Improved beam line for Hall A layouts, present and proposed optics in altered region benefits of proposed layout costs of proposed layout conclusions.

Slides:



Advertisements
Similar presentations
PEPPo Weekly Status Meeting February 16, 2011 & 6MSD Planning Meeting February 23, 2011 Part 1 – Technical summary of layout Part 2 – Month-by-Month Installation.
Advertisements

Y. R. Roblin, G2P review, 1/17/ HALLA G2P readiness review Yves Roblin, CASA.
Jixie Zhang Javier Gomez Oleksandr Glamazdin Roman Pomatsalyuk Vadym Vereshchaka Hall A Collabortion Meeting, Dec 2012 Hall A Moller Polarimeter 12 GeV.
INJECTOR TEST FACILITY UPGRADE PHASE I: 5-10 MEV INJECTOR Feb. 7, 2014.
G2P Target installation and Beyond. Schedule Pivot before.
G2p/GEp Beamline Tim Michalski Project Lead. Overview Facilitate the design, procurement, and build of the beamline – up to the target chamber g2p/GEp.
The Detector and Interaction Region for a Photon Collider at TESLA
AESOP: Accurate Electron Spin Optical Polarimeter Marcy L. Stutzman, Matt Poelker; Jefferson Lab Timothy J. Gay; University of Nebraska.
November 07, 2006 Global Design Effort 1 Beam Delivery System updates BDS Area leaders Deepa Angal-Kalinin, Hitoshi Yamamoto, Andrei Seryi Valencia GDE.
Beamline update Ken Moffeit 5 June 2013 The Beginning Overview of the beamline Beam diagnostics Silicon Protection New options for location of HPS Beamline.
05/30/08J. Dunne -- SANE Collaboration Meeting 1 Beamline Status Upstream beamline –Chicane –SEM –Rasters –Girder Downstream beamline –Helium bag –Extension.
Hall A Parity Workshop (May 10, 2002), 1 Operated by the Southeastern Universities Research Association for the U.S. Depart. Of Energy Thomas Jefferson.
Thomas Jefferson National Accelerator Facility Page 1 IPR October 18-20, 2011 John J. LeRose Independent Project Review of 12 GeV Upgrade Jefferson Lab.
UVA Polarized Target In Hall A Pictures and Cost Paul Brindza Dec 17, 2009.
1) Source Issues 2) SLAC’s ITF Jym Clendenin SLAC.
E : Proton g 2 Structure Function Fundamental spin observable has never been measured at low or moderate Q 2 BC Sum Rule : violation suggested for.
October 31, BDS Group1 ILC Beam Delivery System “Hybrid” Layout 2006e Release Preliminary M. Woodley.
1 BROOKHAVEN SCIENCE ASSOCIATES Abstract Magnet and Girder Integration Lewis Doom, NSLS-II Project National Synchrotron Light Source II (NSLS-II) will.
SCU Segmented Cryostat Concept M. Leitner, S. Prestemon, D. Arbelaez, S. Myers September 2 nd, 2014.
F Antiproton Source Apertures Steve Werkema DOE Tevatron Operations Review March 22, 2006.
Nuruzzaman ( Hampton University Group Meeting 1 st November 2011 Beamline Optics Using Beam Modulation for the Q-weak Experiment.
G2p/GEp Beamline Tim Michalski Project Lead. Beamline Overview Slow Raster Tungsten Calorimeter Upside Down Girder (correctors, BCM, superharp) FZ1 Magnet.
G 0 Coordinator Update & “To-Do List” Joe Grames William & Mary, June 5-6, 2006  Hall C Beam Line Tasks  Accelerator Preparation Tasks  Beam Halo 
G2p/gep Beamline Project Overview Tim Michalski Project Lead.
1 Overview of Polarimetry Outline of Talk Polarized Physics Machine-Detector Interface Issues Upstream Polarimeter Downstream Polarimeter Ken Moffeit,
17 th November, 2008 LCWS08/ILC08 1 BDS optics and minimal machine study Deepa Angal-Kalinin ASTeC & The Cockcroft Institute Daresbury Laboratory.
Compton polarimetry for EIC. Outline Polarized electron beam Compton process Compton polarimeters at Jefferson Laboratory – Parity experiments at Jlab.
Y. R. Roblin Hall A beamline and accelerator status.
Primary beam production: progress - Extraction from LSS2 - Switching from TT20 at 100 GeV B.Goddard F.Velotti, A.Parfenova, R.Steerenberg, K.Cornelis,
Spreaders & Recombiners Beam Transport Michael Bevins May 30, GeV Upgrade - Beam Transport Spreader/Recombiner Dipoles and Layout, & Installation.
Bubble Chamber Planning Meeting 07 August
Septum Magnets in Hall A Hall A Collaboration Meeting 6/10-11/2010 John J. LeRose.
Run Coordnator Report 2012/04/ /04/10 Jixie Zhang
PSB H- injection concept J.Borburgh, C.Bracco, C.Carli, B.Goddard, M.Hourican, B.Mikulec, W.Weterings,
Operated by JSA for the U.S. Department of Energy Thomas Jefferson National Accelerator Facility 1 Alex Bogacz UITF Beam-line Modeling (2) UITF Mtg. JLAB,
Thomas Jefferson National Accelerator Facility Operated by the Southeastern Universities Research Association for the U.S. Depart. Of Energy The Department.
LAGUNA Primary Beam: Extraction and Transfer B.Goddard TE/ABT 23/01/2013 Reporting on behalf of many colleagues 400 GeV – Extraction from SPS – Upgrade.
Hall A Update Thia Keppel User Group Board of Directors January 2015.
Overview of Onsite Progress Jian-ping Chen g 2 p /G ep Collabroation Meeting.
MAIN DUMP LINE: BEAM LOSS SIMULATIONS WITH THE TDR PARAMETERS Y. Nosochkov E. Marin, G. White (SLAC) LCWS14 Workshop, Belgrade, October 7, 2014.
Status of Polarimeters and Polarized Targets: what are the plans for development of polarized targets to meet the needs of the Day 1 and future experimental.
Parity Quality Beam (PQB) B-Team Meeting September 10, 2008.
Extraction/Separator Setup Michael Spata Operations Stay Treat July 16, 2015.
G2p/GEp Beamline Status Tim Michalski Project Lead.
M. Sullivan Apr 27, 2017 MDI meeting
Hall C Readiness Review – Small Angle SHMS Operation
ELENA installation and commissioning status
Coupling Correction at the Australian Synchrotron
ILC BDS Emittance Diagnostics: Design and Requirements
The PEP-II Interaction e+e- Factories Workshop
Electron Beam Setup for Bubble Chamber
Hall A Infrastructure and the Moller Parity Experiment “AMPEX”
Accelerator Issues Raised in Hall A Parity Collaboration Meeting, April B-Team Meeting April 29, 2009.
QWeak Collaboration Meeting
Electron Source Configuration
Specifications for the JLEIC IR Magnets
Hall C – this week Time Period Plans 10/24-10/27 Target cool down
Feedback Systems Joe Grames Hall A Parity Meeting Jefferson Lab
A. Freyberg Aug 2016 ECT’16 =>
Hall C Beamline Upgrade
IR Magnet Layout/Design - JLEIC
High Level Physics Applications for LCLS Commissioning
Two-beam Test-stand Design and Construction Status
Electron Collider Ring Magnets Preliminary Summary
IR Beam Transport Status
Transfer Line for EIC.
IR Magnet Design and Engineering Considerations
Some of the Points Raised During my JLAB Visit
JLEIC Electron Ring Nonlinear Dynamics Work Plan
Isotope Readiness Review Run Plans
Presentation transcript:

Improved beam line for Hall A layouts, present and proposed optics in altered region benefits of proposed layout costs of proposed layout conclusions

layouts – present and proposed 4.5m available where ep is shown, not 5m ep not possible after Moller scattering (per Kees) 1m of 10cm tube with H/V corr, 3” BPM, switch to 2.5cm tube, quad, 2m fast raster, BPM, H/V correctors

Optics plots – altered region (combined optics)

Optics plots 2 (combined optics)  extent BPM PIVOT MOLLER Target TargetR aster PIVOT Moller raster

Smaller spot at target Betas (top) and beam envelopes (bottom) with minima 5m upstream of pivot. Is this better or worse for beam spot size stability give slow 0.05% changes in quads?

Benefits fast raster after all quads so it’s always what you set quads after Compton may be set for target beam size and BPM phase advance better control of beam size due to new quad locations more correctors and BPMs to eliminate scraping and improve orbit locks better control of orbit through raster and eP due to new BPMs and correctors fewer ion chamber trips double raster length eases engineering for 11 GeV 4.5m drift before diagnostic girder allows for either eP system or MOLLER target insertion high current Moller polarimetry feasible via combined optics

Costs Existing fast raster system mounted on leg of Compton before the electron detector as Moller raster microns at electron detector, $5K Single QR or QA-pair inserted between 1C18 A/B harps on “French bench”. $45K GEANT simulations to determine effects of elements on 1” beam pipe after Moller spectrometer dipole and the shielding changes needed as a result. We need to keep S/N up in Moller polarimeter detectors. ME design ~$100K Two girder extrusions and two stands, one extending inverted girder ~$20K Three additional BPMs and electronics ~$36K S/H cards for new BPMs $30K?? Three additional H/V corrector sets and power supplies ~$24K New fast raster system $100K?? If eP not retained, yet another BPM/corrector pair in that drift, $20K 1H00 harp omitted. May fit immediately after IBC/IUN/IBC as it’s mounted there now – I need more accurate dimensions. Can it be moved next to IPM1P03A? This allows better optics control at the Compton electron-laser interaction point. New vacuum vessel will be needed for this region as the middle Compton dipoles move up 8 cm. Add NEG pumps to improve vacuum near electron detector. quad upgrades not in 12 GeV project: two 20A power supplies

Further work needed Layout to pin down locations to centimeters (Accelerator and Engineering) 11 GeV raster design: 40% longer coil and power supply with twice the voltage, 40% more current. If the pair of coils of the same plane must be driven in series, four times the voltage and 1.4 times the current. (TBD) Moller polarimeter dipole and detector S/N modeling; shielding design with BPMs, correctors and rasters where 4” pipe now exists. Primary beam through Moller dipole – what corrector strength is needed? (Hall A collaboration) Combined optics must be implemented to allow high current Moller polarimetry. This requires one quad between the Moller dipole and the fast raster, increasing design problem of the latter. It will also constrain either beam size or phase advance in 7m before target. (Physics and Accelerator)

Conclusions (1) A rearrangement of the Hall A line is proposed which removes a severe optics constraint, raster performance Beam quality will be improved for all experiments, especially 11 GeV parity experiments including MOLLER. Ion chamber trips will be reduced, improving availability and reducing irritation in MCC and the other halls Cost of order $0.8M: design, procurements, installation

ep system The ep system is not functional. It is very difficult to steer in the Compton with the ep ion chambers set to trip at low values. Compton optics matching will take several hours and disrupt the other halls unless one hour mask durations may be applied to Compton and ep ion chambers during optics data acquisition using harps. Do any of the remaining 6 GeV experiments require the ep system? Will the system be of any use at higher energy? Might the system be easier to repair if removed from the hall during January 2010? Replace with 10 cm beam tube for vacuum conductance.

UVa Polarized target chicane 2007 design for g2p requires removal of Moller polarimeter shielding, inverted quad girder, and final diagnostic girder for vertical chicane. Moller polarimeter will be non-functional. Proposed design has room for vertical chicane after final correctors, in space designated for ep and final diagnostic girder. Moller polarimeter intact. Space for second fast raster in proposed design may be occupied by slow raster. Tungsten calorimeter can substitute for Unser and second BCM as on next slide.

Beamline Chicane Moller Target center EP Chicane Design : Jay Benesch (JLab CASA) Two upstream Dipoles, one with vertical degree of freedom. Reuse the dipoles from the HKS experiment. Utilize open space upstream of target. Minimal interference with existing beamline equipment. UVA/Jlab 5 T Polarized Target Upstream Chicane and supports Slow raster and Basel SEM. Instrumentation for nA beam. Local beam dump. Hall A Septa. Major Installation

layouts – g2p and this proposal 4.5m available where ep is shown, not 5m 1m of 10cm tube with H/V corr, 3” BPM, switch to 2.5cm tube, quad, 2m fast raster, BPM, H/V correctors

The Experiment E 0 (GeV) µ (deg)Days Data Taking 15.7 Overhead 8.4 Total Days 24.1 Qweak has polarization control for 2.2, 3.3 and 4.4 GeV

Conclusions (2) The ep system should be removed from the hall ASAP. Repair offline if the collaboration wishes. The proposed Hall A line is more compatible with the vertical chicane needed for the UVa polarized target and g2p than is the present line. If mechanical design begins in January 2010 and labor is available it should be possible to install the new line and g2p in the six month 2011 down. BTW – I hope you’ve got the He3 needed for the dilution refrigerator. DHS has exhausted the supply.