March ‘08G. Ruggiero Totem Collaboration Meeting Roman Pot Detectors 1 st RP Detector Assembly RP vs DCS and DB CERN Open day.

Slides:



Advertisements
Similar presentations
José C. Da Silva OFF DETECTOR WORSHOP, April 7, 2005, Lisboa SLB and DCC commissioning for 904.
Advertisements

Quark Net 2010 Wayne State University Physics Department.
MICE RF TEST STAND Major Milestones (2006) –Testing of BURLE 4616 circuit September 2006 –Testing of 4616 circuit with full amplitude and phase control.
Architecture Project. Your project You are to research different classical types of houses. You will prepare a poster and paper. You will complete the.
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
TOTEM Collaboration Meeting, Feb. 2005, F. Haug, CERN Cooling System for TOTEM Friedrich Haug and Jihao Wu Cryogenics for Experiments CERN TOTEM Collaboration.
PCB issues requirements & procurement MMM Würzburg, 30/01/2014J. Wotschack1.
ISR Work Progress Report Muon Week April 10 th 2003 A. Benvenuti INFN Bologna.
TGC Big wheel Sector assembly plan Tatsuo Kawamoto ATLAS workshop 2005.
Gueorgui ANTCHEVNEC’2013 – Varna, Bulgaria 1 The TOTEM Experiment Consolidation and Upgrade G. Antchev * On behalf of the TOTEM Collaboration * INRNE-BAS,
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
PHENIX WEEKLY PLANNING 2/15/2007 Don Lynch. 2/15/207 Weekly Planning Meeting 2 Remaining Schedule StartComplete Cosmic Ray Run (Run 6.9)In Progress All.
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
Status of: CLIC Two-Beam Module Magnets R&D and Procurement 1 Michele Modena, CERN TE-MSC IWLC10, WG8, 21October 2010.
L. Greiner 1IPHC meeting – May 7, 2012 STAR HFT Plans for the next year A short report on HFT/PXL plans for post May 2012 TPC – Time Projection Chamber.
DCS T0 DCS Answers to DCS Commissioning and Installation related questions ALICE week T.Karavicheva and the T0 team T0 DCS Answers to.
V. Cindro, Jožef Stefan Institute, Ljubljana, Slovenia DAQ, DCS, Power Supply and Cables Review CERN, March Electrical PP1 Basic features Electrical.
1 MICE Tracking Detectors Malcolm Ellis NFMCC Meeting 12 th March 2006.
Construction and Installation Readiness of TOTEM Roman Pots Detectors Federico Ravotti (PH/TOT) Gennaro Ruggiero (PH/TOT) LHCC minireview – 06 May 2009.
Status of the NO ν A Near Detector Prototype Timothy Kutnink Iowa State University For the NOvA Collaboration.
S. Zelepoukine CMS Electronics Status Report: ECAL Detector Control System S. Zelepoukine IHEP Protvino/ETHZ
Cooling Systems Adopted For the Use in the Particle Detectors 1 V. Vacek AGENDA: What we can offer for the the AFP R&D Project: Two cooling systems (Aircooler.
Roman Pot Engineering Design Review CERN, 14 February 2006 M.Oriunno, CERN PH-TOT Installation, Commissioning and Schedule.
RP detectors CTS Sensors now in production, full delivery between February and June 07 Production GUI and DB being finalised Test Procedure being defined.
Chamber construction Construction Tools Production sites Assembly Sequence (“travelers”) Manpower P. Campana LNF – LHCb Muon EDR Cern April 16 th, 2003.
Outlook Production of the 12 DPs (220m Stations) Installation of the DPs in the LHC Tunnel Status of the RP Systems/Services Resources Production of DPs.
ASPERA-3 Mar. 25, 01 Monthly Status Report ASPERA Monthly Status ReportMonthly 3_25/ Page 1 Monthly Status Report Report due 3/25/01 Schedule statused.
Progress report Collaboration meeting 23-SEP-2009
1 HBD update Itzhak Tserruya DC Upgrades meeting, January 14, 2005 NIM paper II: Generic R&D ~ completed Full scale prototype construction Pending issues.
Update on the Triple GEM Detectors for Muon Tomography K. Gnanvo, M. Hohlmann, L. Grasso, A. Quintero Florida Institute of Technology, Melbourne, FL.
All CMS 30 May07 TSV1 All CMS 3 30 May 2007 LHC machine CMS Progress Overall Schedule.
Detector Cooling CERN, September 28, 2006 Jaak Lippmaa HIP, University of Helsinki.
Tasks and time scale T. Tsuboyama (KEK). DSSD production Test production by Micron and SINTEF (Talk by M. Valentan) HPK decided to restart DSSD business.
March 19, 2013W. Bertl, PSI Status of BPIX Cooling Activities W. Bertl, PSI.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
New Forward Detectors for CMS Krzysztof Piotrzkowski Universite Catholique de Louvain, CP3 Center XVII International Workshop on Deep-Inelastic Scattering.
Walter Snoeys – CERN – PH – ESE – ME –TOTEM October 2009 TOTEM Electronics Status.
Dec
Gennaro Ruggiero CERN, PH Depart. Planar Edgeless Detectors for the TOTEM Experiment On the behalf of the TOTEM Collaboration
Reported by G.Feofilov at the NA61 meeting , CERN, EVO.
Tile HCAL status Felix Sefkow CALICE Technical Board Review April 19, 2007.
AFP – Technical Status 1.Cost estimates 2.Manpower estimates 3.First Actions AFP Kick-Off 03FEB Michael Rijssenbeek.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
G. Ruggiero / TOTEM 1 Si Edgeless Detectors in the RPs Edgeless detector (on the old “AP25 module”) active edges (“planar/3D”) planar tech. with CTS (Current.
Towards the Work-package with LHCb for the LHCb upgrade DT-LHCb coordination meeting 13 January 2015.
J. Valls, CMS L2-L3 Meeting, Sept ROD Production at CERN  ROD Flow During Production  ROD Flow at CERN  ROD Testing Areas  Infrastructure  Equipment.
T2 Status Report IP5 Installation Future plans. IP5 installation The mechanical structure has shown problems on installation and should be changed slightly.
D.Macina TS/LEATOTEM Meeting25/02/2004 Roman Pot test at the SPS Test of the Roman Pot prototype in the SPS proposed in December 2003 (CERN/LHCC ):
Total Cross Section, Elastic Scattering and Diffraction Dissociation at the LHC Calendar for 2004   March   May   30 June -1 July  
WPO – ITN management & HR Seamus Hegarty HR-RPM 12-month review,
Walter Snoeys – CERN – PH – ESE – ME –TOTEM June 2008 Electronics WG Report TOTEM Electronics’ Status.
RF Pick-Up Measurements in the 2004 SPS Testbeam Before installation of silicon detector assemblies in the Roman Pot: Antenna insertions for measurement.
Extreme Energy Events M. Abbrescia Extreme Energy Events Data taking 20 BILLIONS candidate tracks!
WP2 (Detector development) Summary Gabriella Pugliese INFN – Politecnico of Bari.
Preparation & Commissioning of TOTEM for the Run-II of LHC S.Giani on behalf of the TOTEM Collaboration.
Status of the Experiment RRB - TOTEM 16 April 2013 S.Giani - CERN on behalf of the TOTEM Collaboration CERN-RRB
PSL APA Update May 3, 2016 UW Physical Sciences Lab.
“Medium Term”: VFAT2 + SRS readout system
Testbeam Planning Common to all testbeams:
TOTEM Electronics Status
Introduction Status before the 2009 run Results from the 2009 run
T1 Electronic status Conclusions Electronics Cards:
Title of the thesis/topic (Calibri Bold 60)
nSW Alignment Installation
10/month is the present production rate 2 FTE + sporadic contributions
MicroMegas Mechanical Meeting --- Cern April 2014
CMS RPC Endcap RE1 Status Report
MICE Coupling Coil Update
PNPI – M3R4 – Panels 70% - HV bars 100% - FR4 frames 100%
Presentation transcript:

March ‘08G. Ruggiero Totem Collaboration Meeting Roman Pot Detectors 1 st RP Detector Assembly RP vs DCS and DB CERN Open day

March ‘08G. Ruggiero Totem Collaboration Meeting The 1 st RP Detector package The first package has been fully tested and assembled Vfat and detector testing made with the trans. board in the H8 system

March ‘08G. Ruggiero Totem Collaboration Meeting Towards the first assembly… The detector package has been mounted on the “champignon”…the next step would be mounting the MB. The piping and capillaries will be then mounted the same way it has been already done for the Thermal Prototype

March ‘08G. Ruggiero Totem Collaboration Meeting Next Steps For the RP Hybrids: Testing and assembling procedures are being defined for the mass production Lab spaces are also under preparation 10 new hybrids delivered, more to come (see Walter) For commissioning the RP Detector Packages Preparation for testbeam setup Preparation of a Cosmic Ray setup (parallel to testbeam) –(Federico looking after the hardware procurement) …Still things to define RP and DCS Almost all requirements for the DCS are now clear Within 10 days a new version of the requirements paper and the full naming scheme RP and DBs The management of the data relative to the construction of the DB is being structured now.

March ‘08G. Ruggiero Totem Collaboration Meeting CERN Open Days 5 th and 6 th of April 5 th from 9 to16 and 6 th from 8 to19 Photo Exposition –~9 Panels 1x2m 2 (landscape) for Photos i.e. 18 High Res Photos (A1) with descriptions –6 photos per detector… Who could be there? 2 full-time people (or 4 shifts…) TOTEM Experiment Poster on Surface at IP5 –for general public Being drafted now Visit in the Tunnel (sect. 56 up to the Roman Pots) –Call for volunteers for tunnel visit by the 19 th of March –At least 6 half-day slots to cover Our contact persons are Beatrice and Virginia

March ‘08G. Ruggiero Totem Collaboration Meeting Volunteer’s Table __________K.Eggert __________K.Eggert G. Ruggiero __________ F. Ravotti ________ Photo Exposition Tunnel Visit 5 th of April6 th of April5 th of April6 th of April Morning Afternoon