Slides:



Advertisements
Similar presentations
Planning Tools and Techniques
Advertisements

Halaman 1 Matakuliah: J0084 / Introduction to Management and Business Tahun: 2007 Versi: 1 / 3 Pertemuan 06 (Sixth Meting) Planning Tools and Techniques.
Entrepreneurial Finance, 4th Edition By Adelman and Marks PRENTICE HALL ©2007 by Pearson Education, Inc. Upper Saddle River, NJ Chapter 5 Profit,
Copyright © 2011 Pearson Prentice Hall. All rights reserved. Financial Forecasting and Planning Chapter 17.
PowerPoint Presentation by Charlie Cook
Last Week 1. Looked at concepts of planning and goals 2. Reviewed types of plans according to dimensions of breadth, time, specificity and frequency of.
Planning Foundation What Is Planning?
Roberta Russell & Bernard W. Taylor, III
Chapter 9 PLANNING TOOLS AND TECHNIQUES © Prentice Hall,
Chapter 9 PLANNING TOOLS AND TECHNIQUES © Prentice Hall,
Operations Management 14 Chapter Copyright ©2011 Pearson Education.
PLANNING TOOLS AND TECHNIQUES
Lean Six Sigma: Process Improvement Tools and Techniques Donna C. Summers © 2011 Pearson Higher Education, Upper Saddle River, NJ All Rights Reserved.
Planning Tools and Techniques with Duane Weaver
Operations Management 14 Chapter Copyright ©2011 Pearson Education, Inc. Publishing as Prentice Hall.
The Master Budget and Flexible Budgeting
Chapter 13, Stephen P. Robbins, Mary Coulter, and Nancy Langton, Management, Ninth Canadian Edition Copyright © 2009 Pearson Education Canada 13-1 Chapter.
Planning Tools and Techniques BUS 206 Erlan Bakiev, Ph. D. Zirve University Spring 2012.
Planning Tools and Techniques
© Farhan Mir 2007 IMS Principles of Management BBA (Hons) 4 th Semester (Lectures 25,26,27) Planning Tools & techniques By: Farhan Mir.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
PowerPoint Presentation by Charlie Cook The University of West Alabama Copyright © 2005 Prentice Hall, Inc. All rights reserved. Operations Management.
Planning and Scheduling
Copyright © 2015 Pearson Education, Inc. publishing as Prentice Hall 14-1.
Chapter 8, Stephen P. Robbins, Mary Coulter, and Nancy Langton, Management, Eighth Canadian Edition. Copyright © 2005 Pearson Education Canada Inc. 1 Chapter.
Planning Tools and Techniques Module
IT Project Management, Third Edition Chapter 6 1 Chapter 3: Project Time Management.
8 th edition Steven P. Robbins Mary Coulter PowerPoint Presentation by Charlie Cook Copyright © 2005 Prentice Hall, Inc. All rights reserved.
$$ Entrepreneurial Finance, 5th Edition Adelman and Marks 5-1 Pearson Higher Education ©2010 by Pearson Education, Inc. Upper Saddle River, NJ Chapter.
Ninth edition STEPHEN P. ROBBINS PowerPoint Presentation by Charlie Cook The University of West Alabama MARY COULTER © 2007 Prentice Hall, Inc. All rights.
Entrepreneurial Finance, 4th Edition By Adelman and Marks PRENTICE HALL ©2007 by Pearson Education, Inc. Upper Saddle River, NJ Profit, Profitability,
$$ Entrepreneurial Finance, 4th Edition By Adelman and Marks PRENTICE HALL ©2007 by Pearson Education, Inc. Upper Saddle River, NJ Chapter 5.
Chapter 7, Stephen P. Robbins, Mary Coulter, and Nancy Langton, Management, Ninth Canadian Edition Copyright © 2009 Pearson Education Canada 7-6 Strategic.
CPS ® and CAP ® Examination Review MANAGEMENT, Fifth Edition By Haney and Mazzola ©2005 Pearson Education, Inc. Pearson Prentice Hall Upper Saddle River,
Chapter9Chapter9 GLOSSARYGLOSSARY EXIT Glossary Modern Management, 9 th edition Click on terms for definitions Activities Budget Critical path Events Forecasting.
Copyright 2002 Prentice-Hall, Inc. Chapter 3 Managing the Information Systems Project 3.1 Modern Systems Analysis and Design.
Chapter 15, Stephen P. Robbins, Mary Coulter, and Nancy Langton, Management, Ninth Canadian Edition Copyright © 2009 Pearson Education Canada Controlling.
Chapter 15, Stephen P. Robbins, Mary Coulter, and Nancy Langton, Management, Ninth Canadian Edition Copyright © 2009 Pearson Education Canada 15-6 The.
Management, Eleventh Edition by Stephen P. Robbins & Mary Coulter ©2012 Pearson Education, Inc. publishing as Prentice Hall 9A-1.
CE 366 PROJECT MANAGEMENT AND ECONOMICS Robert G. Batson, Ph.D., P.E. Professor of Construction Engineering The University of Alabama
Planning Tools and Techniques Appendix B B–1. Assessing the Environment  Environmental Scanning  The screening of large amounts of information to anticipate.
Part III – Developing the Entrepreneurial Plan Chapter 7 – Environmental Assessment: Preparation for a New Venture Chapter 8 – Marketing Research for New.
Ninth edition STEPHEN P. ROBBINS PowerPoint Presentation by Charlie Cook The University of West Alabama MARY COULTER © 2007 Prentice Hall, Inc. All rights.
Planning Tools and Techniques
PLANNING TOOLS AND TECHNIQUES
Managing Human Resources
Chapter 7 Strategic Management
Tools for Controlling Organizational Performance: Financial Controls
Introduction to Management and Organizations
Contemporary Planning Techniques
Managing and Rewarding Performance
Chapter 8 Operations and Value Chain Management
The HRM Process Functions of the HRM Process
Turning Individuals into Team Players
Management Chapter 18A Planning and Control Techniques Module
Chapter 12 Leadership Chapter 12, Stephen P. Robbins, Mary Coulter, and Nancy Langton, Management, Ninth Canadian Edition Copyright © 2009 Pearson Education.
Foundations of Control
3 Planning and Goal Setting Supervision Today! 7th Edition
Managing Change and Innovation
2. 2 Assessing the Environment Environmental scanning - the screening of large amounts of information to anticipate and interpret changes in the environment.
Planning and Control Techniques Module
Copyright ©2011 Pearson Education, Inc. Publishing as Prentice Hall.
Planning Tools and Techniques
Planning Tools and Techniques
The Master Budget and Flexible Budgeting
Why Study Management? The Value of Studying Management
Constraints on Managers: Organizational Culture and the Environment
Planning Tools and Techniques
Principles of Management Learning Session # 21 Dr. A. Rashid Kausar.
Foundations of Planning
Presentation transcript:

Allocating Resources Types of Resources The assets of the organization Financial: debt, equity, retained earnings, and other financial holdings Physical: buildings, equipment, raw materials, and other tangible assets Human: experiences, skills, knowledge, and competencies Intangible: brand names, patents, reputation, trademarks, copyrights, and databases Structural/cultural: history, culture, work systems, working relationships, trust, and policies Learning Objective #2 Chapter 8, Stephen P. Robbins, Mary Coulter, and Nancy Langton, Management, Ninth Canadian Edition Copyright © 2009 Pearson Education Canada

Exhibit 8.3 Techniques for Allocating Resources Scheduling Detailing what's to be done, in what order, by whom, and when Breakeven Analysis Determining the point where revenue and costs of a project will match Linear Programming Using a mathematical technique to solve resource allocation Budgeting Creating a numerical plan for allocating resources to specific activities Revenue Expense Profit Cash Gantt Load PERT Chapter 8, Stephen P. Robbins, Mary Coulter, and Nancy Langton, Management, Ninth Canadian Edition Copyright © 2009 Pearson Education Canada

Allocating Resources: Budgeting Budgets Numerical plans for allocating resources (e.g., revenues, expenses, and capital expenditures) Used to improve time, space, and use of material resources Are the most commonly used and most widely applicable planning technique for organizations Chapter 8, Stephen P. Robbins, Mary Coulter, and Nancy Langton, Management, Ninth Canadian Edition Copyright © 2009 Pearson Education Canada

Exhibit 8.4 Types of Budgets Variable Budget Takes into account the costs that vary with volume Fixed Budget Assumes fixed level of sales or production Cash Budget Forecasts cash on hand and how much will be needed Revenue Budget Projects future sales Profit Budget Combines revenue and expense budgets of various units to determine each unit ’ ’s profit contribution Expense Budget Lists primary activities and allocates dollar amount to each OR Source: Based on R.S. Russell and B.W. Taylor III. Production and Operations Management (Upper Saddle River, NJ: Prentice Hall, 1995), p. 287. Chapter 8, Stephen P. Robbins, Mary Coulter, and Nancy Langton, Management, Ninth Canadian Edition Copyright © 2009 Pearson Education Canada

Tips for Managers: Improving Budgeting Be flexible. Understand that goals should drive budgets—budgets should not determine goals. Coordinate budgeting throughout the organization. Use budgeting/planning software when appropriate. Remember that budgets are tools. Remember that profits result from smart management, not because you budgeted for them. Chapter 8, Stephen P. Robbins, Mary Coulter, and Nancy Langton, Management, Ninth Canadian Edition Copyright © 2009 Pearson Education Canada

Allocating Resources: Scheduling Schedules Plans that allocate resources by detailing what activities have to be done, the order in which they are to be completed, who is to do each, and when they are to be completed Represent the coordination of various activities Chapter 8, Stephen P. Robbins, Mary Coulter, and Nancy Langton, Management, Ninth Canadian Edition Copyright © 2009 Pearson Education Canada

Allocating Resources: Charting Gantt Chart A bar graph with time on the horizontal axis and activities to be accomplished on the vertical axis Shows the expected and actual progress of various tasks Load Chart A modified Gantt chart that lists entire departments or specific resources on the vertical axis Allows managers to plan and control capacity utilization Chapter 8, Stephen P. Robbins, Mary Coulter, and Nancy Langton, Management, Ninth Canadian Edition Copyright © 2009 Pearson Education Canada

Exhibit 8.5 A Gantt Chart Copy-edit manuscript Design sample pages Draw artwork Print first pages Print final pages Design cover 1 2 Month Reporting Date Activity 3 4 Actual progress Goals Chapter 8, Stephen P. Robbins, Mary Coulter, and Nancy Langton, Management, Ninth Canadian Edition Copyright © 2009 Pearson Education Canada

Exhibit 8.6 A Load Chart Ling Antonio Kim Maurice Dave Rashid 1 2 Month Editors 3 4 5 6 Work scheduled Chapter 8, Stephen P. Robbins, Mary Coulter, and Nancy Langton, Management, Ninth Canadian Edition Copyright © 2009 Pearson Education Canada

Allocating Resources: Analysis Program Evaluation and Review Technique (PERT) A flow chart diagram that depicts the sequence of activities needed to complete a project and the time or costs associated with each activity Events: endpoints for completion Activities: time required for each activity Slack time: the time that a completed activity waits for another activity to finish so that the next activity, which depends on the completion of both activities, can start Critical path: the path (ordering) of activities that allows all tasks to be completed with the least slack time Chapter 8, Stephen P. Robbins, Mary Coulter, and Nancy Langton, Management, Ninth Canadian Edition Copyright © 2009 Pearson Education Canada

Exhibit 8.7 Steps in Developing a PERT Network Identify every significant activity that must be achieved for a project to be completed. Determine the order in which these events must be completed. Diagram the flow of activities from start to finish, identifying each activity and its relationship to all other activities. Compute a time estimate for completing each activity. Using the network diagram that contains time estimates for each activity, determine a schedule for the start and finish dates of each activity and for the entire project. Chapter 8, Stephen P. Robbins, Mary Coulter, and Nancy Langton, Management, Ninth Canadian Edition Copyright © 2009 Pearson Education Canada

Exhibit 8.8 Outline of Major Events for Constructing an Office Building Chapter 8, Stephen P. Robbins, Mary Coulter, and Nancy Langton, Management, Ninth Canadian Edition Copyright © 2009 Pearson Education Canada

Exhibit 8.9 A PERT Network for Constructing an Office Building Critical Path: A - B - C - D - G - H - J - K Chapter 8, Stephen P. Robbins, Mary Coulter, and Nancy Langton, Management, Ninth Canadian Edition Copyright © 2009 Pearson Education Canada

Allocating Resources: Analysis Breakeven Analysis Is used to determine the point at which all fixed costs have been recovered and profitability begins Fixed costs (FC) Variable costs (VC) Total Fixed Costs (TFC) Price (P) The Breakeven Formula: Costs Variable Unit - Price Fixed Total Breakeven : Chapter 8, Stephen P. Robbins, Mary Coulter, and Nancy Langton, Management, Ninth Canadian Edition Copyright © 2009 Pearson Education Canada

Exhibit 8.10 Breakeven Analysis 70 000 60 000 50 000 40 000 30 000 20 000 10 000 100 200 300 Output (in thousands) 400 500 600 Breakeven Point Variable Costs Fixed Costs Profit Area Total Revenue Loss Costs Revenue/Cost ($) Chapter 8, Stephen P. Robbins, Mary Coulter, and Nancy Langton, Management, Ninth Canadian Edition Copyright © 2009 Pearson Education Canada

Allocating Resources: Analysis Linear Programming A technique that seeks to solve resource allocation problems using the proportional relationships between two variables Chapter 8, Stephen P. Robbins, Mary Coulter, and Nancy Langton, Management, Ninth Canadian Edition Copyright © 2009 Pearson Education Canada

Exhibit 8.11 Production Data for Cinnamon-Scented Products Chapter 8, Stephen P. Robbins, Mary Coulter, and Nancy Langton, Management, Ninth Canadian Edition Copyright © 2009 Pearson Education Canada

Exhibit 8.12 Graphical Solution to Linear Programming Problem 700 600 500 F 400 Quantity of Scented Candles 300 B 200 C Feasibility 100 Region A D E 100 200 300 400 500 600 Quantity of Potpourri Bags Chapter 8, Stephen P. Robbins, Mary Coulter, and Nancy Langton, Management, Ninth Canadian Edition Copyright © 2009 Pearson Education Canada