September 30, 2003 NCSX Modular Coil Winding Form Prototype FDR1 NCSX Prototype Modular Coil Winding form FDR Phil Heitzenroeder PPPL September 30, 2003.

Slides:



Advertisements
Similar presentations
AS9102 First Article Inspection Report
Advertisements

1 PROJECT MANAGEMENT ROLE OF KEY PERSONNEL Bernd Madauss International Space University Strasbourg February, 2011
2-1 Chapter 2 Introduction b Why would a product designer choose a die casting over a component manufactured by another competing process? b What are the.
First Article Inspection Report
 Every stage from phase DESIGN in Software Development Process will have “design document” especially in analysis and design phases.  “Design document”
Process Specification Guidelines FAA/NASA Workshop 6 August 2002.
NCSX Vacuum Vessel Overview Paul Goranson WBS 12 Manager Vacuum Vessel Manufacturing Study Kickoff meeting April 29, 2003.
SE 555 Software Requirements & Specification Beyond Requirements Based on Weigers Chapter17.
Project Management Session 7
Systems Engineering Management
First Article Inspection
Design and Plans for Introducing Flexible End Parts Steve Krave 15 October 2013.
Degree and Graduation Seminar Project Management Processes
Construction Specifications
Project Management Process Overview
1 An Overview of the Request for Proposals for Production of NCSX Modular Coil Winding Forms [RFP F] July 12, 2004 P. Heitzenroeder, F. Malinowski,
Introduction to Software Quality Assurance (SQA)
N By: Md Rezaul Huda Reza n
System Planning- Preliminary investigation
Process Planning and Computer Aided Process Planning
Software Quality Assurance Activities
From Research Prototype to Production
© 2015 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.
NCSX Management Overview Hutch Neilson, NCSX Project Manager NCSX Conceptual Design Review Princeton, NJ May 23, 2002.
SC Project Review of NCSX, April 8-10, 2008 NSCX Poloidal Field Coils Michael Kalish.
Dec 12-14, 2005TBM Planning and Costing Meeting DCLL R&D Evaluations Summary Compiled by Neil Morley for the TBM Planning and Costing Meeting Dec 12-14,
FAILURE ANALYSIS Sources of failure - - Sources of failure - - Material Related Failures. Deficiency in Design. Service Related Failures. Environmental.
High strength materials are being increasingly used in designing critical components to save weight or meet difficult service conditions. Unfortunately.
NCSX NCSX Design Review Guide May 27, 2005 Wayne Reiersen NCSX.
1 Lecture #1: PD - Ch 1. Introduction Ref: Product Design and Development by Karl T. Ulrich and Steven D. Eppinger, McGRAW-Hill
M. Gilchriese - April 2001 Disk Sector Status. M. Gilchriese - April Technical Status Three prototypes to current dimensions(8-sector disks) except.
NCSX VACUUM VESSEL PL Goranson Thermal Insulation Final Design Review July 31, 2006 WBS12 NCSX.
The MIT/QA Plan Issue W. Reiersen. Terminology 1 Product specification: A document generated by the customer identifying requirements and the inspections.
Chapter 16: Product Design and Manufacturing
ETM 5131 – Capstone II Re-Development of New Component Implementation Process – Results By Scott Moeller.
NCSX NCSX TF Coil Procurement 1 February 3, 2006 Michael Kalish NCSX TF Coil Procurement.
Design Documentation Clint Kehres, Brian Krouse, Jenn Shafner.
NCSX NCSX Conceptual Design Review1 Manufacturing and R&D Phil Heitzenroeder for the NCSX Engineering Team.
Purpose and Goals of the NCSX Conference Call on Modular Coil Analyses February 25, 2004 ??
NSTX Response to the Lessons Learned Report NSTX TF Coil Repair Review September 3-4, 2003 Al von Halle.
Critical Design Review (CDR)
F. Dahlgren -SC Project Review of NCSX, April 8-10, 2008 PF, TF, & Trim Coil Supports (WBS-15) Core Base Support Structure (WBS-17) F. Dahlgren NCSX Coil.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
Evaluate Phase Pertemuan Matakuliah: A0774/Information Technology Capital Budgeting Tahun: 2009.
NCSX NCSX Vacuum Vessel R&D, Risk Management and Manufacture NCSX Preliminary Design Review October 7-9, 2003 Princeton, NJ Mike Viola, Phil Heitzenroeder,
Software Requirements Specification Document (SRS)
How the NCSX Project Does Business
September 10, FY 2003 Plans Bob Simmons. September 10, Introduction Overview of Project and Engineering Plans Project Plans Engineering Plans.
12/2/04Module 2C1 The NCSX Engineering Web – An Overview Part III Design Data, Fabrication, Assembly, and Installation Plans.
NCSX 21 March 2003 Reiersen - 1 PDR Preparations Wayne Reiersen NCSX Engineering Meeting 21 March 2003.
LAT-PR GLAST LAT ProjectManufacturing Readiness Review, Oct. 12, 2005 LAT Test Stand Manufacturing Readiness Review 1.Introduction Bill Olson.
NCSX VVSA / MCWF FDR A Systems Engineering Perspective Wayne Reiersen Bob Simmons NCSX VVSA / MCWF FDR May 19-20, 2004 PPPL.
1 WBS 1 Preparation for FDRs NCSX WBS 1 Engineering Meeting March 17, 2003 What establishes the plan? What are near term deliverables? How will we status.
Collaborating for Quality Quality Assurance (QA) & Quality Control (QC) in the Accelerator Project (ACCSYS) Matthew Conlon ACCSYS QA/QC
The Project Management Process Groups
Washington DC 14 December 2009 Standardization Power Christopher Loeser Distribution Statement A: Approved for Public Release.
 System Requirement Specification and System Planning.
NCSX Major Procurement Status July 20, Steady Progress on C1 and C2 The C1 was transferred to the 5 axis machine last Saturday; finish machining.
Prof. Shrikant M. Harle.  The Project Life Cycle refers to a logical sequence of activities to accomplish the project’s goals or objectives.  Regardless.
Doc.: IEEE /0185r0 Submission September 2006 Carl R. Stevenson, WK3C Wireless LLCSlide 1 IEEE WG Opening Report – September 2006 IEEE P
Casting of Steel Rolling is a metal forming process in which metal  stock is passed through one or more pairs of rolls to reduce the thickness and to make.
2K CB FDR Overview:  Agenda, Charge, Review Process
First Article Inspection
DSQR Training Control Plans
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
MRL 6 Artifacts (at End of TMRR) Page 1 of 6
First Article Inspection
Guide for successful completion of First Article Inspection Reports
Guide for successful completion of First Article Inspection Reports
Software Reviews.
Presentation transcript:

September 30, 2003 NCSX Modular Coil Winding Form Prototype FDR1 NCSX Prototype Modular Coil Winding form FDR Phil Heitzenroeder PPPL September 30, 2003

NCSX Modular Coil Winding Form Prototype FDR2 The Prototype Winding Forms  Each of the two winding form teams will produce one full-scale, fully machined “Type C” winding form.  The prototypes are expected to be virtually identical to the production forms.  Our intention is to only use the winding forms for development purposes. It is unlikely, but if no significant changes are made to the production winding form designs and specifications and if the prototypes meet requirements, we may consider using them in NCSX.

September 30, 2003 NCSX Modular Coil Winding Form Prototype FDR3 Goals of the Manufacturing Study / Prototype Fabrication  The winding form is a critical key component of NSTX. The most important goals of this effort is to gain experience fabricating such a highly shaped, closely toleranced casting. Important areas: casting quality and properties; dimensional control; permeability control; machining; cost and schedule control.  This fabricating experience will also reduce uncertainties and provide the basis for the subcontractors to develop firm cost and schedule proposals for the (18) production winding forms.  To provide a firm foundation for the “production” parts to be fabricated which meet their technical specifications on schedule and on cost. Process optimization with an eye towards the “production” phase (examples: reduced overcast allowance; changes in machining processes; changes in NDT).  To provide prototype winding forms that will be used to develop the winding manufacturing methods.  It’s a long shot, but if everything goes well with the prototype manufacture, they may be the first two winding forms for use in NCSX.

September 30, 2003 NCSX Modular Coil Winding Form Prototype FDR4 Major Elements of the Prototyping Effort Describe manufacturing methods. Choose the alloy for the casting. Manufacturing evaluation of candidate features. Describe mold fabrication. Perform flow/solidification analysis. Describe the casting process details. Describe post-casting processing: Non-destructive testing; Dimensional inspection & verification; Winding form repairs; Heat treatment; Machining and final finishing; Final inspection Recommend changes to design or specification. Preliminary Manufacturing / Inspection / Test (MIT) and Quality Assurance Plans for production coils. Prepare budgetary cost and schedule estimates.  Develop MIT / Quality Assurance plans for the prototype.  Actual manufacture of a Type C winding form prototype.  Develop Final MIT / QA Plans for the Production Winding Forms.  DEVELOP A FIRM FIXED PRICE AND SCHEDULE PROPOSAL. Done! Now To be completed by May ‘04

September 30, 2003 NCSX Modular Coil Winding Form Prototype FDR5 Documents, Reference Drawings and Pro-E Models  Statement of Work NCSX-SOW XX  Specification NCSX Product Specification NCSX-CSPEC for the Prototype Modular Coil Winding Form (September 30, 2003)  Drawings  SE ; Sheets 1-5.  Models Just released! The list of applicable models is defined in the Specification. Recognizing that procurement of castings is different than procuring a “finished” part inasmuch as the casting manufacturer needs to produce a model with certain features and characteristics required for their casting process:  Each Subcontractor will modify the models as required for their casting process: Add any required fillets, draft angles, “padding” where the wall thickness may be too thin for casting, and smooth surfaces as required to ensure “de- molding”. Subcontractors will return STEP files or Pro-E files of their modifications to PPPL/ORNL. PPPL/ORNL will verify that the essential dimensions and features are acceptable and, if acceptable, will formally approve them “FOR FABRICATION.”

September 30, 2003 NCSX Modular Coil Winding Form Prototype FDR6 This is Sheet 1 of the pdf reference drawings. This defines the tolerances required.

September 30, 2003 NCSX Modular Coil Winding Form Prototype FDR7 Essential Characteristics of the Casting Alloy  0.2% Yield strength: >180 MPa (>26 ksi) at room temperature (RT); >360 MPa ( >52 ksi) at 77K.  Ultimate tensile strength: >360 MPa (52 ) at RT; >690 MPa (99.7 ksi) at 77 K.  Elongation: 30% (min.) at RT and 77 0K.  Thermal conductivity: >9.7 W/m-K at RT; >7W/m-K at 77K  Electrical Resistivity: >83 x 10-8 -m at RT; >64 x 10-8 -m at 77K  The local relative magnetic permeability shall not exceed 1.02 Both Teams Have Developed Proprietary Alloys Which Meet These Characteristics.

September 30, 2003 NCSX Modular Coil Winding Form Prototype FDR8 Manufacturing / Inspection / Test / Quality Assurance Plans Will Guide the Production of the Prototypes and Production Articles A multi-step process is used to develop them: 1. A Preliminary MIT/QA plan was developed for the “production” winding forms. (May, 03)  This provided the basis for their budgetary price and schedule estimates which fed into our CDR plans.  We reviewed these plans with them via teleconference and these comments were fed into (2) below. 2. A Preliminary MIT/QA plan was developed for the “prototype” winding form. (September, 03)  This is essentially the same as that developed in (1) but limited specifically to the prototype.  We reviewed these plans with them via teleconference 3. Both teams are now finalizing the MIT/QA plans for the prototypes.  Mostly what remains to be done is a little “fine tuning” and to develop supporting procedures.  They’re developing schedules to make sure the various parts of the MIT/QA plans are finalized before their need date.

September 30, 2003 NCSX Modular Coil Winding Form Prototype FDR9 Special Situations  Poloidal breaks: electrical resistance shall be >500 k when tested at 100 vdc.  Machined surfaces: < 125 micro-inches RMS.  Defects and Repairs: Uniform “scallops” which may result from machining processes may be acceptable, subject to PPPL’s approval. Surface depressions with areas less than 4 sq. in. and no cracks may, with PPPL’s approval, be repaired by filling with a suitable filled epoxy. Major defects (ie, when the cavity exceeds 10% of the wall thickness or 1”, whichever is less or when the extent of the defect exceeds 10 sq. in.) shall be repaired by welding.

September 30, 2003 NCSX Modular Coil Winding Form Prototype FDR10 Next steps  Assuming a successful FDR, we will address any chits which may be submitted during this FDR (target date: 2 October.)  “Promote” the reference drawings and Pro-E models to For Fabrication. (target date: 2 October.)  Release Rev. 1 of NCSX-SOW-141-XX target date: 2 October.  Release Rev. 0 of NCSX-CSPEC (Product Spec. for the Prototype Winding Form) target date: 2 October. (note: this will be Rev. 0 because only a preliminary, unsigned draft has been used thus far).  The final step will be for L. Sutton to formally issue change orders to both subcontractors authorizing them to proceed with fabrication of the prototype, subject to finalization of their MIT/QA plans for them. Target date: Friday, 3 October.

September 30, 2003 NCSX Modular Coil Winding Form Prototype FDR11 Conclusion  This is not a typical FDR inasmuch as castings require the subcontractors to “refine” the customer’s drawings to produce castings from which the customer’s finished part can be attained.  The Subcontractor teams have really become an integrated part of the NCSX Team. They participated in geometry refinement and understand the “fine points” of developing these models extremely well. A good relationship for success has been developed.  The MIT/QA plans are not yet finalized, but we don’t believe this is an issue. This is taking time primarily because we insist on highly detailed, well backed up plans. This will assure that there be a detailed history of the prototype manufacturing details and will develop a the good quality culture these parts require. Back-up procedures need to be written yet,but otherwise the MIT/QA plans are almost done. Keeping the MIT/QA finalization ahead of needs should not be a problem.  We expect these MIT/QA plans to serve the needs of production phase with only modest changes. This is a good investment. We expect some simplifications and refinements as a result of the prototype experience.