MICS4 Survey Design Workshop Multiple Indicator Cluster Surveys Survey Design Workshop The MICS4 Process.

Slides:



Advertisements
Similar presentations
MICS 3 DATA ANALYSIS AND REPORT WRITING. Purpose Provide an overview of the MICS3 process in analyzing data Provide an overview of the preparation of.
Advertisements

Multiple Indicator Cluster Surveys MICS3 Regional Training Workshop General Structure of a Country Survey Plan.
Multiple Indicator Cluster Surveys Regional Training Workshop I - Survey Design Objectives of the Workshop.
MICS4 Survey Design Workshop Multiple Indicator Cluster Surveys Survey Design Workshop Training of the Field Staff.
MICS4 Survey Design Workshop Multiple Indicator Cluster Surveys Survey Design Workshop Objectives of the Workshop.
MICS4 Survey Design Workshop Multiple Indicator Cluster Surveys Survey Design Workshop MICS4 Technical Assistance.
MICS4 Survey Design Workshop Multiple Indicator Cluster Surveys Survey Design Workshop The MICS3 Evaluation.
MICS4 Survey Design Workshop Multiple Indicator Cluster Surveys Survey Design Workshop General Structure of a Survey Plan.
The MICS3 Process. By now we have decided to do a MICS3 We have answered these questions: Why is the survey being done? How will the survey results be.
Tips and Resources IASC Cluster/Sector Leadership Training
Guidance Note on Joint Programming
Session No. 4 Implementing the State’s Safety Programme Implementing Service Providers SMS
Multiple Indicator Cluster Surveys Survey Design Workshop MICS Technical Assistance MICS Survey Design Workshop.
1 Field Management: Roles & Responsibilities Partially Adapted from Multiple Indicator Cluster Surveys (MICS) Regional Training Workshop – Survey Techniques,
1 CREATING AN EFFECTIVE CENTRAL HARMONIZATION UNIT PEM-PAL WORKSHOP FOR INTERNAL AUDIT OFFICIALS Moldova, June 2007 Dr. Darius MATUSEVICIUS Financial.
SAI Performance Measurement Framework
High level expert meeting to develop the Near East Regional Action Plan to Implement the Global Strategy to improve Agricultural and Rural Statistics.
The state of the art: DHS and MICS
INITIATING THE PLANNING PROCESS. CONTENT Outputs from this stage Stage general description Obtaining government commitment Raising awareness Establishing.
1 Fieldwork Roles & Responsibilities Adapted from Multiple Indicator Cluster Surveys (MICS) Regional Training Workshop – Survey Techniques, Unicef.
Comprehensive M&E Systems
Action Implementation and Monitoring A risk in PHN practice is that so much attention can be devoted to development of objectives and planning to address.
Coordinating Center Overview November 18, 2010 SPECIAL DIABETES PROGRAM FOR INDIANS Healthy Heart Project Initiative: Year 1 Meeting 1.
Quality evaluation and improvement for Internal Audit
Regulatory Body MODIFIED Day 8 – Lecture 3.
Multiple Indicator Cluster Surveys Survey Design Workshop Data Analysis and Reporting MICS Survey Design Workshop.
OPTIONS AND REQUIREMENTS FOR ENGAGEMENT OF CIVIL SOCIETY IN GEF PROJECTS AND PROGRAMMES presented by Faizal Parish Regional/Central Focal Point GEF NGO.
MICS Survey Design Workshop Multiple Indicator Cluster Surveys Survey Design Workshop Overview of MICS Tools, Templates, Resources, Technical Assistance.
Sub-regional Workshop for the Gulf Countries to Launch the Education for All National Assessments Sharjah, June, 2013 National EFA 2015 Review Technical.
MICS Survey Design Workshop Multiple Indicator Cluster Surveys Survey Design Workshop Overview of the MICS Process.
1 Training Issues Adapted from Multiple Indicator Cluster Surveys (MICS) Regional Training Workshop – Field Staff & Training Issues, Unicef.
HIV/AIDS Webinar Statistics and Monitoring Tessa Wardlaw Statistics & Monitoring Section/Policy & Practice 20 October 2010.
MICS4 Survey Design Workshop Multiple Indicator Cluster Surveys Survey Design Workshop Data Analysis and Reporting.
Global Action Plan and its implementation in other regions Meeting for Discussion of the draft Plan for the Implementation of the Global Strategy to Improve.
Evaluation in the GEF and Training Module on Terminal Evaluations
Michalis Adamantiadis Transport Policy Adviser, SSATP SSATP Capacity Development Strategy Annual Meeting, December 2012.
MICS Data Processing Workshop Multiple Indicator Cluster Surveys Data Processing Workshop Overview of MICS Tools, Templates, Resources, Technical Assistance.
Tracking of GEF Portfolio: Monitoring and Evaluation of Results Sub-regional Workshop for GEF Focal Points Aaron Zazueta March 2010 Hanoi, Vietnam.
Report on the Evaluation Function Evaluation Office.
INITIATING THE PLANNING PROCESS. CONTENT Outputs from this stage Stage general description Obtaining government commitment Raising awareness Establishing.
Sub-Regional Workshop for GEF Focal Points in West and Central Africa Accra, Ghana, 9-11 July 2009 Tracking National Portfolios and Assessing Results.
Tracking national portfolios and assessing results Sub-regional Workshop for GEF Focal Points Western and Central Africa Dakar, May 2007.
Interstate Statistical Committee of the Commonwealth of Independent States (CIS-Stat) Implementing the Global Strategy to Improve Agricultural and Rural.
UNICEF and Statistical Capacity Building UN Statistical Commission 1 March 2007 Tessa Wardlaw.
Aaron Zazueta Chief Evaluation Officer 2013 EVALUATION IN THE GEF.
Session 8: Statistical Infrastructure Joseph Ilboudo UNECA/ACS Workshop Review of RRSF Implementation.
Training Resource Manual on Integrated Assessment Session UNEP-UNCTAD CBTF Process of an Integrated Assessment Session 2.
Objectives and Strategies of RRSF The RRSF has been prepared with an overall objective and four specific objectives to overcome the identified problems.
MICS Survey Design Workshop Multiple Indicator Cluster Surveys Survey Design Workshop Organized by UNICEF ___RO and HQ Day, Month, Year.
The partnership principle and the European Code of Conduct on Partnership.
WHO EURO In Country Coordination and Strengthening National Interagency Coordinating Committees.
Setting the context: Full costing and the financial sustainability of universities Country Workshop: POLAND EUIMA – Full Costing Project University of.
Revisions Proposed to the CIS Plan by the Global Office Misha V. Belkindas Budapest, July 3-4, 2013.
Consultant Advance Research Team. Outline UNDERSTANDING M&E DATA NEEDS PEOPLE, PARTNERSHIP AND PLANNING 1.Organizational structures with HIV M&E functions.
Evaluation Seminar Czech Republic CSF and OP Managing Authorities Session 3: Mid-Term Evaluation.
MICS Data Processing Workshop Multiple Indicator Cluster Surveys Data Processing Workshop Overview of the MICS Process.
1 Devinfo in Syria. 2 Background on DevInfo The Syrian MDG Monitoring Database will be shared between Government Institutions, UN agencies as well as.
27/04/2017 Strengthening of the Monitoring and Evaluation system for FTPP/FTTP in FAO /SEC December 2015 FTPP/FTFP Workshop, Bishkek, Kyrgyzstan.
Managing the National Communications Process UNFCCC Workshop on Exchange of Experiences and Good Practices among NAI Countries in Preparing NCs September.
10 August Inter-Regional Workshop on the Production of Gender Statistics New Delhi, India, 6-10 August 2007 Strengthening National Gender Statistics.
IW:LEARN TDA/SAP Training Course Module 3: Developing the SAP.
United Nations Statistics Division Developing a short-term statistics implementation programme Expert Group Meeting on Short-Term Economic Statistics in.
GEF Familiarization Seminar
Multiple Indicator Cluster Surveys Survey Design Workshop
Bhutan, India, Maldives and Sri Lanka
WORKING PRINCIPLES ECONOMIC COOPERATION ORGANIZATION REGIONAL COORDINATION CENTRE FOR IMPLEMENTATION OF THE ECO/FAO REGIONAL PROGRAMME FOR FOOD SECURITY.
Use of National Strategies for the Development of Statistics
Evaluation in the GEF and Training Module on Terminal Evaluations
UNFPA’s support to data collection in Kazakhstan
Presentation transcript:

MICS4 Survey Design Workshop Multiple Indicator Cluster Surveys Survey Design Workshop The MICS4 Process

MICS4 Survey Design Workshop Decision to conduct MICS First step: Why is a survey needed? –In principle, a survey is conducted to satisfy data needs There should be a clearly defined objective of the survey - how data will be used

MICS4 Survey Design Workshop Data needs assessment To decide, a thorough data needs assessment needs to be carried out Assess whether MICS (or another survey) will be the answer to fill the data gap(s) in question

MICS4 Survey Design Workshop UNICEFs role On monitoring-related issues, UNICEF works closely with NSOs and other relevant national organizations UNICEF will be/is working closely with governments to assess data needs, on the basis of the MICS indicator list

MICS4 Survey Design Workshop Once a decision has been made… ….the process will start

MICS4 Survey Design Workshop Always to remember Survey planning, design, implementation and dissemination is a continuous process Decisions made in one area influence others Some may be irreversible

MICS4 Survey Design Workshop Getting started Establish steering committee –…and technical committee Define roles and responsibilities, accountabilities: the MoU (Memorandum of Understanding) Identify survey coordinator and key personnel Decide on basic features, such as content, reporting domains, sample size, fieldwork personnel needed Produce survey plan, including timetable and budget

MICS4 Survey Design Workshop Steering Committee Instrumental in full national ownership Senior staff from implementing agency, UNICEF, other partners in development, relevant line ministries and stakeholders Meet at critical points during implementation – funding and advocacy, review and approve MoU and survey plan, review survey progress…

MICS4 Survey Design Workshop Steering Committee Objectives/Tasks –To ensure transparent decision-making –To identify a collaborative approach to fund- raising –To promote understanding for and utilisation of survey and results –To oversee smooth implementation

MICS4 Survey Design Workshop Steering Committee Appoint technical experts to a Technical Committee which works under the Steering Committee Composed of technical staff from some of the organizations represented Advise Steering Committee on technical decisions and processes

MICS4 Survey Design Workshop Memorandum of Understanding Between government and UNICEF (and other partners) –Defines roles and responsibilities, accountabilities, –Access and use of data, –Modes and areas of collaboration

MICS4 Survey Design Workshop Survey Coordinator Technical person to coordinate and contribute to technical processes Typically from the implementing agency Make sure that entire process runs smoothly, basic protocols are followed, survey results are understood and used by stakeholders Coordinate work of other technical staff

MICS4 Survey Design Workshop Other technical persons Senior technical persons and institution(s) Sampling expert Fieldwork coordinator Data processing expert

MICS4 Survey Design Workshop UNICEF Support Full commitment is necessary to work with government counterparts, support implementation, ensure compliance to protocols Work closely with the survey coordinator M&E Officers, or UNICEF MICS Consultant UNICEF RO also to provide the services of regional experts – in household survey methodology, data processing and sampling

MICS4 Survey Design Workshop The UNICEF/MICS Support and Coordination System UNICEF MICS Consultant / UNICEF Focal Point Regional Experts: In household surveys, sampling, data processing Regional Office: MICS Coordinator/Specialist, M&E Sections UNICEF New York: MICS Team, Statistics and Monitoring Section

MICS4 Survey Design Workshop Reporting Domains Typically, national, urban/rural and regional Other domains may be defined or desired – special population groups, subnational estimation Careful assessment of pros and cons needed

MICS4 Survey Design Workshop Timetable and budget To be covered later Golden rules: –Basic measures can be taken to avoid delays (e.g. Simultaneous data entry) –Good planning is key to timeliness of production of results –Ensure that all activities are fully funded –A good survey plan, with national ownership and international support is always funded

MICS4 Survey Design Workshop Main Activities Adaptation of survey instruments Pre-test the survey instruments Sampling (presentation) Main training (presentation) Fieldwork (presentation) Data processing (presentation) Data analysis and report preparation (presentation) Dissemination of results (presentation) Archiving and further analysis

MICS4 Survey Design Workshop Review Process A continuous review process should be in place, with communication lines open In-country assistance by UNICEF Review of and feedback to all survey documents

MICS4 Survey Design Workshop Review Process To ensure quality Timeliness Acceptance Effective dissemination