Nov 6, 2005SSWG1 Robert Stobie Prime Focus Imaging Spectrograph Status Reassembly and retesting in Cape Town Estimated CTC $343,000 (7.3%) over PDR cap.

Slides:



Advertisements
Similar presentations
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Science Calibration & Instrument Status TIPS 20 Nov 2003 Last COS TIPS Aug 2003.
Advertisements

PALM-3000 Management Update A. Bouchez Team Meeting #9 10/22/2008.
PALM-3000 PALM-3000 Status A.H. Bouchez, J.E. Roberts Project 1640 Las Vegas Summit 1/28/2010.
PALM-3000 Instruments update A. Bouchez Team Meeting #9 22 Oct
Berkeley workshop summary Redundancy : dual detector Field of view : 3”x6” Spectrograph length goal: < 400 mm Isostatic mount on the base plate with control.
Oct 22, 2007SSWG #18 UKZN1 Robert Stobie Prime Focus Imaging Spectrograph Status Optics repair Schedule Status of other fix and improvement projects Budget.
The Michigan/Magellan Fiber System (M2FS): An MRI Instrument Development Proposal to NSF.
SALT Technology Development Lisa Crause India-South Africa Astronomy Workshop – SAAO 6 August 2012.
Corner Raft Test Station Kirk Arndt, Ian Shipsey Purdue University LSST Camera Workshop SLAC Sept , 2008.
18/19 January 2003IMACS SAC meeting update1 IMACS: Inamori-Magellan Areal Camera and Spectrograph Magellan SAC Status Report 18/19 January 2003 OCIW, Pasadena,
SALT HRS Lisa Crause for Durham CfAI & SALT Ops SALT Board Meeting #35, Chapel Hill, 5 June 2014.
August 2 and 3, 2010 Project Cost, Schedule, Risk and Contingency Jay Elias.
DEIMOS Presentation to the SSC January 25, Outline Quick overview of Budget and Schedule (web version has no Budget figures) Progress Since Last.
17/18 May 2003IMACS SAC meeting update1 IMACS: Inamori-Magellan Areal Camera and Spectrograph Magellan SAC Status Report 17/18 May 2003 Univ. of Michigan,
Oct 17, 2001SALT PFIS Preliminary Design Review Optical Integration and Test Plan 1 Southern African Large Telescope Prime Focus Imaging Spectrograph Optical.
SSWG Meeting #15: May 2006, Cape Town SSWG #15: 7 & 8 May SSWG Agenda: Sunday 7 th May 1.Welcome. Minutes of Previous meeting. Matter arising (David)09:00.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Status FUV Detector “1-bounce design” NUV Detector HST aberration fully-corrected Calibration.
Oct 17, 2001SALT PFIS Preliminary Design Review Fabrication and Test Plan 1 Southern African Large Telescope Prime Focus Imaging Spectrograph Fabrication.
Telescope Integration and Tests Tuesday Afternoon.
LBT Q Engineering Review Swing Arms (SWA) Apr-04LBT Q Engineering Review Highlights (Q4/2007) The PF SAs lost their cable trays The.
FLAO system test plan in solar tower S. Esposito, G. Brusa, L. Busoni FLAO system external review, Florence, 30/31 March 2009.
Magellan F/5 System Status A.Szentgyorgyi / Ann Arbor 25 Sept 2005.
Consortium Meeting La Palma October PV-Phase & Calibration Plans Sarah Leeks 1 SPIRE Consortium Meeting La Palma, Oct. 1 – PV Phase and.
Oct 17, 2001SALT PFIS Preliminary Design Review1 PFIS/ IMPALAS Issues Outside Reviewer's Comments Post-PDR tasks Valuation Issues.
May 22, 2007SSWG #17 UNC1 Robert Stobie Prime Focus Imaging Spectrograph Status Optics repair - in progress! Status of other fix and improvement projects.
Oct 30, 2003PFIS - Student Wkshop1 The Prime Focus Imaging Spectrograph – Old Challenges and New Ones K. Nordsieck, Principal Investigator Jeff Percival,
LBT Q Eng/SW Review TERC Tertiary Mirror Units Commissioning.
The Prime Focus Imaging Spectrograph Design and Capabilities
30 Nov 2005User Committee1 Instruments: NAC. 30 Nov 2005User Committee2 Instruments: NAC.
PACS IBDR 27/28 Feb 2002 PACS PI Summary1 Where we are and where to go… A. Poglitsch MPE.
May 17, 2004SSWG - PFIS Shared Risk1 PFIS Commissioning, Shared Risk, and Transition to Operations.
Oct 26, 2007SALT Workshop UKZN1 Robert Stobie Prime Focus Imaging Spectrograph Science Rationale Modes –Fabry-Perot Spectral Imaging –Grating Spectroscopy;
041103_SECCHI Status.1 SECCHI Status R.A. Howard STEREO SWG 2-5 May 2005 Hamburg Planetarium.
Oct 17, 2001SALT PFIS Preliminary Design Review1 Southern African Large Telescope Prime Focus Imaging Spectrograph Mechanical Mechanism Design Michael.
Oct 24, 2006SSWG1 Robert Stobie Prime Focus Imaging Spectrograph Status On-telescope throughput analysis Ghost analysis Repair plan Status of other current.
1 FVTX Detector Assembly Stephen Pate New Mexico State University (FVTX Assembly Management WBS 1.7) Stephen Pate, NMSU – FVTX Review – 16-Nov-2009.
I.Prochazka et al,ACES ELT meeting Spring 2014 European Laser Timing work progress Ivan Procházka, Josef Blažej (1), Jan Kodet (1,2) presented at T2L2.
Page 1HMI/AIA Science Meeting – February 13, 2006 HMI Instrument Status HM/AIA Science Meeting February 13, 2006 Barbara Fischer HMI Deputy Program Manager.
Apr 29, 2003SSWG1 Prime Focus Imaging Spectrograph Status Passed CDR- moving into fabrication phase Mechanism design complete: fabrication drawing packages.
Oct 17, 2001SALT PFIS PDR - Optics1 Optics Refractive Optics - Design rationale Performance Slitmasks Gratings Polarimetric Optics Risks and Concerns Kenneth.
Oct 10, 2002SSWG1 Prime Focus Imaging Spectrograph Status Engineering Status Optics Mechanical Control System Management Budget Schedule.
Mar 18, 2003PFIS CDR1 Control System Summary of Changes Since PDR All the motors, drivers, sensors, switches, etc. have been chosen Built up a mechanism.
FIRE: Status update and Preliminary Commissioning Plan Rob Simcoe (A. Burgasser, M. Smith, R. Bernstein, B. Bigelow, J. Pipher, C. McMurtry, W. Forrest)
Oct 17, 2001SALT PFIS Preliminary Design Review1 Operation Concepts Definition Document (OCDD) Chip Kobulnicky University of Wisconsin.
May 19, 2008SSWG #19 Göttingen1 Robert Stobie Prime Focus Imaging Spectrograph Status Optics repair positive progress: –UV efficiency –Some (repair-caused)
Oct 17, 2001SALT PFIS Preliminary Design Review Control System 1 Southern African Large Telescope Prime Focus Imaging Spectrograph Preliminary Control.
The SALT Development Committee Recommendations Regarding New Instruments (Matt Bershady) Rob Fesen Janusz Kaluzny Wolfram Kollatschney Darragh O’Donoghue.
FourStar Status SAC Meeting 13mar2010 Persson, Murphy, Birk, Monson, Kelson, Uomoto.
SALT Board Meeting #19: May 2006 Board Meeting #19: 8-9 May Astronomy Operations Now 3 SOs: Fred, Sandisa, Lucian (Francois resigned), with Charl.
Brenna Flaugher, PMG, April 6, 2007 DECam Funding Need Profile (Dec 06) (then yr $, Overhead included) This gave a technically driven schedule resulting.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA TIPS Cosmic Origins Spectrograph 20 September 2001.
MMIRS 1 Harvard-Smithsonian Center for Astrophysics Magellan SAC 9/05 MMIRS Status Upate Presented by A. Szentgyorgyi P.I. B. McLeod.
OsC mtg 15/10/2014 MICE Step IV Alan Grant. Content Step IV – Construction Status – Finances – Schedule – Risks – Summary 2.
Oct 17, 2001SALT PFIS Preliminary Design Review Management, Schedule, & Budget 1 Southern African Large Telescope Prime Focus Imaging Spectrograph Management,
The Prime Focus Imaging Spectrograph for the Southern African Large Telescope: Operational Modes Chip Kobulnicky – Instrument Scientist, University of.
Content Lessons from writing proposals and work on PTDR How can this meeting help to remedy problems SCT AOB.
LBT Q Engineering Review Swing Arms (SWA). 10-Jul-2007LBT Q Engineering Review Highlights (Q2/2007) The right secondary arm is wired and the.
Prime Focus Imaging Spectrograph Status
Jim Fast Pacific Northwest National Laboratory
Telescope Assembly, Integration and Verification (AIV) WBS 04C. 14 J
Astronomy 920 Commissioning of the Prime Focus Imaging Spectrograph
Prime Focus Imaging Spectrograph Status
COSMOS Status David Sprayberry, Sean Points & Jay Elias
Budget Budget Contingency/ Cost Risks Descope Options
Astronomy 920 Commissioning of the Prime Focus Imaging Spectrograph
Meeting 10 Longslit Spectroscopy Ken Nordsieck
Overview Instrument Role Science Niches Consortium science
Polarimetry: Waveplate Modulation; Calibration
Control System Summary of Changes Since PDR
Meeting 9 Slitmask Planning Ken Nordsieck
Presentation transcript:

Nov 6, 2005SSWG1 Robert Stobie Prime Focus Imaging Spectrograph Status Reassembly and retesting in Cape Town Estimated CTC $343,000 (7.3%) over PDR cap Delivered to Sutherland 30 Sept Installed on telescope 10 October Commissioning delayed by telescope readiness

Nov 6, 2005SSWG2 RSS/ PFIS Progress In Cape Town –Polarimetric optics received and tested –Flexure retest. Improved to ~50% above spec. Await telescope test to see if more improvement warranted –Fitted and aligned guider –Slitmask cutter brought up to spec; training performed –Etalons tested and calibrated –Detector baffling improved –Electronics box packaging/ glycol testing –Pre-Ship Acceptance Test Review

Nov 6, 2005SSWG3 Shipping Shipped to Sutherland Sept 29/30 In SALT spectrometer room –Short (control system) and long (optics integrity) form tests –Baffling closeouts –Cabling closeouts –Lift preparations

Nov 6, 2005SSWG4 Lift Lifted onto telescope 11 Oct

Nov 6, 2005SSWG5 Installation Alignment measured using SAC and RSS reference mirrors. Tip/ tilt in spec. Focus measured using guider and SALTICAM. Close. Nominal shims installed Cabling, detector cooling, glycol, air hookups Top Hex igloo (Elvis II) lifted and cabled for etalons First "old photons" 20 Oct. –20 Oct: Plate scale micron/arcsec; FWHM ~3" –30 Oct: Plate scale micron/arcsec; FWHM 2.2" (1.5" seeing) –Imaging limited by telescope (verified on SALTICAM) High-Level SALT-style control GUI installed First focus run with cal system ; verify optics integrity

Nov 6, 2005SSWG6 Best Image so Far.. 47 Tuc 5 secs 630 nm IF

Nov 6, 2005SSWG7 Problems/ Open Items Control System –articulation runaway. Solved? Will install safety strap –grating magazine sensor replacement. Done –waveplate encoders not homing –noise preventing stable etalon controller lock –occasional detector noise Mechanical –beamsplitter holder still in manufacture Software –TCS communications –magazine mapping layer –FITS keywords –turned over to Anthony Koeslag Telescope –poor IQ, lack of cal system limiting RSS activities

Nov 6, 2005SSWG8 Budget

Nov 6, 2005SSWG9 Budget: Cost-to-Completion increase ~190K from last meeting remaining budget deltas: commissioning completion

Nov 6, 2005SSWG10 Budget: Deltas Deltas (since last meeting)TotOver Cap –salaries$7K –Capital + Subcontract overruns$52K –RU Travel & Shipping$6K –UW Schedule stretch July -Oct$115K –RU Commissioning increases$16K Total$190K$343K (7.3%) Expected –Schedule stretch Nov-Dec$30K –Resale of CaF 2 spares ($10K) Total$20K Total$363K (7.7%)

Nov 6, 2005SSWG11 Commissioning; Schedule

Nov 6, 2005SSWG12 Some Commissioning and Calibration Observations StatusWhatTypeModeD/NSource TriedFocal Plane TiltCalibrationImagingNightStarfield TriedCenter of rotationCalibrationImagingNightStarfield TriedSlitviewer focusCalibrationAnyDayDome? BiasesCalibrationAnyCldy NightNone Shutter latency CalibrationImagingDayQTH flatfield Crosstalk calibrationCalibrationSpecDayNeon Spectr station posn CalibrationSpecDayPenrays FlexureCharactAllDayPenrays StartedImaging Focus: > 430 nmCalibrationImagingDayQTH Imaging Efficiency/ linearityCharactImagingNightPhot Std Fld Spec FocusCalibrationSpecDayPenrays Spec EfficiencyCharactSpecNight2 flux standards Polarimetric Efficiency >500 nmCalibrationSpecpolDayQTH Polarimetric Efficiency <500 nmCalibrationSpecpolNightBlue star Polarimetric PA, efficiency CalibrationSpecpolNight3 pol standards Instrumental PolarizationCalibrationSpecpolNight2 unpol standards

Nov 6, 2005SSWG13 Schedule Summary Commissioning schedule issues –availability of calibration system, autoguider, moving baffle –training of PFIS SA –operational maturity. Efficiency now < 20% –integration of commissioning and remaining telescope and payload tasks Payload commissioning –cal system flatness, stray light issues throughput good so far –moving baffle, pupil SW to run cals –guider throughput issue solved? significant ops SW required –stray light baffling QTH flat

Nov 6, 2005SSWG14 Handover and Commissioning SALT currently understaffed by ~2x Need to define/ schedule PFIS handover –After 9 Nov, only KHN and EBB available –After 13 Dec, team gone Commissioning tasks not likely to complete –MOS spectroscopy –High speed spectroscopy –All Phase II (ie PIPT, OCS) tasks

Nov 6, 2005SSWG15 Commissioning Holdups Suggested solution –turn over remaining tasks to SA's after acceptance –possible 2006 consulting trips by ebb, dh, khn (SALT funded) ModeHoldupby Dec 12? Acceptance (flexure, efficiency) Cal SystemOK ImagingImage QualityOK Longslit SpecCal SystemOK (hand guide) MOS SpecCal, Guider, SWNot likely High SpeedDtr SWNot likely Fabry-PerotNoisePossible PolarimetryCal, WP, BeamsplitterPartial?