The McGraw-Hill Companies Generation & Transmission Industry Trends Douglas M. Logan, Principal Platts Research & Consulting / RDI Presented to: PES Policy.

Slides:



Advertisements
Similar presentations
Chapter 7 Learning Objectives
Advertisements

Chapter 13 Learning Objectives
1 The Changing Fortunes of the EUs Energy Market Antony Froggatt.
NERC Policies Introduction
Chapter 12 Keynesian Business Cycle Theory: Sticky Wages and Prices.
Terms. 1. Globalization 2. Financing 3. Inputs.
Chapter 6. Competitive strategy: The analysis of strategic position
Copyright © 2002 Pearson Education, Inc. Slide 1.
Copyright © 2002 Pearson Education, Inc. Slide 1.
Copyright © 2008 Pearson Addison-Wesley. All rights reserved. Chapter 13 International Trade in Goods and Assets.
Copyright © 2008 Pearson Addison-Wesley. All rights reserved. Chapter 11 Market-Clearing Models of the Business Cycle.
© 2008 Pearson Addison Wesley. All rights reserved Chapter Seven Costs.
McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved. Chapter 40 The Stock Market Crashes.
Chapter 1 The Study of Body Function Image PowerPoint
Electricity and Natural Gas Supply, Reserves, and Resource Adequacy CMTA Energy Conference Energy: Growing Californias Economy William J. Keese California.
The Midwest ISO from a Transmission Owner Perspective.
1 1 Presented by: Sara L. Johnson Managing Director Global Macroeconomics Group DRI-WEFA August 7, 2001 The U.S. Economic Outlook: Turbulent Times.
TABLE OF CONTENTS CHAPTER 1.0: Trends in the Overall Health Care Market Chart 1.1: Total National Health Expenditures, 1980 – 2005 Chart 1.2: Percent Change.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Making Your Business Grow
Year 6 mental test 5 second questions
Year 6 mental test 10 second questions
1 Climate Change Policy and Regulatory Jurisdiction James Bushnell UC Energy Institute Comments drawn from Bushnell, Peterman, and Wolfram, Local Solutions.
McGraw-Hill/Irwin Copyright © 2013 by The McGraw-Hill Companies, Inc
Richmond House, Liverpool (1) 26 th January 2004.
Order 2000 and PJM: A Natural Match Craig Glazer Manager of Regulatory Affairs PJM Interconnection, LLC.
March, 2000 Order 2000 for SERC 1 Powersmiths Intl FERC Order 2000 Summary March, 2000.
Trade Promotion Management Study Summary Charts
Economic Efficiency, Government Price Setting, and Taxes
CHAPTER 5 ESSENTIALS OF FINANCIAL STATEMENT ANALYSIS.
The Federal Reserve System Chapter 14 Copyright © 2010 by the McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Chapter 4 Supply Contracts.
Copyright © 2001 by Houghton Mifflin Company. All rights reserved. 1 Economics THIRD EDITION By John B. Taylor Stanford University.
Wholesale Restructuring 1.PURPA 2.Market based wholesale rates 3.Incentive rates 4.Energy Policy Act of 1992 Clarified power to order third party wheeling.
EMIG Electricity Market Investment Group Presentation to the Ontario Energy Board February 17, 2004.
PERSPECTIVES OF THE COMMON BALTIC ELECTRICITY MARKET Prof. Inna Steinbuka, Chair, Public Utilities Commission, Latvia The Institute of Economic Affairs.
1 Project 2: Stock Option Pricing. 2 Business Background Bonds & Stocks – to raise Capital When a company sell a Bond - borrows money from the investor.
1 Pricing Concepts & Setting the Right Price. 2 The Importance of Price to Marketing Managers Revenue Profit The price charged to customers multiplied.
Section 26.2 Setting Prices
Indonesia’s current account challenge
Foundations of Chapter M A R K E T I N G Copyright © 2003 by Nelson, a division of Thomson Canada Limited. Managing the Pricing Function 14.
Does Debt Policy Matter?
Chapter 10 Project Cash Flows and Risk
Capacity Planning For Products and Services
VOORBLAD.
Financial Planning and Forecasting Financial Statements
Factor P 16 8(8-5ab) 4(d² + 4) 3rs(2r – s) 15cd(1 + 2cd) 8(4a² + 3b²)
© 2012 National Heart Foundation of Australia. Slide 2.
Understanding Generalist Practice, 5e, Kirst-Ashman/Hull
25 seconds left…...
Chapter 4: Financial Statement Analysis
Januar MDMDFSSMDMDFSSS
We will resume in: 25 Minutes.
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
PSSA Preparation.
Copyright © 2008 Pearson Addison-Wesley. All rights reserved. Chapter 11 Market-Clearing Models of the Business Cycle.
1 Chapter 20 New Horizons. 2 Understand the many changing dimensions that shape international business. Learn about and evaluate the international business.
Congestion Management Settlement Credits December, 2002.
Foundations of Chapter M A R K E T I N G Copyright © 2003 by Nelson, a division of Thomson Canada Limited. Global Marketing 20.
Stock Valuation and Risk
Investing in Stocks Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall Learning Objectives 1. Invest in stocks. 2. Read stock.
3 - 1 Copyright McGraw-Hill/Irwin, 2005 Markets Demand Defined Demand Graphed Changes in Demand Supply Defined Supply Graphed Changes in Supply Equilibrium.
North American Natural Gas Infrastructure Needs Donald F. Santa, Jr. President Interstate Natural Gas Association of America The Independent Petroleum.
Presentation transcript:

The McGraw-Hill Companies Generation & Transmission Industry Trends Douglas M. Logan, Principal Platts Research & Consulting / RDI Presented to: PES Policy Development Coordinating Committee IEEE Summer Power Meeting Chicago - July 24, 2002

2 Outline North American generation outlook Global generation outlook Transmission trends Regulatory trends

3 North American Generation Development NEWGen July 2002 database shows 715,000 MW of projects in the U.S. and Canada.

4 Tabled and Canceled Projects Tabled and canceled projects have surged since November 2001.

5 What Is Getting Tabled or Canceled? NEWGen March 2002 database shows 66,500 MW of projects in April 2001 database tabled or canceled since April Status in April 2001

6 What Is Getting Built? Gas still rules.

7 North American Generation Capacity Additions After removing tabled or canceled projects there are 537,000 MW of active projects in the U.S. and Canada. But...

8 North American Additions in Historical Perspective The current boom is modest relative to what happened in the 1970s.

9 Projected U.S. Supply / Demand Balance Surpluses may persist in some regions through But shortages may return if generation development fails to pick up again.

10 Wholesale Power Market Price Trends High prices in the West collapsed a year ago. Midwest price spikes have not recently recurred.

11 Projected Wholesale Power Market Prices High prices last year in the West and moderate prices elsewhere have given way to low prices as surplus develops.

12 RDI Baseline Gas PriceForecast The long-term price outlook is between $2.75 and $3.50 per mmBtu.

13 Sources of U.S. Incremental Supply The Gulf-of-Mexico, the Rocky Mountains, Eastern Canada, and Arctic supply all will share a role with LNG in growing the U.S. gas supply base. Several of these marginal sources – deep onshore gas, LNG, the Eastern Canadian offshore areas - and the Northern Frontier have surprisingly similar full-cycle development costs.

14 Global Generating Capacity Additions The global outlook is heavily dependent on what happens in Asia.

15 Global Generating Capacity Additions

16 Trend in Planned Transmission Additions The declining trend in planned transmission additions has bottomed out. Source: NERC ES&D database, various years. Planned additions as % of existing miles

17 Length Distribution of Planned Transmission Additions Planned additions are still dominated by short projects. Source: NERC ES&D database, 2001.

18 Generation Development Mid-Atlantic The current pattern of generation development is dominated by gas-fired projects near load centers. Source: NEWgen database; POWERmap.

19 Financing Transmission Projects Rolled in –ERCOT Transmission Expansion Allocated between system & generation –PJM RTEP Participant funded with firm rights –Path 15 Upgrade Merchant –Neptune

20 Path 15 Upgrade - Participants Trans-Elect72%$249.6M Line PG&E18% 55.1MSubstations Western, PM10% 1.3MLand

21 What Is a Merchant Project? Assumes full market risk Creates tradeable transmission rights Makes initial capacity allocation by open season Allows access by competitors Is subject to market monitoring Does not impair existing rights Is subject to RTO coordination & reliability requirements

22 Trans-Elect Formed early 1999 First truly independent transmission company First acquisition July 4, 2001 Goal: Two acquisitions per year Owns 12,600 miles of line, acquired from: –TransAlta –Consumers Energy

23 Business Plan Roll-up of transmission assets in North America Purchase from: –Investor-owned utilities –Municipals and cooperatives Construction of additional transmission capacity Privatization of government facilities Source: Presentation by Fred Buckman, January 24, 2002.

24 Business Plan Premises –Transmission is not a growth asset. –Transmission divestiture is a growth strategy. –Transmission divestiture is a solution to the issue of marketplace independence. Source: Presentation by Bernie Schroeder, March 25, 2002.

25 Business Plan The case for divestiture –Utility stock prices have under-performed most major averages. –Aggressive restructuring is rewarded in share price. –Regulators will reward divestiture. –Passive control devalues asset. Source: Presentation by Bernie Schroeder, March 25, 2002.

26 Business Plan Benefits to the seller –No more FERC regulation –Opens up several options to improve shareholder value –Creates cash for seller –Regulatory incentives for independent acquisition to be shared with seller –Expansion and quality of service assured by for- profit transmission utility with the single goal of maintaining high standards of reliability –Seller controls reinvestment of sale proceeds Source: Trans-Elect web site.

27 Business Plan Buyers expectations with divestiture –Higher ROE –Favorable capital gains treatment –Favorable capital structure treatment –Incentives to invest new capital –Long-term rate freezes. Source: Presentation by Bernie Schroeder, March 25, 2002.

28 How Trans-Elect Will Make Money -- The Risks What is assured –Regulated rate of return What is not assured –ROE premium on acquisition –Recovery of acquisition premium –ROE premium on new facilities –Performance-based regulation

29 FERCs Repeated Attempts to Create Open Power Markets Attempt #1 - Orders No. 888 & 889 –To establish non-discriminatory access Attempt #2 - Order No –To promote independent control of systems Attempt #3 - July 2001 Mediation Orders –To address recalcitrance and potential problems with small RTOs Attempt #4 - Standard Market Design –To address unwillingness to form super-RTOs FERCs orders are multiple attempts to eliminate discrimination in transmission access and administration.

30 RDI Transmission Study