1 RMS-QCS Introduction July 2006. 2 RMS & QCS Resident Management System (RMS) P rogram used by Government QA Personnel to support Construction Quality.

Slides:



Advertisements
Similar presentations
What Makes Up a FAS Package
Advertisements

DISTRICT FIVE CONSTRUCTION CONTRACT ADMINISTRATION UPDATE TRAINING Submission of Working Schedule Specification SP A.
Using EU-fin Interactive user manual for coordinators (Using EU-fin to the fullest)
Five Steps in 5 Minutes Close deals faster, more easily, more often! 1.Start a Quote: Input deal amounts and review the available lease options 2.Create.
09/04/2015Unit 2 (b) Back-Office processes Unit 2 Assessment Criteria (b) 10 marks.
US Army Corps of Engineers RMS Center – Apple Valley, CA 1 RMS Reports for Dummies May 2010.
Employee Self Service August 2010 InSITE Self Service Employee Self Service Presentation This presentation is approximately 15 minutes in length. This.
Contractor Module Training ( C-400 & Subcontract Agreements PDBS CONTRACTOR MODULE TRAINING Spring 2006 Contractor Module Overview Purpose of Contractor.
February 28, 2008 TRAINING UDOT Contractor PC USERTrust Vault World Wide Web UDOT Electronic Bid System Flow Chart.
July 2007 Health-e Web Entry. © ENS Inc, an INGENIX company. 2 Introduction  Before your installation appointment, complete the following: (Call your.
Welcome to Keyboarding Pro DELUXE ® Get Started Get Started Create Your Student Record Create Your Student Record The Main Menu The Main Menu Send Files.
Guide to using the myNATE website
Allied Health Systems Authorizations Website Tutorial and Walk Thru.
Online Demonstration You will be required to request a password prior to accessing Employee Online. The interactive password request forms are found.
1 ®  Overview Benefits of a Good Construction Schedule Baseline Schedule Development Schedule Updating and Maintenance Managing Project Changes USACE.
DePaul Bears Try Your Luck!. Why buy this product? Approximately 1,000,000 cell phone users Approximately 2,000,000 or more people play the lottery New.
Orientation: SMS Onboarding with RedCarpet July 2013.
PROACTIS: Supplier User Guide Contract Management.
Installing Ricoh Driver. Items you need to know IP address of Printer Options that are installed And Paper Sizes To get all this information you can print.
ONLINE CLAIMS TRACKING
1 Resident Management System – Quality Control System Introduction Version 2.38 May 2010.
RMS Overview July 2006.
STAY CONNECTED TOLLFREEEXPRESS CONTROL PANEL GUIDE.
CORE Volunteer Training Presented by: Key Functions in CORE July 21, 2014.
Introduction to our On-Line Self Service Center at
1 RMS Training Sponsored by the GRD - SBH January 2007.
1 RMS Training Sponsored by the RMS Center July 2006.
System for Administration, Training, and Educational Resources for NASA SATERN Overview for Learners May 2006.
Delight QuickBooks Online Banking Internal Support Training QuickBooks Windows 2009/2010 Online Banking.
1 State-Adopted Textbook Requests Procedures and Policies.
Welcome to Keyboarding Pro DELUXE ® Get Started Get Started Create Your Student Record Create Your Student Record The Main Menu The Main Menu Send Files.
Welcome to Managing the Finances of Your NHPRC Grant 1.
1 Resident Management System – Quality Control System Introduction Version 2.35 April 2005.
1 RMS-QCS Introduction April RMS & QCS Resident Management System (RMS) P rogram used by Government QA Personnel to support Construction Quality.
1 RMS Training RMS BASICS May Before you start RMS Six basic steps to success: 1.Establish offices (enter descriptions of offices) 2.Enter staff.
1 RMS Training RMS BASICS April Before you start RMS Six basic steps to success: 1.Establish offices (enter descriptions of offices) 2.Enter staff.
1 RMS Training Sponsored by the RMS Center May 2010.
Reports and Learning Resources Module 5 1. SLMS Primary Administrator Training Module 5: Reports and Learning Resources 2.
Step by Step Instruction: How to Conduct Direct Certification using the State Match Method Released January 2014 “How to Conduct Direct Certification using.
ASSIGNMENT 2 Salim Malakouti. Ticketing Website  User submits tickets  Admins answer tickets or take appropriate actions.
1 RMS Training RMS BASICS July Before you start RMS Six basic steps to success: 1.Establish offices (enter descriptions of offices) 2.Enter staff.
Managing Quality with Quality Through the Construction Management Leadership Manual Presented by: Aleksandr Sergek, PE, PMP Allison Justiniano, LEED AP.
START Electronic Field Book Goal Installing Field Book Program on the PDA.
Enter your employee ID #. Your emp ID # has to be 8 digits so you will need to add leading zeros to make it 8 digits. Password is the word ‘temp’ Click.
1 Introduction to MBProject. 2 Part I: MBProject and how it is used. Part II: What MBProject might do in the future. Also, as-built data collection and.
Quicx developed by Chinook Systems Inc. David Wampler, Software Manager Wanda Lenkewich, Owner 2014 buidlingSMART Challenge107-Jan-14.
Step 1 Lead Notifications Dear Partner, New leads have been assigned to your organization based on customer preference and are available for you.
Copyright © 2010 Pearson Education, Inc. or its affiliate(s). All rights reserved.1 | Assessment & Information 1 Online Testing Administrator Training.
Welcome to Greenville County’s Introduction of the new online Permitting System!
Installing RMS 3.0 Contractor Mode
Architecture Review 10/11/2004
Creating a new Central Data Exchange (CDX) Account (to access NetDMR)
Los Angeles Unified School District
Contractor Mode Administration Tab Overview
LMEvents SharePoint Portal How-to Guide
Contractor Mode Import/Export: Overview
Sponsored by the RMS Center
Materials Engineering Product Data Management (ePDM)
Student Registration/ Personal Needs Profile
Creating a new Central Data Exchange (CDX) Account (to access NetDMR)
Contractor Mode Finances: Overview
Creating a Manually- Entered Pay Estimate
QCS An Overview Savannah District Project Engineer 16 Nov 06
To the ETS – Encumbrance Online Training Course
Introduction to the ISB Intranet
Setting Up a New Contract
Quick reference: entering a requisition In escape RECEIVING AN ITEM
To the ETS – Encumbrance Online Training Course
Student Registration/ Personal Needs Profile
CSI Human Resource (HR) Data Collection Prep
Presentation transcript:

1 RMS-QCS Introduction July 2006

2 RMS & QCS Resident Management System (RMS) P rogram used by Government QA Personnel to support Construction Quality Management and Administration. Quality Control System (QCS) The quality control module of the main RMS program. It is the program to be used by Contractors to interface with the RMS program for both contract administration and quality control requirements.

3 QCS Incorporated Areas 1.Contract Administration (RFI’s, Contractor/Subcontractor Key Personnel) (Optional = Payrolls, Insurances, etc.). 2.Finances (Pay Request). 3.Submittals (Submittal Register/Transmittal Log). 4.Schedule (Manually entered or Imported via SDEF). NAS Schedules can’t be updated in RMS. 5.Quality Control (QC Reports, Prep/Initial Phase Inspection Reports, Deficiency Tracking- QA/QC Punch List Items, Features of Work, 3 Phase Inspections, Hazard Analysis, Warranty Items).

4 Activity Submittals QC/QA Tests Installed Property Transfer Property User Schooling QA/QC Punchlist Item Contractor/ Subcontractor Insurances WHO WHAT WHEN Start Date Finish Date WHERE Contract Phase Construction Area SF1413 Payrolls Activity Is Primary Link All these items have value assigned, can withhold payment. }

5 Activity Submittals QC/QA Tests Installed Property Transfer Property User Schooling QA/QC Punchlist Contractor/ Subcontractor Insurances WHO WHAT WHEN Start Date Finish Date WHERE Contract Phase Construction Area HOW 3 Phase Checks Rep Deficiencies Tech Notes SF1413 Payrolls Plans Specs Safety Issues Gov’t Provides Key Information

6 Planning, Scheduling and Control Matrix Basic steps to planning, scheduling and control: 1.Section 01312A – Quality Control System (Part of RMS) (* ) 2.Section 01310A – Project Schedule (* ) 3.Section 01451A – Contractor Quality Control (* ) (* = MasterFormat 2004 references)

7 QCS Main Contract Menus-I Administration Menu Items Optional

8 QCS Main Contract Menus-II Quality Control Menu Items

9 Data Submittal Requirements Data to be Submitted via QCS Export Files 1.Payment Requests 2.Requests for Information 3.Quality Control Data (QC Reports, 3 Phase Inspection Reports, QC Punch List Items, Warranty Items, Exposure Hours) 4.Submittal Registers/Transmittal Log 5.Activity Schedule

10 Import/Export of Data This Menu is used to Import/Export data from/to the Government. Exported data can be sent via .

11 Key Items for Contractors Using QCS Pay Activities : 1.Sum of all pay activities must equal the contract amount. 2.Ensure that each pay activity is assigned to only one Contract Line Item (CLIN) in your scheduling software. Numbering scheme of CLINS in your scheduling software (Primavera) must match that imported to QCS from RMS (i.e., include leading zero’s 0001).

12 Key Items (Continued) Pay Activities (Cont’): 3.See the QCS Manual for important information on the Standard Data Exchange File (SDEF). The SDEF exported from your scheduling program (I.e., Primavera) allows for the activity schedule to be imported to the QCS Program. You essentially have to perform the following to ensure the SDEF will upload to your QCS Program: (a) Install the P3SDEF.exe utility. This utility is contained in the P3 CD-ROM, or you can obtain from the Primavera website or RMS Website (under P3SDEF link).

13 Key Items (Continued) Pay Activities (Cont’): (b) Change the Activity Codes to the required COE format (SDEF). The required format (ten fields) is shown in the QCS User Manual and on the next slide. The Activity Codes format for your project must be changed prior to adding any activities. The Activity Codes in P3 should be able to be changed from the ‘Data’ Menu, by selecting ‘Activity Codes’ submenu. Just change and add activity codes to match the COE required ten fields. 4.The only known commercial “windows” scheduling software program that can interface directly with QCS is Primavera Project Planner (P3)

14 Key Items to Address Pay Activities (Cont’): This should be new Activity Codes Structure used on your project after modifying your Activity Codes in Primavera P3. Act Codes NameSizeSDEF Code Field 1WRKP3Workers per Day 2RESP4Responsibility Code 3AREA4Work Area Code 4MOD6Mod/Claim Code 5BID6Bit Item Code 6PHAS2Phase of Work Code 7CATW1Category of Work Code 8FOW110Feature of work (1 of 3) 9FOW210Feature of work (2 of 3) 10FOW310Feature of work (3 of 3) Required Activity Codes

15 Key Items to Address Pay Activities (Cont’): 5.Each pay activity should be assigned to a Definable Feature of Work (DFW). DFW’s can be assigned to pay activities in the QCS Program or in the Scheduling Software Program (if utilizing). If you are importing pay activities from the scheduling software program, but have not entered DFW’s, be sure to uncheck the ‘Features of Work’ import option under the NAS(SDEF) menu option, otherwise all DFW’s assigned in the QCS Program will be erased when Importing from the Scheduling Software using the SDEF.

16 Key Items to Address Contractor and Subcontractor Responsibility Codes : 1.Ensure that each pay activity is assigned to the responsible party (Contractor or subcontractor) performing the work. 2.If using the SDEF import from scheduling software, ensure that the contractor and subcontractor responsibility codes in your scheduling software package match those used in QCS (The Prime Contractor responsibility code should be ‘PRIM’). Database Backups: 1. Always backup your QCS database whenever extensive information is entered (i.e., after entering pay activities). Should backup database at least weekly.

17 3 Phase Inspections In order to utilize the built-in 3 Phase Inspection features of QCS, the Contractor must address the following items: 1.Enter all Features of Work (Per CQC Plan) 2.Load all Inspection Checks for each Feature of Work (should be done in the Library) 3.Prepare Activity Hazard Analysis for each Feature of Work (per EM ) (should be done in the Library)

18 QC Requirements The following QC requirements are tracked by RMS- QCS: 1.All QC Tests required by the Contract Specifications. 2.Required User Training. 3.Installed Property List (i.e., mechanical and electrical equipment installed, etc). 4.Transfer Property List (i.e., spare parts given to government, keys, etc).

19 Warranty Items The Government will initiate all Warranty Item actions from the RMS system as a result of periodic inspections of the completed facility during the Warranty period of the contract. This information will be exported to QCS for follow-up actions by the Contractor.

20 Submittal Management Submittal Register (Eng Form 4288) will be entered and maintained in QCS. QCS will be used to transmit all submittals via the Transmittal Log (Eng Form 4025). Transmittal Log numbers will be numeric only.

21 Printing of Hard Copies Hard Copies will still be required to be submitted on all items requiring signature, such as: 1.QC Reports 2.Prep/Initial Inspection Reports 3.Eng Form 93 (Pay Estimate Form) 4.Transmittal Log (Eng Form 4025)

22 RMS-QCS Website 1.Both the Program (QCSetup***.exe) and QCS User’s Manual are available at this website, under the Contractor’s web page. 2.There are NO User ID and Password required for downloads 3.Address (URL) –

23

24 RMS-QCS Questions?