The Need for Electric Transmission Improvements in Dane County.

Slides:



Advertisements
Similar presentations
Central Vermont Public Service SOUTHERN LOOP COOLIDGE CONNECTOR Coolidge Connector Community Working Group April 30, 2007.
Advertisements

Lets Get Ready, South Florida Power Center for Utility Exploration (PCUE)
Houston Region Import Capacity Project Planning for Reliable Power.
Demand Response: The Challenges of Integration in a Total Resource Plan Demand Response: The Challenges of Integration in a Total Resource Plan Howard.
TransWest Express and Gateway South WECC Planning Coordination Committee David Smith, National Grid October 25-26, 2007 Vancouver, B.C.
March 26, 2014 Transmission Coordination and Planning Committee 2014 Q1 Stakeholder Meeting.
Rate Plan. Value Story When asked, our customers identify the following topics as ways MidAmerican Energy provides value – Emergency Response.
OHIO ENERGY POLICY PROGRESS & REVIEW UCEAO 6 th Annual Conference Securing Ohio’s Energy and Economic Future THE BEST OF TIMES, THE WORST OF TIMES: ADVANCED.
The Power Grid ELEC 403 The Citadel Mark McKinney.
May 2013 Tehachapi Renewable Transmission Project (TRTP)
Reporting the Economics of Reliable Energy Ralph Fehr, P.E. Engineering Consultant Reliability of the U.S. Power Grid.
Arrowhead  Weston Transmission Line Project Dave Van House Minnesota Power.
Electric Transmission and Economic Opportunities Richard W. Caperton Senior Energy Policy Analyst.
The Need for an Energy Grid in the Maldives
KURTEN SWITCH PROJECT (BRYAN/ COLLEGE STATION AREA UPGRADES) Technical Advisory Committee December 1, 2005 Transmission Services.
Houston Region Import Capacity Project August 27, 2013 Regional Planning Group Meeting.
January 5, 2012 TAC Cross Valley 345 kV Project Jeff Billo Manager, Mid-Term Planning.
Alaska Power Association Annual Meeting August 2009 Visions for a Sustainable Energy Future: Impacts and Choices.
The Status Of The Electric Grid In ERCOT The Electric Reliability Council Of Texas Sam R. Jones, P.E. ERCOT – Retired As a retiree of ERCOT this presentation.
Economic Impact of Poor Power Quality on Industry Nepal Adopted from The Internet for Educational Purpose Sudaryatno Sudirham October 2003.
ENERGY INDUSTRY FUNDAMENTALS: MODULE 4, UNIT B— Transmission, Governance, Stability & Emerging Technologies.
IMPERIAL VALLEY CONFERENCE July 21, SOLICITATION RENEWABLES PORTFOLIO STANDARD.
Transmission planning in Vermont Past, present and future Docket 7081 workshop By Dean LaForest 9/19/05.
George Bartlett Director, Transmission Operations Economic Transmission Projects Entergy Transmission Planning Summit New Orleans, LA July 8, 2004.
Help Wanted: The Power Engineering Pipeline and its Role in the American Nuclear Industry Presented by Brooke Buikema.
1 Transmission Development at Ameren and in the Midwest ISO Mid-America Regulatory Conference Maureen A. Borkowski June 8, 2010.
INITIATIVES IMPLEMENTED ON NATIONAL AND INTERNATIONAL LEVELS FOR ENERGY EFFICIENCY AND ENERGY- SAVING IMPROVEMENT VI Eurasian Energy Forum 4-6 October.
Charles Hosken, General Manager Imperial Irrigation District
JACKSBORO TO WEST DENTON 345-kV PROJECT Presentation to Technical Advisory Committee April 8, 2004 Transmission Services Operations.
Wyoming Infrastructure Authority Developing Electric Infrastructure for the Future of the West Energy Gateway Update Presented by Darrell T. Gerrard Vice.
2006 Reliability Study Scope Name Date. DRAFT 2 Purpose of Study Assess the PEC and Duke transmission systems’ reliability Develop a single reliability.
ATC Major Projects Update Flora Flygt, Director of System Planning Franc Fennessy, Manager of Local Relations Wisconsin Industrial Energy Group August.
Why Make NJ Energy Strong? Sandy, Hurricane Irene and the October 2011 snow storm represent extreme weather patterns that may become commonplace. For.
NASHVILLE ELECTRIC SERVICE | Association for Financial Professionals March 2012.
National Inter-Ministerial Dialogue on Climate Change Bay Gardens Hotel Castries, saint Lucia Date, 2009 Energy Sector By Bishnu Tulsie and Judith Ephraim.
0 CapX /1/2015 CapX 2020 Transmission Plan: Ensuring Reliable Electricity.
Kilowatt Hour Usage MGE serves approximately 113,000 residential customers in the Dane County area …and approximately 17,500 business customers.
Reliable Power Reliable Markets Reliable People Performance Targets for the Customer Interconnection Process January, 2008.
Network Customer Meeting Access Metric Update November 16, 2006.
Why is WPL filing a rate case?  Last Base Case Rates were set January, 2007  Cost of our utility investments must be reflected in prices our customers.
WIEG Board Meeting Alliant Energy New Generation Plan Kim Zuhlke February 8, 2007.
1 Dane County Workforce Housing Discussion An Affordable Housing Report originally prepared for the Housing – Land Use Partnership January 2004.
NARUC Energy Regulatory Partnership Program The Georgian National Energy Regulatory Commission and The Vermont Public Service Board by John D. Burke, Board.
CWAG ENERGY CONFERENCE BIG SKY, MT Collaborative Efforts to Find Solutions: A Case Study – The Mountain States Transmission Intertie (MSTI) Presented by.
Page 1© 2009 Quanta Technology LLCPage 1 November 2007 BGE January 4, 2008 Strategic Midwest Area Renewable Transmission (SMART) Study October 06, 2009.
APS Overview Richard Nicosia. APS Snapshot Largest and longest serving electric utility Operations dating back to th largest employer headquartered.
Renewables Integration Development Project North West of the Island of Ireland Louis Fisher, EirGrid.
Slide 1 Fort Detrick Sustainability Planning Workshop #1 – Out Brief 1 Jul 08.
ATC Planning Zone Meeting Teresa Mogensen Director, Transmission Planning & Service Scott Barnhart Manager, Transmission Planning.
Updated 1/28/2011.
Investing In Our Future. Statement from Mayor Tom Murphy “The Gillette Regional Water Supply Project is essential for quality of life and economic development.
Transmission Issues & Renewables Perspectives of a Wind Developer.
Southwest Renewable Energy Transmission Conference May 21, 2010 This report contains transmission planning data that may be conceptual in nature and is.
1 Sunrise Powerlink Project Update Orange County Business Council March 10, 2009.
Designing Energy Solutions without Borders National Association of Regulatory Utility Commissioners National Association of Regulatory Utility Commissioners.
Yellowhead Area Transmission System Development
Bob Cupit Manager, Energy Facility Permitting Minnesota Public Utilities Commission.
© 2000 PACIFICORP kV LINE WALLA WALLA – WALLULA – Mc NARY 500 kV LINE HEMINGWAY – CAPTAIN JACK – REGIONAL PLANNING MEETING REGIONAL PLANNING PROJECT.
1.
The David W. York Award JEA South Grid Reuse System Tom Bartol, P.E.
TRANSMISSION INFRASTRUCTURE IMPROVEMENTS — Current Projects — The Center for the New West “ The Sun Valley Energy Roundtables 2006” November 30 – December.
California Energy Action Plan December 7, 2004 Energy Report: 2004 and 2005 Overview December 7, 2004.
Slide 1 Overview of Conservation in the Pacific Northwest Energy Efficiency Options in the Northwest Post-2011Meeting March 4, 2008.
Integrated Resource Planning with Market Engagement Symposium on Energy in the 21 st Century Dennis Elsenbeck April 8, 2016.
Commission Chairperson Phil Montgomery Presentation to Alaska Delegation September 5, 2014 Integrating Wisconsin’s Grid: an Energy Policy Perspective Public.
Resiliency and Reliability
The Transition to a High DER Future
Draft 2013 Energy-Efficiency Forecast
Acadiana Load Pocket Project
Presentation transcript:

The Need for Electric Transmission Improvements in Dane County

Background Dane County has experienced major economic growth in the last 25 years. Three of Wisconsin’s top five fastest growing communities are in Dane County. – Verona – Cottage Grove – Sun Prairie Electric usage in Dane County is expected to increase each year through 2020.

Background (continued) American Transmission Company (ATC) is a regulated public utility with a duty to provide an adequate and reliable transmission system. ATC’s planning analyses and system-reliability models indicate new transmission lines are needed in Dane County.

Growth In Dane County 1980 to 2007

Existing transmission system is aging Only three 345-kV transmission lines: – Columbia – No. Madison – Paddock to Rockdale to Columbia 1978 – Columbia – No. Madison 2 upgrade 2006 Only four 138-kV transmission lines: – Femrite – Sprecher 2007 – Rockdale to Fitchburg 1965/1967 – No. Madison to West Middleton 1972 – No. Madison to Sycamore 1983

Dane County projects: Recent and planned Project VoltageStatus/Inservice Femrite to Sprecher 138kVComplete 2007 North Madison to Waunakee 138kV Approved by PSC 07/07 Proposed In-service Date 2009 Fitchburg to Verona 138kVUnder regulatory review Proposed In-service Date 2009 Paddock to Rockdale 345kVUnder regulatory review Proposed In-service Date 2010 Rockdale to West Middleton 345kV Filed 10/15/07 In-service 2013

Rockdale – West Middleton Need The upgrade in 2006 of the 138-kilovolt line from the Columbia Plant to the North Madison substation is the only new 345-kilovolt line to be built in the County since the 1970s. A new 345-kV transmission line is needed to: reinforce the entire transmission network in Dane County solve a critical electrical reliability problem; help to prevent the threat of system outages Increase efficiency of power lines, reducing energy lost in transit Eliminate the need for multiple new, less-efficient, lower voltage lines in the future provide the necessary power for continued business growth and to support a growing population

Rockdale – West Middleton Project: At a glance Length of line: miles End points: Rockdale Substation near Christiana, and West Middleton Substation. Voltage: 345 kilovolts Type of pole: Steel single pole, single circuit Cost: $213 million to $250 million In-Service: 2013

Rockdale – West Middleton Proposed route options

Issues and challenges ATC’s forecasts and studies…are they accurate? Is underground construction an option? Are there alternatives? Conservation? Upgrades to existing lines? Is the Beltline Highway a viable route? Should additional generation in Dane County be considered? All of these issues are addressed in ATC’s regulatory application and will be subjected to the PSC’s rigorous review.

Reliability is critical – The capacity of the transmission system must meet the needs of a growing population and increased electrical usage. – Blackouts, brownouts, and even momentary interruptions can cause substantial financial impacts to businesses. – Reliable power is essential for Dane County’s energy consumers/employers and for attracting new businesses.

Improved Access leads to cost savings Access to lower cost energy sources: – The existing transmission system limits access to and transmission of cost-effective regional sources of energy, including renewable energy. – Planned transmission improvements will increase access to lower-cost sources of power outside of Dane County and reduce the need for new generation sources in the county.

A strong transmission system benefits the economy Transmission is basic infrastructure investment. – As necessary to a growing economy as transportation, water and sewer, and telecommunications infrastructure. A reliable and robust transmission system is fundamental to a growing economy. – Allows businesses to plan expansions with confidence. – Encourages new business development.

Next steps for Rockdale-West Middleton Project Regulatory application: filed 10/15/07 Regulatory review: Throughout 2008/09 Technical and public hearings: February 2009 PSC decision expected: Summer 2009 Proposed Start of construction: 2010 Proposed In-service Date: 2013