Long-Term Implementation Plan (LTIP) Building Decision and Operational Support of Appropriate Management Response (AMR)

Slides:



Advertisements
Similar presentations
Chapter 7 Managing Risk.
Advertisements

Managing Risk CHAPTER SEVEN Student Version Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Designing educational opportunities for the emergency manager of the C21 st Neil Britton and John Lindsay.
PROJECT RISK MANAGEMENT
Copyright 2010, The World Bank Group. All Rights Reserved. Statistical Project Monitoring Section B 1.
Project Management.
DRAFT Strategic Planning U.S. Department of Energy Rebuild America Business Partners and Deanna Braunlin GAVIN Consulting, Inc. John Deakin Energy Program.
Wildland Fire Decision Support Tools Managing Long Duration Wildfires Workshop Salt Lake City, UT April 30 – May 1, 2008 Missoula, MT May 6-7, 2008 Wildland.
Chapter 7: Managing Risk
Last Update: 3/11/2015. When the complexity or magnitude of the incident(s) exceeds capacity of the local unit(s), Area Command will: Manage Type 1, 2,
What is a Long Term Implementation Plan Used for?.
This document is contained within the Fire Management Toolbox on Wilderness.net. Since other related resources found in this toolbox may be of interest,
Title slide PIPELINE QRA SEMINAR. PIPELINE RISK ASSESSMENT INTRODUCTION TO GENERAL RISK MANAGEMENT 2.
W ildland F ire D ecision S upport S ystem Overview April, 2008.
Risk Management. RISK RISK = the probability and severity of loss linked to hazards. RISK = the probability and severity of loss linked to hazards. The.
Unit 3: Command & Control IC/IMT Interface
Components of a Long Term Implementation Plan Spring 2008.
Communicating Fire Hazard Severity Zones and Wildland-Urban Interface Building Standards CAL FIRE Communications Office This presentation is for INTERNAL.
IS-700.A: National Incident Management System, An Introduction
Project Risk and Cost Management. IS the future certain? The future is uncertain, but it is certain that there are two questions will be asked about our.
Conference Call-In Information # 2012 Rocky Mountain Region WFDSS Refresher For Agency Administrators April 25, 2012.
This work was supported by Centers for Disease Control and Prevention Cooperative Agreement 1U01TP Public Health System Training in Disaster.
Managing Risk. Objectives  To Describe Risk Management concepts and techniques  To calculate and analyze a project using Probability of completion 
Risk management process
Fundamentals of Planning
BIFZ WFDSS What has Worked well….RCA Casey O’Connor—BIFZ Risk Complexity Analysis Feeding WFDSS Relative Risk (RR) and Organizational Assessment (OA) RCA.
Foundational Doctrine Guiding Fire Suppression in the Forest Service Product of the Pulaski Conference June 2005.
Risk Management, Assessment and Planning Committee III-4.
Incident Prioritization, Resource Mobilization & Allocation An Overview of NW MAC Operations And Resource Allocation Strategies February 18, 2015.
Tingxuan Liu Risk Management in Software engineering.
Wildland Fire Management RD&A National Interagency Fire Center Boise, Idaho Wildland Fire Management RD&A National Interagency Fire Center Boise, Idaho.
Logic Models and Theory of Change Models: Defining and Telling Apart
March 2008 FY 2008 Hazardous Fuels Program Direction Unified Targets/Accomplishments.
Software Project Management
Project monitoring and Control
Wildland Fire Management RD&A National Interagency Fire Center Boise, Idaho February 19, 2009 Wildland Fire Management RD&A National Interagency Fire Center.
Risk Management (I) Jeffrey Gilbert EcoZD coordinator EcoHealth Workshop, CENPHER, Hanoi 2013 Ecosystem Approaches to the Better Management of Zoonotic.
Wildland Fire Management Policy Procedures, Perspectives, and Implications.
Planned Public Relations
Wildland Fire Management RD&A National Interagency Fire Center Boise, Idaho Wildland Fire Management RD&A National Interagency Fire Center Boise, Idaho.
Ch 10 - Risk Management Learning Objectives You should be able to: List and describe risk management processes, inputs, outputs, and tools List and describe.
Chapter 13 The Incident Command System. Introduction Incidents come in all types and sizes As you become more skilled in size-up and applying strategic.
A Brief Look at Federal Wildland Fire Policy & WFDSS One Approach to Successful Implementation Dan O’Brien NWCC Fire Analyst March 31, 2008.
Managing Risk CHAPTER SEVEN Student Version Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Introducing Project Management Update December 2011.
SOFTWARE PROJECT MANAGEMENT
Managing Smoke and Emissions. A new system for managing smoke and emissions in Victoria that will provide for coordinated: Investment Service delivery.
CONTINGENCY PLAN. A contingency plan is a plan or procedure that will take effect if an emergency occurs. The objective of contingency planning is not.
Information System Project Management.  Some problems that org faced with IS dev efforts include schedule delays, cost overrun, less functionality than.
Risk Management. 7–2 Where We Are Now 7–3 Risk Management Process Risk –Uncertain or chance events that planning can not overcome or control. Risk Management.
Resources - Agenda Training - In Scope Thinking ahead Envisioning an outcome Communications Basic plans Risk identification Issue Identification CAP.
3 Unit 3. 3  Discuss the purpose of the National Incident Management System (NIMS).  Discuss the utility of NIMS at a fire incident.  Describe the.
5 chapter 420 PHCL Strategic Planning in Pharmacy Operations.
Central Sierra Interagency Resource Advisor Training Wildland Fire Implementation Plan Mike Beasley Fire Use Manager Yosemite National Park
Fire Prevention Education Team Organization 1A-01-P310-EP.
UNIT III. A managerial problem can be described as the gap between a given current state of affairs and a future desired state. Problem solving may then.
Public Health System Training in Disaster Recovery (PH – STriDR) This work was supported by Centers for Disease Control and Prevention Cooperative Agreement.
POLICY, PLANNING, & MANAGEMENT OBJECTIVES S-244 Field Observer & Fire Effects Monitor Goals Objectives Monitoring.
Chapter 13 Risk Management. Chapter Objectives 1.Define risk and risk management 2.Outline key risk issues and types of risk 3.Identify concrete methods.
RISK MANAGEMENT FOR COMMUNITY EVENTS. Today’s Session Risk Management – why is it important? Risk Management and Risk Assessment concepts Steps in the.
EMS Seminar #4 – Disaster Preparedness Joseph Ip BSc (Hon), MSc, MD VGH Emergency May 28, 2002.
Modification of Interagency Strategy for the Implementation of Federal Wildland Fire Management Policy February 2009 Modification of Interagency Strategy.
 Define Risk Management  Cover Employer and Employee Responsibilities  Types of Emergencies and Critical Incidents  Emergency Preparedness  Ten Stages.
Writing and updating strategic and annual plans Richard Maggs Astana September 2014.
ON “SOFTWARE ENGINEERING” SUBJECT TOPIC “RISK ANALYSIS AND MANAGEMENT” MASTER OF COMPUTER APPLICATION (5th Semester) Presented by: ANOOP GANGWAR SRMSCET,
Prescribed Fire Effects Monitoring
Why Special Events are Special
Business Continuity Plan
Recognization and management of RISK in educational projects
A New Concept for Laboratory Quality Management Systems
Presentation transcript:

Long-Term Implementation Plan (LTIP) Building Decision and Operational Support of Appropriate Management Response (AMR)

Objectives Understand how Long Term Implementation Plans in the decision process associated with Appropriate Management Response (AMR) Grasp the relationship between the LTIP, WFSA, Letter of Delegation and IAP Develop an understanding of the thought processes involved in developing, using and validating a LTIP

Appropriate Management Response Spectrum MANAGE WILDLAND FIRE Appropriate Management Response Protection ObjectivesBenefit Objectives i.e. reduce fire intensity or prevent fire spread into values to be protected such that loss in minimized. Accomplished by actions to halt, delay, detain, and/or slow fire spread, focused protection actions on values to be protected, or full perimeter control. i.e. use of wildland fire to achieve benefit, reduce hazardous fuels, provide wildlife habit, support fire dependent communities, etc. May employ protection tactics to offset negative factor and maximize benefit

Where Long-Term Implementation Plan fits in the decision process Land/Resource Management Plan Pre-attack planning –(Unplanned fire) - Strategic Fire Size-up Initial Response Extended Response Wildland Fire Situation Analysis (WFSA) Long Term Implementation Plan

What is a Long-Term Implementation Plan? A strategic plan for managing an unplanned, long duration wildland fire with protection objectives Complements the WFSA Needs to be included in the letter of delegation Details where, when, and how of actions required to protect identified values

When to do a Long-Term Implementation Plan? Any time a fire is expected to be of a long duration, as determined locally compared to historic fire durations. Typically, think in terms of lasting more than 7 days (the limit of weather forecasting).

Considerations when doing a Long-Term Implementation Plan Contain a level of analysis commensurate with the complexity of the event Uses the WFSA values, cost projections, spatial and temporal alternative Probability of success Available Resources now and in the future

Uses of the Long-Term Implementation Plan Document a risk assessment Provide implementation actions needed to mitigate or eliminate threats Recognize the need for continuity of management for the long duration Defines acceptable management limits and when the assessment should be reviewed

Long-Term Implementation Plan Suggested Contents Incident specific objectives Weather conditions and drought prognosis Long-term risk assessment Identification of values to protect Threats - Assessment of risk on values to protect –hazards identified, probability of event occurring and consequences of failure Mitigation Action(s) to protect values Monitoring actions to ensure objectives are being met Resources Needed to Manage the Fire –Identify when and for how long Information/Communication plan Contingency Actions Estimated costs Signatures of agency administrator and incident commander

How to Prepare the Long-Term Implementation Plan Local unit fire, resource and planning staff with support from zone or geographic area coordination centers Comparable to WFIP Stage III – adapted to recognize protection objectives Weather and drought can be support by Predictive Service products Risk assessment –The 4-step risk assessment process (value, hazard, probability, and relative risk) is appropriate for long-duration wildfire events. Mitigation Actions defined to reduce the probability of a hazardous event

Preparation (continued) Resources needed to implement mitigation and perimeter control actions need to reflect realistic availability and performance based on time of year and duration fire season Communication plan to provide the messages and ensure the information reaches all applicable audiences Contingency actions to plan for the unexpected and have a reserve on hand Estimated Cost to project expenditures over the duration of the fire, don’t forget what has been expended to date

What to do with the Long-Term Implementation Plan Monitoring and mitigation actions with required resources should feed the Incident Action Plan (IAP) Actions are conditional base on time, location and current conditions As conditions change periodic updates are needed Track the progress of implementing the plan

Things to Remember Risk analyses should consider both current risk and deferred risk –Understand that an acre protected from fire today will burn eventually –The future may present different circumstances, challenges and opportunities Just because we write doesn’t mean someone else will understand it –Be simple, clear and concise –Provide enough information that those who follow will understand the intent of the actions described Provide contact information so when questions come up there can be follow-up

Objectives Understand how Long Term Implementation Plans in the decision process associated with Appropriate Management Response (AMR) Grasp the relationship between the LTIP, WFSA, Letter of Delegation and IAP Develop an understanding of the thought processes involved in developing, using and validating a LTIP

How Can Line Officers Gain Understanding? Participate in Shadow Assignments Host an IMT Participate in Reviews, CPRs and RFRs Pre-season Line Officer trainings/meetings DISCUSSION OF LONG-TERM IMPLEMENTATION PLANNING Perspective is only in your mind - Whether the sun is rising or setting the view may look the same and all you have to go by is what direction you are facing.