited unless specifically permitted by Vestas Wind Systems A/S. You may not alter or remove any trademark, copyright or other notice from the documents. The documents are provided “as is” and Vestas Wind Systems A/S shall not have any responsibility or liability whatsoever for the results of use of the documents by you. Vestas wishes to acknowledge and respect all copyrights in connection with the illustrations used in this presentation. In case we have unintentionally violated copyrighted material, we want to be informed immediately in order to straighten things out and thus to honour any obligatory fees. Title slide/end slide image dimensions: Title slide images must always fit this size: Height: 10.6 cm; Width: 25.4 cm Title slide images must always follow this position: Horizontal: 0 cm; Vertical: 0 cm To change title slide/end slide image: Insert image according to the dimensions and position listed above Right-click on image and select ‘Order/Send to back’ Delete original image Tip: Fit images easily to the right dimension using Vestas drawing guides. Vestas drawing guides will help you position and crop images. Images will snap to drawing guides when repositioned or cropped. To add drawing guides: Right-click on next to slide Select ‘Grid and Guides…’ Check ‘Display drawing guides on screen’ Press ‘OK’ The following slides have been removed from Gene Cuenot’s presentation – contact emerging energy research to learn how to obtain this information North America Wind Energy Market Forecast: 2010–2025 US Wind Cumulative Capacity GW by Region: Base-Case Scenario US Regional Growth: Base-Case North American GW Added by Country: Base-Case