LCB/ICFA meeting at Newport News with full snow, 26-27 February This is only for TB meeting Presentation and not for Distribution. (2015-3-3)

Slides:



Advertisements
Similar presentations
ILD Resource Survey 2014/9/9 Y. Sugimoto 1. Committee under MEXT ILC Task Force in MEXT Academic experts committee Particle-Nuclear physics WG Members.
Advertisements

SIXTH MEETING OF THE ILC PROJECT ADVISORY COMMITTEE (PAC) 19/20 May 2011; Institute of Physics, Academia Sinica, Taipei, Taiwan 1.
Manpower and space requirements for ILD 2015/1/13 Y. meeting at SLAC 1.
LCC status Lyn Evans 1April 18, 2015PAC Orsay. ILC in Linear Collider Collaboration 2 ICFA Chair: J Mnich Program Adv. Committee PAC – Chair: N. Holtkamp.
ALCC Americas’ Linear Collider Committee Andy White University of Texas at Arlington.
Current Status of ILC Project Keisuke Fujii, KEK May 9, 2015.
ALCW15 Mike Harrison AD&I and Change Request status.
ECFA LCWS 26 May 2013 DESY Sachio Komamiya The University of Tokyo 1 26 May 2013 DESY Hamburg Linear Collider Board (LCB) Report.
Status of ILC Barry Barish Caltech / GDE 17-Aug-07.
1 Albrecht Wagner, Snowmass 0805 Albrecht Wagner DESY and Hamburg University Challenges for Realising the ILC.
HEPAP and P5 Report DIET Federation Roundtable JSPS, Washington, DC; April 29, 2015 Andrew J. Lankford HEPAP Chair University of California, Irvine.
ECFA European Committee for Future Accelerators ECFA ACTIVITIES Lenny Rivkin, EPFL & PSI CHIPP Plenary meeting Fribourg, 30 June – 2 July, 2014.
Atsuto Suzuki. 2 Japan Policy Council Second Recommendations: Regional Development through Creation of Global Country inside Japan Realizing a global.
ICFA Report to KILC12 January 2011 to April 2012 Pier Oddone – ICFA Chair Pier Oddone; 23 April 2012ICFA Report to KILC121.
MEXT Review Process in Japan 2014/7/16 Y. Sugimoto 1.
Organizing the Linear Collider. Steps toward the ILC 1989 – 1996: Operation of the world’s only linear collider, the 90 GeV SLC at Stanford Linear Accelerator.
J. Mnich for Pier Oddone | ICFA Report to Lepton Photon 2013 June 28, 2013 | Page 1 ICFA Report to Lepton Photon 2013 J. Mnich (for Pier Oddone, ICFA chair)
ICFA Report to Lepton-Photon 2015 July 2014 to August 2015 J. Mnich (DESY) August 21, 2015.
Status of Linear Collider Activities Rika Takahashi on behalf of the LC Communicators 104 November, 2013 Interactions US.
Nick Walker, Brian Foster LAL, Orsay WP2: Coordination with the GDE.
International Linear Collider The ILC is the worldwide consensus for the next major new facility. One year ago, the choice was made between the two alternate.
ILC Accelerator Status Lyn Evans, CERN, Imperial College London 1A. Yamamoto, LCB ILC Acc. Status.
Atsuto Suzuki. 1. Toward ILC Construction : Japanese Activities 1. Toward ILC Construction : Japanese Activities.
1 1 LCC Physics and Detector Hitoshi Yamamoto ECFA LC2013, DESY May 27, 2013.
M. Ross, N. Walker, A. Yamamoto ILC Cost Review, (updated for TB) and Cost Drivers  Future R & D ILC Cost Review (M. Ross,
1 The Design & Value Costs SRF Technology The XFEL as a Prototype Japan as a Host International Linear Collider Status Mike Harrison.
ILC – Recent progress & Path to Technical Design Report Brian Foster (Hamburg/DESY/Oxford & GDE) Plenary ECFA CERN 25/11/11.
Summary of SRF WG, LCWS14 H. Hayano, A. Yamamoto.
24-Aug-11 ILCSC -Mumbai Global Design Effort 1 ILC: Future after 2012 preserving GDE assets post-TDR pre-construction program.
HEPResearchers Set-up JLCB and JLCC ~6 Cite Decision Design ILC Lab. Japan Policy Council Positive Reference from New Prime Minister.
THE INTERNATIONAL COMMITTEE FOR FUTURE ACCELERATORS (ICFA) Roy Rubinstein2nd International Conference on New Frontiers in Physics - 4 September
1 SPAFOA Capitol Hill Briefing December 2013 Harry Weerts International Linear Collider - progress & status SPAFOA meeting, Dec 11, 2013, H.Weerts.
Activities and news Last meeting: 2015 CERN budget allocations as expected, now distributed on accounts Annual report done, and MTP (Medium Term Plan)
Brief Introduction of KEK Linear Collider Project Office Akira Yamamoto KEK Report provided for ILC-TB Meeting,
CLIC Workshop, CERN 1 CLIC/ILC Collaboration Report: Marc Ross (Fermilab); for Nick Walker, Akira Yamamoto Project Managers International Linear.
LCWS13 Tokyo. Mr. Kawamura’s Talk Text (in English) – Can be downloaded from the workshop home page Please use today’s version Highlights – We are aware.
The ILC Accelerator – Recent News and Goals for LCWS 2015 Akira Yamamoto (KEK/CERN) 1 1.Technical Advances in The ILC Progress Report 2015 – Post-TDR.
Status and plans for role of Japan in HL-LHC Katsuo Tokushuku Institute of Particle Nuclear Studies (IPNS) High Energy Accelerator Research Organization.
Atsuto Suzuki (KEK), Chair ICFA Report from ICFA ICFA mission and membershipICFA PanelICFA Activity.
1 Future Circular Collider Study Preparatory Collaboration Board Meeting September 2014 R-D Heuer Global Future Circular Collider (FCC) Study Goals and.
SCRF Cavity WebEx Meeting May 17, 2010 Reports from PM (10 min.) – Brief report from ILC-PAC – Industrialization workshop as IPAC satellite meeting, Kyoto,
24-July-10 ICHEP-10 Paris Global Design Effort 1 Barry Barish Paris ICHEP 24-July-10 ILC Global Design Effort.
The Situation in Japan Yasuhiro Okada, Executive Director, KEK ILD meeting 2014 September 7, 2014, Oshu-city, Iwate, Japan 1.
ICFA Report to New Frontiers in Physics January 2011 to April 2012 Pier Oddone – ICFA Chair Pier Oddone; June 15, 2012New Frontiers in Physics1.
Main Linac Technology (MLT) Meeting To be held through WebEx July 13, 2007.
AWLC14 - FERMILAB May 12-16, 2014 Conventional Facilities & Siting Working Group Summary V Kuchler, A Enomoto, J Osborne.
ICFA J. Mnich (DESY) November 5, J. Mnich | ICFA LCWS Panel Discussion 5 November 2015 | page 2 ICFA Web Page and Mandate ICFA: International Committee.
Nan Phinney SLAC ILC Worldwide Event, Fermilab, June 12, 2013 (Many slides courtesy of Marc Ross, Akira Yamamoto, Barry Barish) ILC Accelerator A 25-year.
SCRF Monthly WebEx Meeting March 9, Report from PMs (15 min.) 1.Acknowledgements for completing S1-Global cold/RF test (A. Y.) 2.GDE meeting plan.
ILC Accelerator Activities in Japan
Introduction and Meeting Objectives
LCC L. Evans, Santander, 2nd June 2016
LCWS11 AWG9 PARALLEL SESSION SUMMARY
ILC - Upgrades Nick Walker – 100th meeting
Mike PAC Charge & Agenda ALCW15 Plenaries CERN SPC – September 2014
ICFA and the Linear Collider
ICFA Report to C11 August 2016 to August 2017 J. Mnich (DESY)
Introduction to the Workshop
ICFA Report to ICHEP 2016 August 2015 to August 2016 J. Mnich (DESY)
Annual ILC detector meeting K. Kawagoe (Kyushu)
Status Update for NRI Commissioned Survey
ICFA Report Lepton-Photon 2017
BAW Prep S1 Global Status Pilot Plant Status
The DBD: Outline and Scope
Report from ICFA ICFA mission and membership ICFA Panels ICFA and ILC
FALC report and KEK’s plan for the ILC
Yasuhiro Okada, Executive Director, KEK
ICFA Report to FALC February 2016 to August 2016 J. Mnich (DESY)
Barry Barish Paris ICHEP 24-July-10
ICFA Report to FALC June to November 2015 J. Mnich (DESY)
Presentation transcript:

LCB/ICFA meeting at Newport News with full snow, February This is only for TB meeting Presentation and not for Distribution. ( )

Linear Collider Board Meeting: at JLab, :00 – Linear Collider Overview (Evans; ) 09:40 –ILC Status (Evans/Harrison  Yamamoto; ) 10:40 –Break 11:00 –CLIC Status (Stapnes; ) 11:40 –Linear Collider Detector Status (H. Yamamoto; ) 12:40 –Lunch 14:00 –April 2015 PAC Meeting (Komamiya; ) 14:20 –LCB Subcommittee 1 on Governance (Foster; ) 14:55 –LCB Subcommittee 2 on an International Agreement for the ILC Project (Komamiya 15+ 5) 15:15 – Break 15:35 –Regional Reports (Gao, Le Diberder, Weerts; 3 x 10) 2015/3/2KEK-LC-Meeting2

ILC Accelerator Status Akira Yamamoto (LCC, KEK/CERN) for L. Evans and M. Harrison 3 1.Technical Advances in Post-TDR Design Updates based on a specific model-site, 3.TDR Verification ongoing by MEXT-WG A. Yamamoto, LCB ILC Acc. Status

4 Technical Highlights in 2014 Nano-beam ATF2: reached 44 nm at the final focus, closing the primary goal of 37 nm ‒Corresponding to 7 nm at the ILC energy (250 GeV/beam) with the goal of 6 nm SRF EXFEL: exceeded 50 % ( 400/800) cavity production, and 10 % (10/100 ) cryomodule assembly and test Fermilab-ASTA: reached the ILC specification gradient SLAC-LCLS: started the project in consortium with the US SRF laboratories KEK-STF2: completed CM1+CM2a installation into the beam line Accelerator Design and Integration (ADI) LCC: processed Post-TDR design update with a model-site assumption ‒Common L* for both detectors of ILD and SiD ‒Vertical access at Detector Hall at IR points ‒Extension of ML tunnel for optimizing e+e- collision timing and for redundancy of ML SRF cavity gradient integration LCC: is continuing to seek for potential cost saving in balance to necessary increase A. Yamamoto, LCB ILC Acc. Status

Plan to prepare for ILC realization StagePre-Prep Prep. 1Prep. 2Prep. 3Prep. 4Construction Beam Year (anticipated) We are Here  1 st 3 rd 7 th 16 th (~2030) JPCommittee/WGs ILC StagePre-prep. (w/o ded. Fund. )Preparation (w/ dedicated funding)Construction (9 yrs) Beam op. CFSPre. Land-survey, & Localization L. survey, Assess., Eng. plan & design/drawing ADIAcc. Parameters fixed,Engineering Design optimized SRFProd. Technology, & stabilization Cost-effect. Production., Hub-lab functioning, Nano- beam FF beam size demonstrationFF: beams stability Sourcese+ source tech.Prototype demonstrated SRF-Linac worldwide (for photon science): EXFEL EXFEL constructionEXFEL beam operation (2016 E) LCLS LCLS tech. feasibility LCLS Construction LCLS beam operation (2019 E) CERN-LHC (hadron) HL-LHC LS1LHC-Run2 ( )LS2Run 3 ( )LS3Run 4 (2024-) Pre. Green-Sign for preparation Green-Sign for Int’l ILC Lab starting 2015/3/2KEK-LC-Meeting 5

Plan to prepare for ILC realization StagePre-Prep Prep. 1Prep. 2Prep. 3Prep. 4Construction Beam Year (anticipated) We are Here  1 st 3 rd 7 th 16 th (~2030) JPCommittee/WGs ILC StagePre-prep. (w/o ded. Fund. )Preparation (w/ dedicated funding)Construction (9 yrs) Beam op. CFSPre. Land-survey, & Localization L. survey, Assess., Eng. plan & design/drawing ADIAcc. Parameters fixed,Engineering Design optimized SRFProd. Technology, & stabilization Cost-effect. Production., Hub-lab functioning, Nano- beam FF beam size demonstrationFF: beams stability Sourcese+ source tech.Prototype demonstrated SRF-Linac worldwide (for photon science): EXFEL EXFEL constructionEXFEL beam operation (2016 E) LCLS LCLS tech. feasibility LCLS Construction LCLS beam operation (2019 E) CER HL-LHC LS1LHC-Run2 ( )LS2Run 3 ( )LS3Run 4 (2024-) Pre. Green-Sign for preparation Green-Sign for Int’l ILC Lab starting 2015/3/2KEK-LC-Meeting 6

Plan to prepare for ILC realization StagePre-Prep Prep. 1Prep. 2Prep. 3Prep. 4Construction Beam Year (anticipated) We are Here  1 st 3 rd 7 th 16 th (~2030) JPCommittee/WGs ILC StagePre-prep. (w/o ded. Fund. )Preparation (w/ dedicated funding)Construction (9 yrs) Beam op. CFSPre. Land-survey, & Localization L. survey, Assess., Eng. plan & design/drawing ADIAcc. Parameters fixed,Engineering Design optimized SRFProd. Technology, & stabilization Cost-effect. Production., Hub-lab functioning, Nano- beam FF beam size demonstrationFF: beams stability Sourcese+ source tech.Prototype demonstrated SRF-Linac worldwide (for photon science): EXFEL EXFEL constructionEXFEL beam operation (2016 E) LCLS LCLS tech. feasibility LCLS Construction LCLS beam operation (2019 E) CERN-LHC (hadron) HL-LHC LS1LHC-Run2 ( )LS2Run 3 ( )LS3Run 4 (2024-) Pre. Green-Sign for preparation Green-Sign for Int’l ILC Lab starting 2015/3/2KEK-LC-Meeting7

Objectives: : Further optimize the ILC accelerator design parameters, assuming a site model in Japan, and to seek for the best cost-effective construction, Process for the Change Management: Changes 8 ILC Accelerator Design: Post-TDR Updates Propose (Creator) ReviewDecideImplement CR-001Add return “Dogleg” to target by- pass 2014/08/27 (K.Yokoya) doneRejected CR-002Adapt equal L* for both detectors2014/09/02 (G. White) doneDiffered to Review Panel L* to be settled to ~ 4 m CR-003Detector hall with vertical shaft access 2014/09/16 (K. Buesser) doneAcceptedIn progress CR-004Extension of the e-e+ ML tunnels by about 1.5 km 2014/12/18 (N. Walker) In progress CR-005… 2015/3/2KEK-LC-Meeting

MEXT’s Organization for Studying ILC 9 MEXT Particle & Nuclear Phys. Working Group formed in 2014 TDR Validation Working Group formed in 2014 SCJ ILC Taskforce formed in 2013 Academic Experts Committee formed in 2014 Recommendation in A. Yamamoto, LCB ILC Acc. Status

Progress in MEXT Academic Expert Committee for the ILC Particle and Nuclear Physics WG TDR Verification WG (* closed mtg ) 1 st Academic Expert Committee (14/05/08) 1st : 6/24Status and Prospect for Particle Physics ILC Project and the Physics 1 st : 6/30TDR and the cost, generally reported 2nd : 7/29Strategies at EU and Ams 2 nd : 7/28*SRF and the cost 3rd : 8/27Cosmic-ray and astrophysics ILC Science Objectives 3 rd : 9/8*SRF and the cost (continued) CFS 4th : 9/22Flavor and Neutrion Physics IILC Science Objectives 4 th : 11/4*ILC construction cost 5th : 10/21Summary discussion for a report 2 nd Academic Expert Committee (14/11/14) 6th : 1/8Experience from SSC ILC Science Objectives 5 th : 1/26* ILC Accelerator and human resources 7th : 2/17 Science Objectives per 6 th : 3/2* Summary discussions 8th : 3/30Summary discussion for a report 3 rd Academic Expert Committee (15/4/21) 10

ICFA Meeting at JLab, 2015/2/26~27 1.FALC Report (Lockyer, ) 2.ILC Progress in Japan (Nozaki; 20 +5) 3.Discussion on ICFA and accelerator science (Mnich; 45) 4.Proposal for a new ICFA Panel on Sustainable Acc./Colliders (Nozaki; ) 5.Global Planning for HEP, including a 100 TeV Collider (Mnich; 45) 6.ICFA Seminar—lessons learned and any suggestions for changes (Wang; ) 7.InterAction Report (Yurkewicz; ) 8.Report on ICFA-ICUIL activities (Tajima; ) 9.Linear Collider School (Stapnes; ) 10.ICFA Panel Reports (n x 10 where n ≤ 6) 11.Reports from Labs and Regions  M. Yamauchi (new DG expected) attend ICFA, first tiem. 12.Future ICFA Meetings (8/19, Selvia?) 13.Any Other Business 2015/3/2KEK-LC-Meeting11