Edgar L. Black MUCOOL ADVANCED M.T.F. & M.I.C.E. LAYOUTS August 12-13, 2002 Edgar L. Black IIT.

Slides:



Advertisements
Similar presentations
MICE RF and Coupling Coil Module Outstanding Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 26, 2004.
Advertisements

Photo KEK March-28, 2002 MICE Absorber and Test Cryostat Shigeru Ishimoto (KEK) Shoji Suzuki (KEK) Edgar Black (IIT) Mary Anne Cummings (NIU) (1) MICE.
MuCool Outlook and Plans  Over the past year we have had a very successful program that will be detailed in the next two sessions: u MuCool Test Area.
SRF Cryomodule Assembly Facility Plans Tug Arkan AAC, May 10-12, 2005.
RF Measurement Plan Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory January 20, 2011 MICE Video Conference Meeting.
Trip Report on the visit to ICST of HIT, Harbin, China Derun Li Mike Green Steve Virostek Mike Zisman Lawrence Berkeley National Laboratory (from December.
Agreement on scope of supply and extent of interface among different suppliers of the AFC module This talk covers the scope of supply on the Absorber Focus.
MICE Collaboration meeting at CERN March 28 – April 1, 2004 MICE Cooling Channel --- AFC Module work group report Wing Lau – Oxford.
Installation Issues Steve Virostek Lawrence Berkeley National Lab MICE CM23 at ICST, Harbin January 13, 2009.
Proposal for Convection Absorber Test with Hydrogen at Fermilab Barry Norris Representing colleagues in BD/Cryogenics February 21, 2003.
MICE LH2 Operating Parameters Mary Anne Cummings MICE October ‘02 LBL Oct. 24, 2002.
5/7/2003Edgar L. Black IIT MICE Meeting at Columbia University Hydrogen/Focus Module Components assembly Details concept June 13,2003.
MICE Engineering Integration Update August 13, 2003 Edgar L. Black IIT.
MUCOOL Collaboration Meeting February 2002 Steve Geer February 2002.
Absorber/vacuum windows and absorber assembly 1.Window Requirements 2.MICE experimental constraints 3.Welded vs. non-welded windows 4.Installation 5.Testing.
MICE modules interface proposal FAC module Phone meeting Edgar Black IIT 2/13/2004.
Flammable Gas Electrical Safety Concerns for detectors: Power per channel Feedthroughs Seals.
MICE Absorber and Test Cryostat Shigeru Ishimoto KEK MICE AFC Module Phone Conference (March 12, 2004) (1) MICE Absorber Test Process (2) MICE Absorber.
LH2 Absorber Heat Load and Homeostasis. What has happened before… 1.Huge LH2 volumes, low heat deposition: Bubble chambers 2.Small LH2 volumes, low heat.
11/26/2002Edgar L Black IIT MICE Video Conference November 27, 2002 Summary of safety implementation for proposal.
MICE Meeting at Columbia University Absorber windows design comparisons E.L.Black/IIT June/2003.
Non-welded Window Option Edgar L. Black IIT August 15,2003.
AFC Module Meeting Friday - May 21, 2004 Report on the Window burst test Edgar Black IIT.
5/7/2003Edgar L. Black IIT MICE Integration Meeting Hydrogen/Focus Module Components Details development May 9, 1003.
MICE VIDEO CONFERENCE Cooling Channel/Detector Integration July 30, 2003 Edgar L. Black IIT.
MUTAC Review 3/16/06 A. Bross MuCool Overview and Plans Muon Cooling R&D MUTAC Review March 16, 2006 A. Bross.
Status of 201 MHz Prototype and RFCC Module Derun Li, S. Virostek, M. Zisman Center for Beam Physics Lawrence Berkeley National Laboratory In collaboration.
Spectrometer Solenoid Fabrication & Testing Update Steve Virostek Lawrence Berkeley National Lab MICE CM24 at RAL June 1, 2009.
MICE Collaboration Meeting March 29 - April 1, CERN MICE alignment, tolerances and supports Tuesday March 30 Room Edgar Black/IIT March17-
1 Infrastructure at RAL Iouri Ivaniouchenkov, RAL MICE Collaboration CERN, 29 March 2003.
Integration March 18, 2004 Latest MICE integrated lattice layout Edgar L.Black IIT.
MICE Collaboration meeting at CERN March 28 – April 1, 2004 MICE Cooling Channel --- AFC Module progress update Wing Lau – Oxford.
Mucool cryo-design Christine Darve Fermilab/Beams Division/ Cryogenic Department 8/12/02.
Absorber Design Details Mary Anne Cummings MICE MEETING Columbia June 13, 2003.
RF Cavity / Coupling Coil Module
Assembly, Installation and Interfaces Steve Virostek Lawrence Berkeley National Lab RFCC Module Design Review October 21, 2008.
Progress on the MuCool and MICE Coupling Coils * L. Wang a, X. K Liu a, F. Y. Xu a, A. B. Chen a, H. Pan a, H. Wu a, X. L. Guo a, S. X Zheng a, D. Summers.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MAP Winter Collaboration Meeting at JLab, Virginia February 28, 2011.
MICE Coupling Coil Update Steve Virostek for Allan DeMello Lawrence Berkeley National Laboratory MICO January 23, 2013 January 23, 2013.
Hydrogen system R&D. R&D programme – general points Hydrogen absorber system incorporates 2 novel aspects Hydrogen storage using a hydride bed Hydrogen.
Linac R&D Update May 15, L-Band Source Consists of a LLRF system (VME/Epics based), a SNS High Voltage Converter Modulator (on loan), a Thales 2104C.
Cryomodule Development at Fermilab Don Mitchell Representing the SRF engineering community at Fermilab April 20, 2009 Tsukuba, Japan TILC09.
MCTF 8/17/06 A. Bross MTA Activities and Plans MCTF August 17, 2006 A. Bross.
MICE Status & Plans MICE-UK paul drumm 15 th September 2004.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM29 at RAL, UK February 17, 2011.
Summary of the RF Parallel Session Steve Virostek Lawrence Berkeley National Lab MICE Collaboration Meeting 18 June 16, 2007.
MICE RF Cavities and RFCC Module Update Allan DeMello and Derun Li Lawrence Berkeley National Laboratory MICE CM32 at RAL, UK February 9, 2012 February.
SBS Magnet and Infrastructure Status Robin Wines July 2015.
Spectrometer Solenoid Fabrication Status and Schedule RF Cavity / Coupling Coil Module Plan and Progress Steve Virostek Lawrence Berkeley National Lab.
MICE LH2 Absorber Safety Mary Anne Cummings Edgar Black (IIT) Abingdon, UK Oct. 30, 2003.
1 Alan Bross AEC March 31, 2008 MuCool RF Program Muon Cooling R&D Alan Bross.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory Oxford, UK July 7, 2011 July 7, 2011.
1 Status of infrastructure MICE Collaboration Meeting, Frascati, June 26-29, 2005 Yury Ivanyushenkov Applied Science Division, Engineering and Instrumentation.
MICE Coupling Coil Update Allan DeMello Lawrence Berkeley National Laboratory Illinois Institute of Technology June 17, 2013 June 17, 2013.
Overview of On-going Cryogenic Work At the MTA Barry Norris AD/Cryo February 14, 2005.
201 MHz Cavity Plans Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory February 11, 2011 MAP Friday Video Conference Meeting.
SRF Collaboration Shekhar Mishra Fermilab. Overview Charge: Does the laboratory make effective use of collaboration and existing SRF capabilities at other.
MICE Coupling Coil Vacuum Vessel Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
RFCC Engineering Status and Plans Allan DeMello Lawrence Berkeley National Laboratory MAP Winter Meeting March 6, 2012 March 6, 2012.
1 MICE Coupling Coil Cryostating and Test Steve Gourlay March 1, Office of Science.
Fabrication of Remaining Components Allan DeMello Lawrence Berkeley National Laboratory MICE RF Workshop Fermilab June 2, 2014.
K.Long/G.Barber Mice Tracker Mechanical Status CM20 Feb 08 1 Mice Tracker Mechanical Status Contents:- Tracker 1 Status Tracker 2 Status Further Hardware.
S A Griffiths CM42 June 2015 Electrical & Control.
FIRST VIDEO CONFERENCE JANUARY 7, 2004 Edgar L. Black IIT
LARP Vertical Test Facility
Introduction Jason Tarrant – Integration Engineering Step IV Removal
The 11T cryo-assembly: summary of design and integration aspects
MICE Coupling Coil Update
Potential Use of PEP-II Magnets by Project X
Experimental equipment Edgar L. Black February 17, 2019
Presentation transcript:

Edgar L. Black MUCOOL ADVANCED M.T.F. & M.I.C.E. LAYOUTS August 12-13, 2002 Edgar L. Black IIT

CURRENT EFFORTS FOR M.T.F. FINALIZE DETAILS OF FORCED COOLANT FLOW ABSORBER TO BE INSERTED INTO THE LAB G MAGNET. COORDINATE DESIGN OF THE CONVECTIVE TYPE ABSORBER FOR THE SAME LOCATION (KEK COLLABORATION). COMPLETE WINDOWS DESIGN WITH SHOP DRAWINGS FOR FABRICATION (TO BE SUBMITTED TO THE MISSISSIPPI COLLABORATION AT THE END OF THIS MEETING). INITIATE THE INTERFACE RESOLUTION OF UP & DOWN SIDE VACUUM WINDOW DESIGN REQUIREMENTS, (INCLUDING IMMEDIATE AND FUTURE EXPERIMENT PROGRAMS) START INSTRUMENTATION HARDWARE INTEGRATION DESIGN FOR THE IMMEDIATE TEST PLANS.

Edgar L. Black MAGNET, CRYOSTAT & ABSORBER LAYOUT

Edgar L. Black MTF ABSORBER FORCED FLOW

Edgar L. Black WINDOW/ ABSORBER SEAL DETAIL (SECTION OF THE MANIFOLD)

Edgar L. Black ABSORBER WINDOW DETAIL

Edgar L. Black WINDOW TEST PLATE

Edgar L. Black VACUUM VESSEL WINDOW

Edgar L. Black CURRENT EFFORTS FOR M.I.C.E. NEED MORE STUDIES TO INTEGRATE NEW M.GREEN MAGNET DESIGN INTO THE SFOFO1 CONFIGURATION (CONFLICT WITH THE RF FEEDS). NEED MORE STUDIES TO INTEGRATE NEW M.GREEN MAGNET DESIGN INTO THE SFOFO1 CONFIGURATION (CONFLICT WITH THE RF FEEDS). INITIATED PLANT LAYOUT COORDINATION FOR THE INSTALLATION AT RAL (COMMUNICATION WITH IOURY) INITIATED PLANT LAYOUT COORDINATION FOR THE INSTALLATION AT RAL (COMMUNICATION WITH IOURY) NEED MORE INFORMATION ON THE PLANT FACILITIES NEED MORE INFORMATION ON THE PLANT FACILITIES

Edgar L. Black SFOFO/M.I.C.E. CONFIGURATION

Edgar L. Black M.I.C.E. SFOFO

Edgar L. Black LOCATION IN QUESTION PARTIAL VIEW OF THE R.A.L. FACILITY

Edgar L. Black LOCATION ENLARGED

Edgar L. Black FUTURE ACTIVITIES WITH TIME DURATIONS (HRS) 1-FABRICATION OF 21CM WINDOWS AND PRESSURE TEST PLATES OR 5 WINDOWS FOR EACH MATERIAL? 3 OR 5 WINDOWS FOR EACH MATERIAL? 2 - RESOLVE VACUUM WINDOW ISSUES AND COMPLETE THE DESIGN FOR FABRICATION PERFORM PHOTOGRAMETRY MEASUREMENTS OF THE AS BUILT WINDOWS AT FERMILAB SET UP FACILITY AT N.I.U. FOR WATER AND CRYO PRESSURE BURST TESTS AND TEST PERFORM PHOTOGRAMETRY MEASUREMENTS DURING TEST AT N.I.U FABRICATION OF MANIFOLD ASSEMBLY AND ACCEPTANCE TEST COMPLETE INFRARED HEAT TRANSFER FLOW WITH THE 15 CM MANIFOLD ASSEMBLY PROCURE (OR BORROW) VERTICAL CRYOSTAT FOR THE ABSORBERS FLOW TEST. 160 OR SETUP CRYO FLOW TEST SYSTEM (AT FERMILAB OR N.I.U.) AND PERFORM TESTS.320