City of Waltham Building Department 119 School St, Lower Level Waltham, Ma 02451 Tel. (781) 314-3275 Fax (781) 314-3286 Supplemental Sheet Metal Information.

Slides:



Advertisements
Similar presentations
Contracts for Builders Ross Kinzler, Executive Director.
Advertisements

CREATING AN ACTIVITY SET-UP (Project Set-up) Contract Summary Screen Contract Activity Screen.
ECTS- European Credit Transfer System Student Application form Academic year _ _ _ _/_ _ _ Dates of proposed exchange from: _ _ _ _ to: _ _ _ _ Field of.
Identifying Tricare Insurance for Medicaid Recipients Using the PARIS FEDERAL FILE Presented by Stefanie Johnson, MBA Business Analyst New Hampshire Department.
Cursory Review of New Alarm, Extinguisher and Sprinkler, Tags and Labels February 2006.
F Instructions for Completing the Report of Construction Contractor’s Wage Rates Form WD-10.
Standards Aligned Systems MANDATE WAIVER PROGRAM 2008.
Application for Employment Equal access to programs, services and employment is available to all persons. Those applicants requiring reasonable accommodation.
2012 CALIFORNIA BUILDING DEPARTMENT SURVEY REPORT INTERIOR DESIGN COALITION OF CALIFORNIA.
Energy Rating Index Performance Path Speaker Name Speaker Affiliation.
UAI Top Reasons For Medicare Supplement Business Pending For Training Only © 2013 United American Insurance Company. All rights reserved.
Vineland Commercial Site Address: 7626 N. Vineland Ave. (A.P.N ) 7634 N. Vineland Ave. (A.P.N ) 7630 N. Vineland Ave. (A.P.N )
Area Commissions Purpose Area commissions are established to afford additional voluntary citizen participation in decision-making in an advisory.
2015 Residential Mechanical Contractors Codes Forum Thank you for taking the time to join us today. We know you are busy and your time is valuable. Our.
Private Applicator Record Keeping Requirements It’s the Law! Commercial and private applicators and agencies must keep records on all pesticides applied.
Welcome to the 2015 Prevailing Wage Survey Tutorial This tutorial will assist you in the process of completing Survey Forms. If you still have questions.
Implementing State Density Bonus Law in Berkeley November 13, 2014 City of Berkeley Planning & Development Department.
WORK STUDY PROGRAM SAN JUAN VA SCHOOL CONFERENCE MARCH 5-7, 2008.
Workshop on Management of Intellectual Property by Photographers Beijing, China, December 8 and 9, 2005.
Certificates of Insurance Primer Marcia Berner Property & Casualty/Surety, Program Director ACORD Two Blue Hill Plaza, 3rd Floor Pearl River, NY
Application for Employment
Chapter 2 Licensing BCN 4772 Summer Licensing Licensing allows the government to regulate industries –To protect the public –Establish standards.
FILING REQUIREMENTS FOR THE SURPLUS LINE ASSOCIATION OF CALIFORNIA THE SURPLUS LINE ASSOCIATION OF CALIFORNIA CREATING A BATCH.
Filing Requirements for the Surplus Line Association of California
Community Development Department GRAND HAVEN DEVELOPMENT OF REGIONAL IMPACT City Council June 3, 2014.
Landlord Utility Services Work Instructions. To enter the portal, simply enter your assigned User ID and Password, provided by Consumers Energy. Log In.
Housing Safety and Zoning Code Enforcement Initiative Zoning.
RETURN TO FREE! Return Signed forms to: The undersigned participant and his/her parent or legal guardian (hereinafter “the undersigned”), if the participant.
PLANNING DEPARTMENT CITY OF PEARLAND PLANNING DAY MARCH 13, 2008.
Showcase Individual Application Form 1. Family Details Were You Born In The Philippines Y or N If you circled Y what city were you born in__________________________________________________.
How to Select and Pre-screen a Home Improvement Contractor.
Revised 12/27/13 Supplier/Vendor Instruction Manual Presented by Department of General Services, Procurement Division Office of Small Business & DVBE Services.
© 2012 Cengage Learning. Residential Mortgage Lending: Principles and Practices, 6e Chapter 14 Residential Real Estate Appraisal.
Insurance Terms & Related concepts (40%) General Property Insurance (Product Knowledge Pertinent to Adjusters) (40%) Texas Statutes and Rules Pertinent.
© 2009 by South-Western, Cengage Learning SAMIRLANDER Chapter 1.
Training II: Software, Publications, IP, and Export Control Issues L. Meixler Many researchers tend not to regard software as IP. They often share software.
FESTIVAL OF THE KINGS Event Division(s) Registration _____Logged Circle the event number(s) you are entering as listed on the Divisions sheet. No. of Events.
TMK Top 5 Reasons Medicare Supplement Apps Pend TMK
Search details: Enter country, dates and times of pick up and drop off.
MASSACHUSETTS UNDERGROUND STORAGE TANK (UST) DATA MANAGEMENT SYSTEM COMPLETING THE COMPLIANCE CERTIFICATION MassDEP, Bureau of Air and Waste.
Preliminary Traffic Accident Report Date: __________________________ Time: ____________________ (AM / PM) ___________ City:_________________ State: ______.
Children System of Care Application Process for Behavioral Assistance & Intensive In-Community Department of Children and Families, Children’s System.
ALBUQUERQUE SOARING CLUB MEMBERSHIP APPLICATION AND AGREEMENT Date:___________ PLEASE PRINT NAME:____________________________________AGE:____NICK NAME/CALL.
Subcontractors and Suppliers Procedures for Receipt of Payment.
Property Valuation Adelaide
Revised 2/1/2011. Parts 1-4 are self-explanatory. The PIN number is obtainable through City Planning or on-line GIS maps. PLEASE TYPE OR PRINT 1. Project.
Dallas Area Rapid Transit Pre-Bid Conference Event #B Purchase and Install 5 Generators February 25, 2016.
Ways To ApplyMail City of Newark Parks & Recreation Department 220 South Main Street Newark, DE Walk In (Monday - Friday 8:30am - 5pm) City of Newark.
DUAL FUEL HEAT PUMP REBATE APPLICATION Name:__________________________________________ Co-op Account #_________________________ Address where appliance.
South Central Economic Development District. Community Development Block Grants For Housing Housing grants support rehabilitation of owner- and renter-occupied.
FIRST REPORTS OF INJURY MAKING THEM WORK FOR YOU.
Express Mail Offers: Overnight delivery to most locations Money back guarantee Receives expedited handling from acceptance to delivery Express Mail label.
1 Gables Gateway. 2 1.Comprehensive Plan Text Amendment 2.Comprehensive Plan Map Amendment 3.Zoning Code Text Amendment 4.Change in Zoning 5.MXD3 Mixed.
General Operations Limitation on Use of Funds Termination of Assistance Other Program Requirements.
1 Villa Laguna MXD3 Site Plan Review. 2 Request: The applicant is requesting site plan review of a proposed mixed-use project pursuant to the recently.
Diligent Search Report (SL-2 Form) Deconstructed
Petrolia Ball Hockey League
Remodeling for Real Estate Agents
DIVISION OF REAL ESTATE
Remodeling for Real Estate Agents
2007 Allocation of US Tax Payments to Beneficiaries
Commercial Contracts: An In-Depth Look
Marine Cargo claim form
Updates to the Traffic Reduction and Transportation Improvements Fee (TR/TIF) City Council July 24, 2017.
Cool Roof Rebate Program
For Medicare Supplement Business Pending
SALES RECEIPT Downloaded from
INVOICE Downloaded from
NATIVE AMERICAN FEMALE
INDEPENDENCE POLICE DEPARTMENT
Presentation transcript:

City of Waltham Building Department 119 School St, Lower Level Waltham, Ma Tel. (781) Fax (781) Supplemental Sheet Metal Information for Building Permit Applications Date: _______________ Plans Submitted (Check appropriate box) Yes ___ No ___ Estimated Job Cost $_____________ Job Location (Street & Number) _________________________________________________ ____ Residential ____ Commercial____ New Work ____ Renovations Applicants License # __________________ Business License #______________ J-1/M-1 unrestricted License J-2/M-2 restricted to dwellings 3 stories or less and commercial up to 10,000 sq. ft. / 2 stories or less Residential: 1-2 family_____ Multi-family _____ Condo/Townhouse _____ Other _____ Commercial: Offices ___ Retail ___ Industrial ___ Educational ___ Institutional ___ Other ___ Square Footage: Under 10,000 sq. ft. ________ Number of Stories __________ Business Information: Firm Name: _____________________________ Telephone ( ) _____________________ Address: _________________________________________________________________ License Information: Licensee Name: _______________________________ Signature of Licensee: ___________________________ Property Owner Information: Name:________________________________ Telephone ( ) _____________________ Address: _________________________________________________________________ Type of License _ Master _ Mater-Restricted _ Journeyperson _Journeyperson Restricted _ Other ____________ Must Fill Out Number of Items Installed DamperScreenChimney/Vents Air termination return terminal Watershed roof system Bathroom fan/exhaust Mixing boxKitchen HoodDuct access door LouverSound Trap Air handling ductwork: tested: adjusted or air balanced Sheet Metal Work to be Completed: HVAC ___ Kitchen Exhaust System ____ Metal Watershed Roofing ____ Metal Chimney/Vents ____ Air Balancing ____ Provide details description of work to be done _______ ________________________________________ ________________________________________________________________________ INSURANCE COVERAGE: I have a current Liability insurance policy or its equivalent which meets the requirements of M.G. Ch. 112 Yes __ No __ If you have checked Yes, indicate the type of coverage by checking the appropriate box below: A liability insurance policy ____Other type of Indemnity ____ Bond ____ OWNER”S INSURANCE WAIVER: I am aware that the licensee does not have the insurance coverage required by chapter 112 of the Massachusetts General Laws, and that my signature on this permit application waives this requirement. Check One Only _________________________________________________ Owner ____ Agent ____ Signature of Owner or Owners Agent By checking this area ___, I hereby certify that all of the details and information I have submitted (or entered) regarding this application are true and accurate to the best of my knowledge and that all sheet metal work and installations performed under the permit issued for this application will be in compliance with all pertinent provision of the Massachusetts Building Code and Chapter 112 of General Laws.