Proposal for Improved CVP/SWP Integrated Operations.

Slides:



Advertisements
Similar presentations
California Water Balance. Water Reserved for the Environment.
Advertisements

MORE WATER Phase I Reconnaissance Report C. Mel Lytle, Ph.D. Water Resource Coordinator San Joaquin County Public Works Board of Directors Update February.
1 San Joaquin River Exchange Contractors Water Authority WEF- Central Valley Tour April 23, 2014 Mission Statement : To effectively protect the Exchange.
1 NODOS/Sites Reservoir: A Local Perspective Glenn Colusa Irrigation District July 2009.
Department of Water Resources Role in Water Transfers Jerry Johns, DWR
1 Water Planning & Stewardship Committee Item #6b Summary Subject: Review of Long-Term Delta Actions & Water Supply Planning Implications Purpose:To open.
San Gabriel Valley Water Forum August 28, 2012 San Gabriel Valley’s Water Supply A Plan for the Future San Gabriel Valley’s Water Supply A Plan for the.
Water Resource Division San Joaquin County Water Resource Management Planning Update C. Mel Lytle, Ph.D. Water Resource Coordinator San Joaquin County.
Tracie Billington, P.E. Chief Financial Assistance Branch Department of Water Resources.
1 Measuring Performance of Resource Management Responses Rich Juricich (DWR) David Groves (RAND)
Drought and the Central Valley Project August 2014.
Part 1 Operations, Facilities & Costs January February 4, 2003.
Use of Regional Agricultural Economic Models for Policy Analysis Stephen Hatchett CH2MHILL.
Delta Conveyance: Update on the Planning Process and Analysis of Water Supply and Costs CCWA Board of Directors February 25, 2010.
CALAFCO 2007 Annual Conference SUSTAINABILITY LAFCO’s Role in Meeting the Challenge Wednesday, August 29, 2007 Hyatt Regency, Sacramento 2007 California.
In-Delta Storage Process OverviewProcess Overview Program BenefitsProgram Benefits Project CostsProject Costs IssuesIssues Proposed Work Plan for FY 2003Proposed.
CALFED Finance Planning. Need for Finance Planning Status quo approach to rely so heavily on State bond funds unlikely in the future Existing funding.
Coordination Between NMFS and FWS throughout the OCAP Consultation Process Maria Rea, National Marine Fisheries Service Dan Castleberry, U.S. Fish and.
Fresno County Water Crisis and Opportunities. The Delta And Our Water Supply In August 2007 the Federal Court ruled that the Delta Smelt was in danger.
Integrating Water Management Statewide Integrated Water Management (IWM) Gary Bardini, Deputy Director IWM Rijkswaterstaat & California Coordination Kickoff.
Columbia River Water Management Program (CRWMP) Review of Year One Upper Crab Creek Planning Unit Meeting April 17, 2007.
Southern California Water Dialogue October 26, 2011.
Two Years Old: Walking and Talking - Poised to Run? Urban Water Institute: August 25, 2011.
California Geology - 4 California Water Project California has several major rivers, canals, and aqueducts.
1 The Rise of Regionalism in Water Resources John K. Woodling California Department of Water Resources North Bay Watershed Association Conference April.
44 th Annual Mid-Pacific Region 2011 Water Users Conference Water Supply Outlook Reno, Nevada January 26-28, 2011.
Managing Water and Fish: The 2014 California Drought William Stelle, Jr. NOAA Fisheries West Coast Region Seattle, Washington May 2014.
1 Development of Common Assumptions Common Model Package for the CALFED Surface Storage Investigations Presentation To: California Water and Environmental.
Integrated Regional Water Management MAY 22, 2015 TRACIE BILLINGTON DEPARTMENT OF WATER RESOURCES 1.
Region Acceptance Process Draft Recommendations Workshop Department of Water Resources Sept 8, Sacramento Sept 9, Los Angeles Sept 10, Fresno.
Urban Water Institute August 27, 2015 Managing the Colorado River during Drought.
Where to From Here Jerry Johns, DWR EWA Development of OCAP Proposal.
City-County Office of Metropolitan Water Planning 660 J Street, Suite 260 Sacramento, CA January IMPACTS ON LOWER AMERICAN RIVER SALMONIDS.
California Water Dialog March 24, 2010 Jerry Johns Deputy Director California Department of Water Resources.
IRWM Grant Program Scoping Meeting Department of Water Resources January 23, Sacramento January 31, Alhambra.
RBIG WORKSHOP 1 Supply Chain and Asset Management.
OCAP/SDIP Public Information Meeting Chet Bowling - Intro Ann Lubas-Williams – OCAP Andy Chu – SDIP Jerry Johns – EWA Ron Ott – Other CALFED Activities.
A Public Policy Lens on Storage, Conveyance and Operations Presentation to the Delta Stewardship Council Meeting July 23, 2015 John J. Kirlin, PhD Distinguished.
1 Climate Warming & California’s Water Future Jay R. Lund Civil and Environmental Engineering University of California, Davis
September 23, 2010 Overview of DWR’s Flood Management Activities Related to the Delta A Briefing to the Delta Stewardship Council 1.
1 Optimizing Flexibility and Value in California’s Water System Jay R. Lund Richard E. Howitt Marion W. Jenkins Stacy K. Tanaka Civil and Environmental.
Historical CVP and SWP Salvage and OCAP Loss Estimates Chinook Salmon, Steelhead Rainbow Trout, and Striped Bass Project Impacts in the southern Delta.
Upper San Joaquin River Basin Storage Investigation ACWA Regions 9 and 10 Carlsbad Water Summit U.S. Department of the Interior Bureau of Reclamation State.
Project Status South Delta Improvements Program Project Status November 2003.
CVPIA §3406(b)(2) Water Operations on the Sacramento River Sacramento River Conservation Area Forum Technical Advisory Committee February 7, 2012.
1 September 13, 2007 North-of-the-Delta Offstream Storage ACWA Regions 9 and 10 Carlsbad Water Summit North-of-the-Delta Offstream Storage ACWA Regions.
SWP/CVP Operations for Delta Salinity Management John Leahigh Principal Engineer State Water Project Water Operations California Department of Water Resources.
In-Delta Storage Program. Background and historyBackground and history Evolution of the fish screensEvolution of the fish screens Proposed Re-engineered.
Drought Management Sheri Looper CVP Water Resource Specialist.
Metropolitan’s SWP Supply Forecasting and Optimal Scheduling CWEMF Annual Meeting February 27, 2007 Peter Louie Metropolitan Water District of So. California.
Draft example: Indicators for water supply reliability and storage projects Presented by Steve Roberts (Department of Water Resources, Storage Investigations)
In-Delta Storage Program Reservoir Operations Stakeholders Committee Meeting January 22, 2003 Pal Sandhu.
1 Recommended Next Steps For Improving Quantitative Information California Water Plan Advisory Committee Meeting August 17, 2005.
1 The Wildlife Society Annual Meeting, Snowbird 2010 Robert S. Webb Climate Analysis Branch NOAA ESRL Physical Sciences Division Plus: NOAA NMFS; USDA,
Introduction Joint Presentation of State Water Contractors and San Luis & Delta-Mendota Water Authority.
MORE WATER Phase I Reconnaissance Report C. Mel Lytle, Ph.D. Water Resource Coordinator San Joaquin County Public Works Board of Directors Update February.
Water Resource Management Planning Update
2015 Urban Water Management Plan Overview
CWEMF Annual Meeting March 2005
Farhad Farnam, RPSIII, RA Economics Analysis Section
In-Delta Storage Program
Water Resource Management Planning Update
Drought Contingency Planning Efforts
In-Delta Storage Program
Summary of COA and Addendum
CBEWP Chino Basin Conjunctive Use Environmental
California Water Commission
Mutually Beneficial Partnerships in Groundwater Banking Paul Weghorst Irvine Ranch Water District August 15, 2019.
Claude “Bud” Lewis Desalination Plant
James Gilbert, PhD Nancy Parker
Presentation transcript:

Proposal for Improved CVP/SWP Integrated Operations

Proposal for Improved CVP/SWP Integrated Operations Proposal for Improved CVP/SWP Integrated Operations DWR, USBR, and CVP/SWP water contractors met in mid-July and developed a proposal for improved integration of the two projects DWR, USBR, and CVP/SWP water contractors met in mid-July and developed a proposal for improved integration of the two projects This proposal defines the context of discussions with DFG, USFWS, NOAA Fisheries, Bay-Delta Authority, and interested stakeholders regarding the components of the proposal and the characteristics of a long-term EWA. This proposal defines the context of discussions with DFG, USFWS, NOAA Fisheries, Bay-Delta Authority, and interested stakeholders regarding the components of the proposal and the characteristics of a long-term EWA.

Proposal for Improved CVP/SWP Integrated Operations Meeting necessary to resolve issues: Schedule of the CVP/SWP Operations Criteria and Plan (OCAP) Schedule of the CVP/SWP Operations Criteria and Plan (OCAP) Support for continuation of the EWA Support for continuation of the EWA Accounting under the Coordinated Operation Agreement (COA) Accounting under the Coordinated Operation Agreement (COA) Sharing of planned increased export capability (8500) Sharing of planned increased export capability (8500) Operation of DMC/CA Intertie Operation of DMC/CA Intertie

Proposal for Improved CVP/SWP Integrated Operations Components of the Proposal Conveyance SWP conveys up to 100,000 af of Level 2 waterfowl refuge supply SWP conveys up to 100,000 af of Level 2 waterfowl refuge supply CVP Storage Accounting Up to 75,000 af of CVP north-of-Delta water supply used to meet SWP Delta water quality/flow requirements Up to 75,000 af of CVP north-of-Delta water supply used to meet SWP Delta water quality/flow requirements

Proposal for Improved CVP/SWP Integrated Operations Components of the Proposal (con’t) Environmental Water Account Fully support EWA continuation Fully support EWA continuation Commit to developing a long-term EWA with DFG, USFWA, and NOAA Fisheries having adequate assets, operational flexibility, and financing Commit to developing a long-term EWA with DFG, USFWA, and NOAA Fisheries having adequate assets, operational flexibility, and financing ESA Commitments Multi-year, multi-species ESA commitment in exchange for long-term EWA asset commitments. Multi-year, multi-species ESA commitment in exchange for long-term EWA asset commitments.

Proposal for Improved CVP/SWP Integrated Operations Components of the Proposal (con’t) CVP/SWP Operations Criteria and Plan (OCAP) Include Freeport Regional Water Project, SDIP (8500), the DMC/CA Intertie, a long-term EWA, and the other components of the integration proposal. Include Freeport Regional Water Project, SDIP (8500), the DMC/CA Intertie, a long-term EWA, and the other components of the integration proposal. The associated Biological Opinion to cover these projects, and be considered a long-term opinion The associated Biological Opinion to cover these projects, and be considered a long-term opinion

Proposal for Improved CVP/SWP Integrated Operations Components of the Proposal (con’t) Delta Water Quality Implemented within a balanced CALFED Program, which includes projects to improve water quality Implemented within a balanced CALFED Program, which includes projects to improve water quality Upstream Reservoir Coordination SWP may borrow storage in CVP reservoirs for greater certainty in delivery allocation early in the year. SWP may borrow storage in CVP reservoirs for greater certainty in delivery allocation early in the year.

Proposal for Improved CVP/SWP Integrated Operations Components of the Proposal (con’t) San Luis Reservoir Coordination DWR develops a program to assure SLR storage does not drop below 200,000 af above dead storage. DWR develops a program to assure SLR storage does not drop below 200,000 af above dead storage. Program increases certainty of CVP delivery allocation early in the year. Program increases certainty of CVP delivery allocation early in the year. Storage for Water Transfers USBR stores for SWP contractors water obtained through transfer agreements. If reservoir enters flood control operations, stored transfer water first to spill. USBR stores for SWP contractors water obtained through transfer agreements. If reservoir enters flood control operations, stored transfer water first to spill.

Proposal for Improved CVP/SWP Integrated Operations Components of the Proposal (con’t) Operational Implementation Process Steps to improve coordination of projects to increase allocations earlier in the water year. Steps to improve coordination of projects to increase allocations earlier in the water year. COA Accounting Issues Agreement on accounting for new facilities/agreements (North Bay Aqueduct, Freeport Regional Water Project, SDIP, DMC/CA Intertie) Agreement on accounting for new facilities/agreements (North Bay Aqueduct, Freeport Regional Water Project, SDIP, DMC/CA Intertie)

Proposal for Improved CVP/SWP Integrated Operations Next steps Define process for stakeholder involvement Define process for stakeholder involvement Define the characteristics of a long-term EWA Define the characteristics of a long-term EWA Refine schedules of Integrated Key Milestones Refine schedules of Integrated Key Milestones