1 Calculation of BGS-CIEP Hourly Energy Price Component Using PJM Hourly Data for the PSE&G Transmission Zone.

Slides:



Advertisements
Similar presentations
MISO Day 2: A Transmission Users (Marketers) Perspective Leon White August 8, 2007.
Advertisements

Summary of Proposed Market Rules For Transition Period Price-Responsive Demand and Active Demand Resources in the Forward Capacity Market Henry Yoshimura,
1 Illustrative Results Based on E3’s Avoided Cost Model Thursday, April 19, 2012 Marginal Generation Costs.
Copyright 2003 PJM 1 PJM’s Annual FTR Auction.
Duke Energy Ohio Standby Rates Jim Ziolkowski, P.E., Rates Manager September 13,
2015/16 changes to the winter time-of-use peak periods and tariff charge name changes.
PJM©2014www.pjm.com Winter 2014 Overview & Recent and Upcoming Market Rule Changes Adam Keech Director, Market Operations.
Energy Storage Definitions/Definitions ETWG 18 Feb 2013.
MISO’s Midwest Market Initiative APEX Ron McNamara October 31, 2005.
1 Northeast Public Power Association Electric Utility Basics Electric Rates and Cost of Service Studies.
Susan Covino Senior Consultant, Emerging Markets March 31, 2015
1 Managing Revenues in Regulated Industries Rate Design May 2008 Richard Soderman Director-Legislative Policy and Strategy.
ANALYZING YOUR ELECTRIC BILL Bob Walker Met-Ed November 7, 2007.
PG&E’s General Market Virtual Net Metering Schedule NEMV
COMPETITIVE ELECTRICITY MARKETS March 15, PA Customer Choice Legislation  Distribution service remains regulated by PAPUC.  Transmission service.
Overview of LMP Markets Features of ISOs / RTOs David Withrow Senior Market Economist Fall 2007 Meeting of the NARUC Staff Subcommittee on Accounting and.
North American Electricity Markets APEX Paris, France October 15-16, 2007 Kenneth Laughlin, PJM.
ASSOCIATION OF ENERGY ENGINEERS – SW OHIO PJM AND OHIO REGULATORY CHANGES HOWARD PETRICOFF VORYS, SATER, SEYMOUR & PEASE LLP 1.
1 American Electric Power Company Transmission Formula Rate AEP East Companies Annual Formula Rate Update June 2012.
Progressive Energy Solutions, LLC July 28, 2010 NYMEX N. Illinois Hub Electric Prices 12-Month Forward Prices Through July 15, 2010 * NEU Electric and.
Nodal Pricing in an LMP Energy Market
©2003 PJM Factors Contributing to Wholesale Electricity Prices Howard J. Haas Market Monitoring Unit November 30, 2006.
Cost of Service Indiana Industrial Energy Consumers, Inc. (INDIEC) Indiana Industrial Energy Consumers, Inc. (INDIEC) presented by Nick Phillips Brubaker.
PJM © PJM Overview ARIPPA Valley Forge, PA November 8, 2007.
Welcome New York Independent System Operator. (Pre-NYISO) Regulated Market Physical contracts Regulated industry Cost Based System Two Party Deals Bundled.
Need for Transmission Investment 2010 Mid-American Regulatory Conference AEP.
BGS-CIEP Rate - Energy Components (Continued)
Overview of the North American and Canadian Markets 2008 APEX Conference in Sydney, Australia October 13, 2008 Hung-po Chao Director, Market Strategy and.
VisTaTech Center Schoolcraft College September 14, 2006 Partners in Business Meeting 2007 Attachment O.
©2004 PJM 1 STATE OF THE MARKET REPORT 2003 Joseph E. Bowring Manager PJM Market Monitoring Unit FERC Briefing Washington, D.C. April 14, 2004.
THE PJM INTERCONNECTION STATE OF THE MARKET REPORT 2001 Joseph E. Bowring Manager PJM Market Monitoring Unit Federal Energy Regulatory Commission June.
Reactive Power Federal Energy Regulatory Commission Open Meeting December 15, 2004.
OSC Meeting April 27, Transmission Cost Allocation Overview.
1 Bilateral Interconnection Agreement Model Presented to HAPUA Working Group 5 (ESI Services), Project 6 By Power Purchase Agreement Division Electricity.
1 The Costs of Participating in Restructured Wholesale Markets American Public Power Association February 5, 2007 William M. Bateman Robert C. Smith.
1 Westar Energy’s 2013 Annual Transmission Revenue Requirement Meeting October 30, 2012.
PJM©2013www.pjm.com Economic DR participation in energy market ERCOT April 14, 2014 Pete Langbein.
Attachment to Testimony of Joseph Bowring Ohio Energy Mandates Study Committee April 16, 2015.
PJM©2012www.pjm.com PJM’s Experience with Capacity Markets Terry Boston President & CEO PJM Interconnection Power Across Texas September 21, 2012.
©2005 PJM 1 STATE OF THE MARKET REPORT 2004 Joseph E. Bowring Market Monitor FERC Briefing April 13, 2005.
PJM©2015 Updates to PJM Load Forecast Model OPSI Annual Meeting October 12, 2015 Tom Falin Manager – Resource Planning
PJM© Demand Response in PJM 2009 NASUCA Mid-Year Meeting June 30, 2009 Boston, MA Panel: Price Responsive Demand – A Long-Term Bargain.
1 Energy Storage Settlements Consistent with PUCT Project & NPRR461 ERCOT Commercial Market Operations May 8, 2012 – COPS Meeting May 9, 2012 – WMS.
2016 Attachment O Projected Net Revenue Requirements Customer Meeting October 29, 2015.
Emergency Demand Response Concept Overview and Examples Presented to: ERCOT December 3, 2004 Presented by: Neenan Associates.
1 SMD and Efficiency Programs Standard Market Design (SMD) –Implemented March, 2003 –Major feature, locational assignment of costs and locational price.
Illinois Wholesale Market Update December 10, 2003.
Wholesale Electricity Spot Market (WESM)
New Incentives for Pursuing Demand Response Scott Strauss and Sean Flynn Spiegel & McDiarmid APPA Legal Seminar San Francisco – November 2004.
INTEGRATING WIND ENERGY WITH ELECTRIC SYSTEMS ERIC HIRST Consultant in Electric-Industry Restructuring Bellingham, WA December.
PJM©2014www.pjm.com State of Demand Response Stu Bresler Vice President- Market Operations PJM Interconnection 10 th OPSI Annual Meeting October 13, 2014.
1 Energy Storage Settlements Consistent with PUCT Project & NPRR461 ERCOT Commercial Market Operations June 27, 2012 – ETWG Meeting.
1 Before Ghana Public Utility Regulatory Commission Proposed Electricity Tariff Guidelines Workshop Ahmed Kaloko,Ph.D. Chief Economist Pennsylvania Public.
1 Dr. Ahmed Kaloko Chief Economist Pennsylvania Public Utility Commission Harrisburg, Pennsylvania Transition from Public Service to Competitive Markets.
1 Energy Storage Settlements Consistent with PUCT Project & NPRR461 ERCOT Commercial Market Operations November 2, 2012 – RCWG Meeting.
Buying electricity. Calculating the units of electricity The amount of electrical energy (i.e. the amount of electricity) used by an appliance depends.
1 A Conversation about MISO Paul Spicer November 8, 2007.
Texas Nodal Program ERCOT Readiness & Transition (ERT) Supplemental Information TPTF January 12, 2009 Kevin Frankeny.
1 The End Of Price Freeze Service (PFS) For Schedule P Customers Presentation To The Maryland Public Service Commission by Wayne Harbaugh March 4, 2002.
Smart Grid Tariff Changes
SMECO Demand Response filing
Calculation of BGS-CIEP Hourly Energy Price Component Using PJM Hourly Data for the PSE&G Transmission Zone.
Narragansett Electric Rate Classes
NPRR829 Incorporate Real-Time Telemetered Net Generation for Non-Modeled Generation into the Real-Time Liability Estimate ERCOT PRS Meeting May 11, 2017.
Energy Storage Settlements Consistent with PUCT Project & NPRR461
Calculation of BGS-CIEP Hourly Energy Price Component Using PJM Hourly Data for the PSE&G Transmission Zone.
Westar Formula Rate and your bill
Mike Mumper & Brian Kick Good afternoon
Calculation of BGS-CIEP Hourly Energy Price Component Using PJM Hourly Data for the PSE&G Transmission Zone.
PA Supplier Workshop Net Metering September 10, 2019.
Presentation transcript:

1 Calculation of BGS-CIEP Hourly Energy Price Component Using PJM Hourly Data for the PSE&G Transmission Zone

2 BGS-CIEP Rate Components – Terms New Jersey Sales and Use Tax and Losses are to be added where applicable. BGS Energy Transmission PJM Residual Metered Load Aggregate Locational Marginal Price (LMP) in PSEG zone (hourly charge is posted under Real Time LMP for PSEG zone on Transmission Capacity (charge based on PJM Tariff ) Ancillary Services (charge based on PJM tariff) Generation Capacity Reconciliation Customer will be billed the PJM price multiplied by the customer’s kWhr usage in the concurrent hour. See Tariff Sheet No. 82 for current charge Varies monthly, see Tariff Sheet No. 84 for current charge. See Tariff Sheet No. 83 for current charge

3 BGS-CIEP Rate - Energy Components Real-Time Energy Market or PJM LMP Price –The PJM load weighted average residual metered load aggregate locational marginal price (LMP) is a real- time spot market price (Prior to June 1, 2015, the PJM load weighted zonal average LMP was used). –Customers on the BGS-CIEP rate will be billed the load-weighted hourly average price in the PSEG zone, as posted by PJM multiplied by that customer’s kWhr usage in the concurrent hour.

4 BGS-CIEP Rate - Energy Components (Continued) Ancillary Services Charge –For PJM administrative charges and; –Other generation-related items necessary for electric grid stability. –Charge is an overall average of various PJM Tariff charges. BGS Reconciliation Charges –Recovers the difference between monthly amount paid to BGS suppliers and the total revenue received from BGS customers for the preceding months for the applicable BGS supply. –Charge changes each month, and can be positive or negative (e.g. a charge or a credit).

5 BGS-CIEP Rate – Capacity Components BGS Capacity Charges (Generation) –Charges per kilowatt of Generation Obligation. –The charge recovers generation capacity costs, based on customer’s allocated share of overall summer peak load on PJM system. BGS Transmission Charges –Charges per kilowatt of Transmission Obligation. –Recovers customer’s share of PSE&G transmission system costs, based on overall summer peak load for PSEG. –Charge is set by PJM OATT (tariff). –Subject to change periodically on the effective date of the PJM rate as approved by Federal Energy Regulatory Commission (FERC). All Charges subject to Sales and Use Tax (SUT) – where applicable

6 Data Sources - Energy Price Data from PJM Select markets & operations

7 Data Sources - Energy Price data from PJM Select Energy Market

8 Data Sources - Energy Price data from PJM Select Hourly LMPs (monthly files)

9 Data Sources - Energy Price data from PJM Select monthly file with “rt” designation for “Real Time”. Note “da” is for “Day Ahead” pricing and is not used for BGS-CIEP

10 PJM Residual Metered Load for PSE&G – for 6/1/15 Price is shown in dollars per megawatt-hour (Use “Total LMP” column for each hour)