GREATER MEKONG SUBREGION CORE ENVIRONMENT PROGRAM GMS CEP-BCI Phase II NSU arrangements and implementation procedures GMS Environment Operations Center.

Slides:



Advertisements
Similar presentations
Joint Initiative on Mutual Accountability: Cambodia, Lao PDR and Vietnam November 2009 Joint Initiative on Mutual Accountability: Cambodia, Lao PDR and.
Advertisements

Country practises on the implementation of the SNA and supporting statistics Meeting on Scaling up the coordination and resources for the implementation.
United Nations Environment Programme (UNEP) Secretariat of the Basel Convention (SBC) Enhancing cooperation between the Basel Convention and the Stockholm.
International Workshop on Institutional Capacity Development in Transboundary Basins November 2008, Bonn, Germany Le Duc Trung Acting Secretary.
GREATER MEKONG SUBREGION CORE ENVIRONMENT PROGRAM Component 4: Strengthened Institutions and Financing Activity Progress and Component Strategy.
Greater Mekong Subregion Core Environment Program and Biodiversity Conservation Corridors Initiative ADB TA 6289 Executing Agency: ADB Implementing Agency:
GREATER MEKONG SUBREGION CORE ENVIRONMENT PROGRAM Component 2: Biodiversity Landscape Conservation and Livelihoods Development Activity Progress and Component.
GREATER MEKONG SUBREGION CORE ENVIRONMENT PROGRAM Component 3: Climate resilience and low carbon strategies developed Activity Progress and Component Strategy.
Greening Regional Economic Cooperation in Support of Biodiversity Conservation Outcomes Future Directions for the GMS Mme Keobang A Keola, WREA, Lao PDR.
Report presented by Working Group 1 on the capacity development plan to implement CDM in Viet Nam Task 1 : 1.1. Duration: to January Expected.
WB Efforts in Trade & Transport Facilitation (TTF), all in Support of GMS Program on TTF Kazi Matin & Baher El-Hifnawi Workshop on World Bank’s Regional.
GREATER MEKONG SUBREGION CORE ENVIRONMENT PROGRAM Component 1: Environmental Planning Systems, Methods and Safeguards Improved Activity Progress and Component.
Research and Development Department 25 May 2009.
Bratislava, June 16-17, 2003 Getting Development Cooperation Work: Cooperation between the Ministry of Foreign Affairs and UNDP Inita Paulovica Assistant.
Slide 1 Bek Chee Jin Greater Mekong Sub-region Fifth Meeting of the Subregional Energy Forum (SEF-5) 11 November 2011 Ho Chi Minh City, Vietnam Harmonization.
1 WORKSHOP SUMMARY Nguyễn mạnh Cường, PhD 2 October 2007.
Initial thoughts on a Global Strategy for the Implementation of the SEEA Central Framework Ivo Havinga United Nations Statistics Division.
Project Monitoring and Evaluation in the GMS 7-18 May 2012, Mekong Institute, Khon Kaen Project Monitoring and Evaluation for Road Construction in Lao.
Regional Resources Centre For Asia and the Pacific 1 PROGRESS OF ACID DEPOSITION MONITORING NETWORK IN EAST ASIA (EANET) Ms. Adelaida B. Roman Coordinator,
By Bankole Ebisemiju At an Intensive & Interactive workshop on Techniques for Effective & Result Oriented Annual Operation Plan November 24th 2010 Annual.
Capacity Building Needs Assessment of MI Local Partners in Cambodia and Lao PDR/ Local Chambers of Commerce and Industry along East-West economic Corridor.
GREATER MEKONG SUBREGION CORE ENVIRONMENT PROGRAM GMS CEP-BCI Phase II Results Monitoring Framework GMS Environment Operations Center.
Activities being proposed by the UNISDR Secretariat.
Strategic Planning MRC first Strategic Plan for Revised in 2000: Current Strategic Plan Vision and Mission remain unchanged Goals updated.
The Governments of Cambodia, Lao PDR, Thailand and Viet Nam signed the; “Agreement on the Cooperation for the Sustainable Development of the Mekong River.
The World Bank Beyond Infrastructure: Trade and Transport Facilitation in the Greater Mekong Sub-region REGIONAL AND TERRITORIAL DEVELOPMENT: THE WORLD.
2 HISTORY OF MEKONG COOPERATION IRBP Course PP 6.1.
CAPACITY DEVELOPMENT FOR CDM IN VIET NAM Presented by Nguyen Mong Cuong Project CD4CDM - Viet Nam Outline  Overview of project  Project activities and.
The Mekong River Commission Presented by Mr. Detsada Soukhaseum, Mekong River Commission Secretariat, 16 November 2015.
Leadership in Development: Driving Change in the GMS Phnom Penh Plan for Development Management.
Applications of Cooling Technology and Active Packaging for Reducing Postharvest Losses of Highland Organic Produces Presenter’s full name: Noppol Leksawasdi.
Biofuels from Agricultural and Agro-Industrial Wastes Presenter’s full name: Noppol Leksawasdi Affiliation: Biofuels Network (Faculty of Agro-Industry,
The Second Regional Workshop on capacity development for Clean Development Mechanism Siem Reap, Cambodia, March 2004 REVIEW AND FUTURE PLAN OF TASK.
SRO DIRECTORS RETREAT: 24 TH JUNE 2015 DoA presentation on SRO operational capacity.
REGIONAL INIATIVES IN THE MEKONG REGION CAMBODIA | CHINA | LAO PDR | MYANMAR | THAILAND | VIETNAM.
Mekong Institute Strategic Planning Framework and Process.
MR. BOUNSOM PHOMMAVIHANE DIRECTOR GENERAL FOREIGN TRADE POLICY DEPARTMENT MINISTRY OF INDUSTRY AND COMMERCE, LAO PDR Lao PDR and the Integrated Framework.
Inception Report: 21st March, 2012
Regional Action Plan for Sustainable Transport of Dangerous Goods along the Mekong River Final Regional Workshop, October 2014 Bangkok, Thailand.
6 June 2007 Dias 1 Peter Furu DBL – Centre for Health Research and Development, Charlottenlund, Denmark WHO Collaborating Centre for Health and Environment.
Research and Development Department 22 June 2009.
10 NATIONAL VESSELS AND PORT WASTE MANAGEMENT OBJECTIVE: To establish efficient vessel and port waste handling in ports and terminals on the Mekong River.
1 Overview: The Greater Mekong Subregion (GMS) Economic Cooperation Program Overview: The Greater Mekong Subregion (GMS) Economic Cooperation Program.
Leadership in Development: Driving Change in the GMS Phnom Penh Plan for Development Management.
UNSD – DFID project: Country Directors’ Meeting 15 – 17 October 2014 Improving the collation, availability and dissemination of development indicators.
GREATER MEKONG SUBREGION CORE ENVIRONMENT PROGRAM GMS CEP-BCI FINANCIAL STATUS AS OF 30 TH SEPTEMBER 2012.
ILO TRIANGLE project Process and Procedures of Legal Labour Migration to Thailand Savannakhet, Laos PDR. November 2011.
Statistical Modernisation Community Padraig Dalton 8 March
Mekong River Commission, Tools to Implement the 1995 Agreement - Dr Choomjet Karnjanakesorn, WUP Team Leader 28-Apr-17 Mekong River Commission (MRC) Water.
SEAMEO RIHED Priority Activities and Programmes Area 6: Promoting Harmonization in Higher Education and Research.
Information for Decision-making for Sustainable Development (IDSD) Project A joint effort by the United Nations Division of Sustainable Development and.
Southeast Asia Primary Learning Metric (SEA-PLM) II CONSULTATIVE MEETING.
Project Debriefing Debriefing meeting on the implementation status of two ADB- JFPR funded projects: (i) Technical Assistance Strengthening Coordination.
Implementation of the IPS MDTF
OVERVIEW Project and Workshop.
Cambodia, Indonesia, Lao PDR, Philippines, Thailand, Vietnam
Lao PDR The World Bank collaboration with Lao PDR project – LAO Stat ‘Strengthening the Lao Statistics System’. Also, key learnings from the project that.
The plan to conduct a NSS review with ESCAP and PARIS 21
Viliami T Fakava LRD Biosecurity & Trade Support
Moving Forward in PFM for Sustainable Economic Growth and Development
Workshop on the operation of CRVS
Development of energy balance statistics
Human resource and Work flow of the Research Office, RUPP
Changing Viet Nam -New Phase of Development
Country Name Title of Presentation Fourth Project Support Meeting
DIAGNOSTIC FRAMEWORK: National Accounts and Supporting Statistics
Development of energy balance statistics
DIAGNOSTIC FRAMEWORK: National Accounts and Supporting Statistics
ACE II Project: Procurement Arrangement and Implementation
Viliami T Fakava LRD Biosecurity & Trade Support
Presentation transcript:

GREATER MEKONG SUBREGION CORE ENVIRONMENT PROGRAM GMS CEP-BCI Phase II NSU arrangements and implementation procedures GMS Environment Operations Center

GREATER MEKONG SUBREGION CORE ENVIRONMENT PROGRAM National Support Unit progress NSU structure and function discussed in Cambodia, PRC, Lao PDR and Viet Nam NSU to be established in Cambodia, Lao PDR and Viet Nam; NSU and 2 PSUs to be established in PRC General positions in each NSU / PSU – Project Coordinator/ Manager; in-kind contribution – Project Implementation Assistant – Finance & Administrative Assistant – Project Accountant/ Accounting Assistant – Other assistant positions as may be required NSU recruitment will be under LoAs

GREATER MEKONG SUBREGION CORE ENVIRONMENT PROGRAM NSU priorities for November 2012 to June 2013 Recruitment of NSU staff / resources Development of detailed work plan for country including activity timelines (in coordination with EOC staff) Activity implementation including lead role in institutional needs assessment Data collation & capacity building for development of Environmental Information System (EIS) Capacity building – Orientation Workshop on Finance & Administration after LOA has been signed – EOC-Conducted M & E Workshop

GREATER MEKONG SUBREGION CORE ENVIRONMENT PROGRAM Implementation Frameworks and Procedures (IFP) Procurements – Competitive basis – Three (3) quotations – Single Source Procurement Recruitments – CMS – Consultants – Resource Persons – Admin & Support Staff EOC Business Procedures – Recruitments – Procurements – Mission Travel – Etc.

GREATER MEKONG SUBREGION CORE ENVIRONMENT PROGRAM Q’s and A’s