Type B Report - Draft Facts for Startle Hazard Event Collider-Accelerator Department 12-01-2009 Take 5 for Safety.

Slides:



Advertisements
Similar presentations
Gulf Petrochemical Industries Co. Turnaround Contractors – Ensuring the safety of our Manpower GPIC Bader Al-Mansoori Planning Superintendent.
Advertisements

Take 5 for Safety E. Lessard February 10, Electric Shock (Recordable, Reportable in ORPs and NTS) F&O Directorate, Description:  A BNL.
Job Loss Analysis Overview
Brookhaven Science Associates U.S. Department of Energy Brookhaven National Laboratory Collider-Accelerator Department FY06 Summary of Safety Feedback.
New Blueprint Project Impacting C-AD Mystery Injury Rate Pattern Photo of the Week Collider-Accelerator Department Take 5 for Safety.
Towards B+ HSS Assist Visit March Photo of the Week Collider-Accelerator Department Take 5 for Safety.
Hazard identification and Risk assessment
Determining the True Root Cause(s) of Accidents and Safety Incidents Incident Investigation and Analysis.
Accident Investigation State of Florida Loss Prevention Program.
1. Introduction 1.1. Fire program management involves the identification, evaluation, and control of hazards which may result in a fire OSHA & Emergency.
Take 5 for Safety Conduct of Operations – Control of Equipment and
CHAPTER 2 – ROLES OF CONSTRUCTION PERSONNEL IN SAFETY AND HEALTH
WHS Management Plans.
Safety Management Strategies for Extended Care Facilities.
Think safe. Act safe. Be safe. Supervisory Safety Leadership Training Best Safety Practice # 5 Identification of Injury Causes “Leading Indicators” Identifying.
USC Health and Safety Supervisor Training November 24 th and 25 th, 2011 Health & Safety Refresher PART 3.
TABLETOP EXERCISE 10 Step Process School Emergency Operations Plan Exercise Toolkit, Part 1 of 11. Colorado School Safety Resource Center (Department of.
OH&S Management System
Gulf of Mexico Simultaneous Operations Safe Work Practice
Emergency Action Plans Miriam Gradie Anderson Planning Specialist 608/ Wisconsin Department of Natural Resources.
Incident Reporting Procedure
Safety & Project Management by NABEEH JUM’AH. Eye on Safety  Proactive  Reactive.
SMS Operation.  Internal safety (SMS) audits are used to ensure that the structure of an SMS is sound.  It is also a formal process to ensure continuous.
Ert 312 LECTURE 4 OSHA & DOSH.
© 2012 Delmar, Cengage Learning Chapter 13 Regulatory Overview OSHA, PSM, and EPA.
1. Objectives  Describe the responsibilities and procedures for reporting and investigating ◦ incidents / near-miss incidents ◦ spills, releases, ◦ injuries,
Scenario Based Auditing
Accident Investigation. Accident Investigation Goals Preparing the investigation team Conducting the investigation Quiz.
Snow Collider-Accelerator Department Take 5 for Safety.
Emergency Procedures Within a workplace, there should be well-defined emergency procedures. Your employer is obliged to establish these procedures, and.
Hazards Identification and Risk Assessment
Hazard Communication Presentation Presented by: Western Assurance Corp Desert Utility & Paving, LLC and Century Club Construction, LLC Design © 2005, 2012.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Edward T. Lessard ESHQ.
Electrical Fire in Terminal Room at Collider-Accelerator Department Relay-Fire Investigation Committee
1.  Mission: Improve and operate accelerators, support the experimental program, and design and construct new accelerator facilities in an environmentally.
Using ISMS Principles and Functions in Developing an ARRA Readiness Review Process Presented by Linda K. Rogers Assessments & Readiness Programs Manager.
Collider-Accelerator Department EBIS Commissioning Accelerator Readiness Review (ARR) Work Planning Human Performance Ray Karol May 2010 EBIS ARR.
Integrating Human Performance Improvement Concepts and Tools into Work Planning CH2M HILL Hanford Group, Inc. September 12-13, 2006.
Specific Safety Requirements on Safety Assessment and Safety Cases for Predisposal Management of Radioactive Waste – GSR Part 5.
HSS Inspection of Environment, Safety, and Health Programs at BNL Accelerator Safety Workshop E. Lessard Collider-Accelerator Department August 12-14,
Hitting the Leadership Target Through Leadership and Accountability.
Collider-Accelerator Department EBIS Commissioning Accelerator Readiness Review (ARR) Conduct of Operations Administrative Controls Ray Karol May 2010.
Accident Analysis.
IX-1 MOD IX - ADDRESSING LEAD IN YOUR MAINTENANCE PROGRAM  Explain management’s role in a lead maintenance program  Outline the fundamental components.
Take 5 for Safety E. Lessard February 24, Tips on Procedures Responsibilities  Procedures should have a separate section listing responsibilities,
January 4, 2007 RHIC II Project Internal Cost Review Ed Lessard ESH D R A F T Project Overview.
Take 5 for Safety E. Lessard January 13, Readiness for High Consequence Risks: Accelerator Operations  Implementing procedures tie responsible.
Qualification & Training of Work Planners Steven K. Little Work Control Department Manager.
UC Davis Injury and Illness Prevention Plan Training
Project Specific Safe Work Plan Team Engagement Starts HERE!
Safety Documentation How do we organize it and what will be the contents? A. Funken, LIU Project Meeting, 26 th September 2013.
Revision N° 11ICAO Safety Management Systems (SMS) Course01/01/08 Module N° 9 – SMS operation.
Safety and Health Program Don Ebert- Risk Manager (509)
OHSAS Occupational health and safety management system.
Accident Investigation Basics Becky Pierson DOSH Consultation Revised: 07/2008.
Department of Defense Voluntary Protection Programs Center of Excellence Development, Validation, Implementation and Enhancement for a Voluntary Protection.
Illness & Injury Prevention Program (IIPP) The Town of Los Gatos’ Updated Illness & Injury Prevention Program (IIPP) A Roadmap to a Safer Organization.
Health and Safety Induction for Managers. Introduction This induction supplements the Health and Safety Induction for Staff and should be viewed by all.
Toolbox Meetings What is a toolbox meeting? An informal 5 to 15 minute meeting held by supervisors used to promote safety.
IIPP An Overview of the Injury and Illness Prevention Program.
Department of Defense Voluntary Protection Programs Center of Excellence Development, Validation, Implementation and Enhancement for a Voluntary Protection.
© BLR ® —Business & Legal Resources 1501 Accident Investigation.
Ray Karol 2/25/2014. BNL Work Planning Subject Area Subject Area revision to come out soon which requires permitted and worker-planned work to evaluate.
Department of Defense Voluntary Protection Programs Center of Excellence Development, Validation, Implementation and Enhancement for a Voluntary Protection.
OH&S Management System
Roadmap to COR.
12 Safe Maintenance Rules
Drive Laser Status and Hand-Off to Operations
Drive Laser Status and Hand-Off to Operations
Presentation transcript:

Type B Report - Draft Facts for Startle Hazard Event Collider-Accelerator Department Take 5 for Safety

Startle Hazard – Poor Work Planning Contributed (Type B Draft) No Scope of Work Work Order was generic: “move man-lifts;” no locations listed No Hazards Identification The work order did not list any hazards in the job description There were no modifications made to that work order to address hazards associated with 1005H once it was discovered the man lift was at that location No Hazard Controls Implemented In this accident, identification of the noise/startle hazard was deficient, so controls were never put into place However, there were two paths that led to this particular accident, one being the unidentified hazard path and the other being the path that brought the worker into contact with the hazard No Feedback and Continuous Improvement In July 2009, a sub-contractor working through F&O was painting the exterior of Building 1005H The automatic relief vent had been triggered at the end of the compressor run and it had startled the sub-contractor and he reported this to the F&O painting supervisor The F&O supervisor verbally communicated the incident to someone in the cryogenics group and it was confirmed that it was the expected operation of the compressor No further actions were taken and the feedback was not recorded on the work permit for the painting job 2

Startle Hazard – Unidentified Pulsed Noise Hazard Contributed (Type B Draft)  High dBA pulsed noise from reliefs not identified as a hazard:  1981: Building 1005H was constructed as part of ISABELLE project  1983: Safety Analysis Review conducted for the ISABELLE project was for all facilities including Building 1005H  1983: ISABELLE project was curtailed, and the Building 1005H was operated in a maintenance mode  1991: The Relativistic Heavy Ion Collider (RHIC) project began and, subsequently, start-up operations for Building 1005H were evaluated  1999: A Safety Analysis Document (SAD) and Accelerator Readiness Review were performed for RHIC, which included a review of 1005H  2004 – 2009: Facility Risk Assessments and Job Risk Assessments were performed for 1005H and work at 1005H as part of the OHSAS Standard  Noise surveys were performed at various times throughout 1005H history, both inside and outside, and they focused on continuous noise levels 3

Type B Report – Sections To Be Completed  Events and Causal Analysis  Conclusions  Judgments of Need 4

C-AD Actions  Review work order systems and work planning practices involving non-C-AD workers at C-AD and ensure they meet the requirements of OPM 2.28 for work planning  Meet with individual C-AD Groups and hold a critique session with each Group to learn about specific problems, drawbacks or glitches with the Group’s work environment, equipment, schedule, planning systems and/or procedures 5