E-MAS Cooled Optical Bench (COB) System Overview Nov. 15, 2010 Roy W. Esplin Mike Watson Dave McLain Monte Frandsen.

Slides:



Advertisements
Similar presentations
Engineer Training XL1200 Electronics. Engineer Training XL1200 Electronics Confidential 2 XL1200 Electronics The XL Jet Electronic System consists of.
Advertisements

MICE RF and Coupling Coil Module Outstanding Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 26, 2004.
LWIR FPA Mirror Image Problem & Recovery April 11, 2011 Roy W. Esplin Dave McLain.
ModICE Modular Integrated Connector Enclosure
How to Perform Preventive Maintenance of the Personal Computer Properly Shut Down of the Computer Properly Shut Down of the Computer Unplug all Connection.
Integration of Cavities and Coupling Coil Modules Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting March 28 – April 1, 2004.
128 April 2008 Spectrometer Solenoid Fabrication Update MICO Meeting 19 May 2008 S. Virostek, M. Zisman LBNL.
Spectrometer Solenoid Fabrication Update Steve Virostek Lawrence Berkeley National Lab MICE CM23 at ICST, Harbin January 14, 2009.
CHE/ME 109 Heat Transfer in Electronics
Electrical System Nov. 15, 2010 Monte Frandsen. Key Electronics Design Goals and Constraints Minimal change between ground and airborne observations Signals.
Integration and Alignment of Optical Subsystem Roy W. Esplin Dave McLain.
O Ring Groove (1) Bolt holes for fastening strongback to TPC wheel (26) SHV feedthroughs to feed HV wires to ABDB on side ports, all connectors are vacuum.
1 Airborne Science Program EMASHSI Kick Off Meeting Interfaces NASA Ames Research Center University of California Santa Cruz Airborne Science & Technology.
ISHELL Design Review Cryostat & Optics Bench Dan Kokubun 9/11/2013.
ZTF Interconnecting Scheme Stephen Kaye
I T Essentials I Chapter 3 JEOPARDY.
Eddington Kick-Off. Vienna, September 17th, 2001 T.Muñoz/C.Laviada (INTA) 1 EddiCam: The Eddington Photometric Camera Preliminary Design Layout.
Mike Watson Dave McLain
Status and Integration of the Spectrometer Solenoid Magnets Steve Virostek Lawrence Berkeley National Lab MICE RAL June 15, 2007.
Building a PC. Motherboard Selection Ensure the selected motherboard is appropriate for the processor model and frequency you are planning to use AMD.
Overview of AMS-02 Changes due the addition of the Permanent Magnet
Optical Subsystem Roy Esplin Dave McLain. Internal Optics Bench Subassembly 2 Gut Ray Dichroic Beamsplitter (MWIR reflected, LWIR transmitted) LWIR Lens.
January 30, 2007 Exterior Magnets Concept Blanket and Vacuum Vessel Chamber Integration and Maintenance G. Sviatoslavsky, M. Sawan (UW), A.R. Raffray (UCSD),
LRR – Mechanical Alphonso Stewart Judy Brannen David Steinfeld Ilene Sokolsky Eric Jenkins.
INTEGRATION OF THE CBM SILICON TRACKING SYSTEM U. Frankenfeld for the CBM collaboration supported by BMBF, EU-FP7 HadronPhysics3 and CRISP.
EMAS Stirling Cooler Operations June 29, 2011 Mike Watson.
Optical & Radiometric Conceptual Design of EMAS Thermal Port Upgrade Kickoff Meeting June 29, 2010 Roy W. Esplin.
Spectrometer Solenoid Fabrication & Testing Update Steve Virostek Lawrence Berkeley National Lab MICE CM25 at RAL November 6, 2009.
Neil JacksonUK-V RAL 8th September Module to Disc Assembly Infrastructure –Services and test box –Evaporative cooling system –Disc Handling Tests.
© 2008 Cisco Systems, Inc. All rights reserved.Cisco ConfidentialPresentation_ID 1 Chapter 3: Computer Assembly IT Essentials 5.0.
EMAS Vacuum Testing June 2, 2011 Last 2 slides added after Feb 28, 2012 getter initiation Mike Watson.
Smart Agent Installation Required Customer Connections 5 Core Power Cable To Laser Head 1.Power To Laser Head 2.Ethernet 10/100 Connector 3.Mains Input.
E.Guschin (INR) 21 November 2003Integration EDR PRS/SPD static envelop, assembly and installation Detector layout Static envelop along the beam Detector.
EUDET Pixel-related DESY Tobias Haas 29 June 2006.
EMAS Stirling Cooler Operations Feb 24, 2011 Mike Watson.
8/31/05DR Lynch1 HBD Preparations in the IR Don Lynch.
Restoring Komag Yasuhiro Makida Consideration of restoring and modifying Komag for a stand alone operation without the refrigerator. Contents 1.Magnet.
V. Bobillier1 Cable installation status.
Roy Hannaford October 23-24, 2002 RFP Review DFBX Feedbox LEAD SPLICE SPECIFICATION  BY: ROY HANNAFORD.
H. Katajisto RE EDR 10/10/02 Enclosures for the RPC Link Boards Outline Introduction Periphery General Services Components, materials Manufacture, Assembly.
STEREO IMPACT SEP Critical Design Review 2002-Nov-21/22 TvR1 SEP Mechanical Design Sandy Shuman, GSFC ) Tycho.
COB Integration and Test Nov. 15, 2010 Roy Esplin Mike Watson Monte Frandsen.
HL-LHC 11 T Dipole for DS Collimation 8 th to10 th December, 2014 D. Duarte Ramos, C. Mucher, L. Gentini, T. Sahner, H. Prin, R. Wawrowski, F. Savary,
EMAS MWIR Transmittance From COB Component Measurements April 18, 2011 Roy W. Esplin.
MICE Spectrometer Solenoid Recovery Review - December 3-4, Steve Virostek MICE Spectrometer Solenoid Design and Assembly.
CW Cryomodules for Project X Yuriy Orlov, Tom Nicol, and Tom Peterson Cryomodules for Project X, 14 June 2013Page 1.
Cooling Circuit Design Steve Virostek Lawrence Berkeley National Lab February 29, 2012 MICE Coupling Coil Cryostat Design Review Lawrence Berkeley National.
FP420 Hybrid Mechanical Design Ray Thompson / Manchester Manchester Xmas O7 Ray Thompson Julian Freestone, Andy Elvin.
MICE Coupling Coil Fabrication Steps to Complete Allan DeMello Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
New Support Structure 4x4 Beams Existing Stairs per Mr Walter Kellner Cherenkov 32 deg shifted back 4.0 inches to clear existing structure Cherenkov 40.
Prototype Cryomodule FDR Ken Premo 21 – 22 January 2015 High Power Coupler Design.
Radiation Shutter Re-Purposing Roy Preece STFC RAL 18 th December 2014.
PSB and PS test systems status. M. Haase September 14 th Finemet Review.
Teleconf ACS – FREIA 28th March 2017
Panda Solenoid Content Interface Box Cold Mass Layout Cooling Lines
ModICE Modular Integrated Connector Enclosure
VELO Thermal Control System
cooling and supports of the forward endcap EMC
LARP Vertical Test Facility
TEMPERATURE SENSOR LOCATIONS
VELO Thermal Control System
The 11T cryo-assembly: summary of design and integration aspects
iSHELL Design Review Cryostat & Optics Bench
SCT/Pixel Draft Rack Layout rcj
Tagger Microscope Mounting, Shielding & Cooling
Thermal aspects Unité mixte de recherche CNRS-IN2P3
Experimental equipment Edgar L. Black February 17, 2019
SNS PPU Cryomodule Instrumentation
SNS PPU Cryomodule Instrumentation
CRYOMODULE FINAL ASSEMBLY
Presentation transcript:

E-MAS Cooled Optical Bench (COB) System Overview Nov. 15, 2010 Roy W. Esplin Mike Watson Dave McLain Monte Frandsen

COB Integrated in EMAS 2 COB (Electronics PreAmp Box and Cryocooler Controller Power Supply (CCPS) not shown)

COB System Layout 3 Cryocooler Vacuum Housing LN2 Feedthrus Preamp Electronics Box Vacuum Servicing Replacement Port 2 Splitter (Window with O-ring can be seen behind Splitter) 50pin Connector (x3) Cryocooler Controller Power Supply (CCPS) not shown

COB System Test Configuration 4 Vacuum Window (Replacement Port 2 Splitter will not be installed during COB testing. However, alignment of Current Port 2 Splitter will be transferred to Replacement Port 2 Splitter and the Replacement Port 2 Splitter will be pinned to MAS mounting plate) Cryocooler Controller Power Supply (CCPS) not shown

Subassemblies Within Vacuum Enclosure 5 LWIR Optics/FPA Subassembly on right side of Internal Bench MWIR Optics/FPA Subassembly on left side of Internal Bench Cabling Heat Sink Thermal Links Cold Shield (Cover removed) LN2 Heat Exchanger (Bolts to Internal Bench)