U. S. Department of the Interior U. S. Geological Survey LDCM Landsat Data Continuity Mission UND Space Studies Colloquium Jon Christopherson Principal.

Slides:



Advertisements
Similar presentations
U.S. Department of the Interior U.S. Geological Survey Agency Report, WGISS #22 September 15, 2006 Lyndon R. Oleson U.S. Geological Survey Center for Earth.
Advertisements

U.S. Department of the Interior U.S. Geological Survey Agency Report, WGISS #24 October 19, 2007 Lyndon R. Oleson U.S. Geological Survey Center for Earth.
LANDSAT Program Update Tim Newman Coordinator, USGS Land Remote Sensing Program National Geospatial Advisory Committee December 3, 2014.
Landsat Point of Contact USGS Bruce Quirk NGAC Kass Green NGAC Meeting, October 5, 2011.
U.S. Department of the Interior U.S. Geological Survey USGS Satellite data update Ronald E. Beck April 28, 2010.
Resolution.
Daily Average = 3,125 scenes of web-enabled data delivered Over 2.4 million images available today Seven fold increase in scientific and educational.
National Aeronautics and Space Administration Commercial Crew and Cargo Program Overview June 17, 2009 Doug Cooke.
Multispectral Remote Sensing Systems
Introduction, Satellite Imaging. Platforms Used to Acquire Remote Sensing Data Aircraft Low, medium & high altitude Higher level of spatial detail Satellite.
History and Features of Landsat 7 By: Andy Vogelsberg Photo of Landsat 7 taken from tures/litho/landsat/land.jpg.
ÖNCEL AVCIKADİR ÖNCEL AVCIKADİR LANDSAT OBSERVATİON SATELITE SYSTEM Landsat satellites have been collecting images of the Earth's surface for.
Satellite Thermal Remote Sensing of Boiling Springs Lake Jeff Pedelty NASA Goddard Space Flight Center Goddard Center for Astrobiology.
USGS Realignment, Science Planning, and FY 2012 Budget Matthew C. Larsen Associate Director Climate and Land Use Change U.S. Department of the Interior.
Meteorological satellites – National Oceanographic and Atmospheric Administration (NOAA)-Polar Orbiting Environmental Satellite (POES) Orbital characteristics.
Geosynchronous Orbit A satellite in geosynchronous orbit circles the earth once each day. The time it takes for a satellite to orbit the earth is called.
More Remote Sensing Today- - announcements - Review of few concepts - Measurements from imagery - Satellites and Scanners.
CEOS - NSLRSDA Footprint Server John Faundeen U.S. Geological Survey October Ottawa, Ontario, Canada.
1 U.S. Department of the Interior U.S. Geological Survey National Center for EROS Remote Sensing Technologies Group Mapping the Path to Digital Sensor.
Carolyn J. Merry NCRST-Flows The Ohio State University.
Course: Introduction to RS & DIP
Geography 121 Lab #4 Finding Landsat Data November 8, 2006 Dave Alleman Pat Clancy Sarah Gustafson.
© Copyright 2014 STI INNSBRUCK Digital Globe Anna Fensel June
Sources of Free Imagery Glenn Bethel Dec 2, 2008.
1 U.S. Department of the Interior U.S. Geological Survey National Center for EROS Remote Sensing Technologies Group The Proposed USGS Plan for Digital.
USGS Report U.S. Department of the Interior U.S. Geological Survey Kristi Kline USGS EROS Center.
U.S. Department of the Interior U.S. Geological Survey Landsat 8 Data Policy April 14, 2006 Jay Feuquay Land Remote Sensing.
U.S. Department of the Interior U.S. Geological Survey Multispectral Remote Sensing of Benthic Environments Christopher Moses, Ph.D. Jacobs Technology.
Remotely Sensed Data EMP 580 Fall 2015 Dr. Jim Graham Materials from Sara Hanna.
U.S. Department of the Interior 1 Landsat Data Continuity Mission Overview Landsat Ground Station Sioux Falls, SD Representative IC Canada Gilmore Creek.
Resolution Resolution. Landsat ETM+ image Learning Objectives Be able to name and define the four types of data resolution. Be able to calculate the.
10/12/2015 GEM Lecture 10 Content Other Satellites.
U.S. Department of the Interior U.S. Geological Survey Mid Decadal Global Land Survey Project briefing to the ScanEx RDC 3 rd International Conference,
Remote sensing and in situ measurements in the Global Earth Observing System of Systems Curtis Woodcock, Boston University.
The Namibia Flood Dashboard Satellite Acquisition and Data Availability through the Namibia Flood Dashboard Matt Handy NASA Goddard Space Flight Center.
Page 1. U.S. Department of the Interior U.S. Geological Survey Landsat at 40: The Nation’s oldest Earth-observing satellite program Landsat at 40: The.
Earth observation data for everyone: the CBERS experience Gilberto Câmara Director, National Institute for Space Research.
NMP EO-1 TECHNOLOGY WORKSHOP Section 2 Meeting Objectives.
1 Attachment B Attachment B The National Land Remote Sensing Data Archive Relevant Law and Policy Prof. Joanne Irene Gabrynowicz 19 October 2004.
LANDSAT Program Update
Remote Sensing Data Acquisition. 1. Major Remote Sensing Systems.
1 Attachment A USGS EROS Data Center U.S. Geological Survey Department of the Interior EROS Data Center.
GSFC GOES-R Notional End-To-End Architectures Satellite Direct Readout Conference for the Americas December 9 – 13, 2002 Miami, Florida Sandra Alba Cauffman.
1 U.S. Department of the Interior U.S. Geological Survey June 22, 2009 Landsat Data Gap Readiness Plan Briefing to Landsat Science Team Rochester, New.
U.S. Department of the Interior U.S. Geological Survey Entering A New Landsat Era – The Future is Now Tom Loveland U.S. Geological Survey Earth Resources.
FUTURE OF LAND IMAGING U.S. Land Imaging Needs & Long-Term Continuity Future of Land Imaging Interagency Working Group (FLI-IWG) U.S. Group on Earth Observations.
Commercial Remote Sensing Satellite Data Transfer Guidelines USGS Presentation to the ACCRES FACA Committee September 13, 2005.
U.S. Department of the Interior U.S. Geological Survey Future of Land Remote Sensing: Time to Think Again Pecora 16 “Global Priorities in Land Remote Sensing”
Committee on Earth Observation Satellites Mexican Space Agency Plenary Agenda Item # 3 29 th CEOS Plenary Kyoto International Conference Center Kyoto,
U.S. Department of the Interior U.S. Geological Survey John Faundeen October 9, 2011 Future Directions in Data Preservation ^ and Current.
Attachment C The National Satellite Land Remote Sensing Data Archive in the Department of the Interior The National Satellite Land Remote Sensing Data.
Geosynchronous Orbit A satellite in geosynchronous orbit circles the earth once each day. The time it takes for a satellite to orbit the earth is called.
Government / Private Sector Partnership between the U.S. Geological Survey and SPOT Image Corporation U.S. Department of the Interior U.S. Geological Survey.
REMOTE SENSING DATA Markus Törmä Institute of Photogrammetry and Remote Sensing Helsinki University of Technology
6 - 1 June 4, 2002 Earth Observing-1 GSFC Systems Engineering Seminar: EO-1 Results Section 6 Technology Validation and Infusion Status.
1 Status Report on GEO Task AR Advocate continuity for moderate-resolution satellite remote sensing, including support for a Landsat follow-on mission.
Supporting the “Solving Business Problems with Environmental Data” Competition 24 th October 2013 Vlad Stoiljkovic.
U.S. Department of the Interior U.S. Geological Survey Commercial Remote Sensing Data for Federal Users and Partners The Commercial Remote Sensing Space.
Remote Sensing.
Overview of Joint Agency Commercial Imagery Evaluation (JACIE)
LANDSAT OBSERVATİON SATELITE SYSTEM
USGS Status Frank Kelly, USGS EROS CEOS Plenary 2017 Agenda Item #4.14
Landsat Program The World’s Most Sophisticated Optical Observatories of the Earth The World’s Model for International Collaboration in Earth Observation.
Satellite Sensors – Historical Perspectives
USGS Agency Status Landsat Operations Jenn Lacey 21 July 2016
EMP 580 Fall 2015 Dr. Jim Graham Materials from Sara Hanna
Summary - end of term Lab Monday: 4 April return of assignments Lecture exam: 5 April, projects by end of term: April 6 Lecture evaluation.
RADARSAT Constellation Mission Update
Agency Reports – USGS Jenn Lacey LSI-VC-5 Agenda Item #2 February 2018
USGS Status Jenn Lacey, USGS CEOS Plenary 2019 Agenda Item #: 3.6
Presentation transcript:

U. S. Department of the Interior U. S. Geological Survey LDCM Landsat Data Continuity Mission UND Space Studies Colloquium Jon Christopherson Principal Engineer, SAIC USGS EROS Data Center

Introduction NASA and USGS partners for LDCM Now in Evaluation/Selection Phase Announcements have been delayed  Originally to have been May 2003  Now will be ??? This necessarily limits this presentation

U. S. Department of the Interior U. S. Geological Survey The Landsat Data Continuity Mission - Continuation of the Landsat Program Bruce K. Quirk and Raymond A. Byrnes - Presented by Jon B. Christopherson ASPRS Conference Technology: Converging at the Top of the World May 5-9, 2003 Anchorage, AK

Resolution Comparison 1 Kilometer Resolution Advanced Very-High Resolution Radiometer State and coast lines added for visual reference. Note: Hurricane Andrew (8/24/92) passing over Florida. *AVHRR imagery is provided by NOAA IKONOS imagery is provided by Space Imaging Inc. 30 Meter Resolution Landsat 7 Enhanced Thematic Mapper Plus 1 Meter Resolution IKONOS Panchromatic

1966 DOI Earth Resources Observation Systems Program initiated 1972 L1 launched (RBV/MSS) 1975 L2 launched (RBV/MSS) 1978 L3 launched (MSS) 1982 L4 launched (TM/MSS) 1984 L5 launched (TM/MSS) 1985 Commercial operator selected  Operate L4/5 & build/operate Landsat 6/ Commercial viability of L7 rejected 1992 Land Remote Sensing Policy Act  Commercial operation of L4/5/6  NASA/DOD to build/operate Landsat 7  Landsat Program Management (LPM) Team 1993 Landsat 6 launch failure (ETM) 1994 LPM redefined (NASA/NOAA/USGS) 1999 L7 launched (ETM+) on April LPM redefined (NASA/USGS) 2000 L7 Flight operations assumed by USGS 2001 L4/L5 returned to Govt.; L4 decommissioned years of global L7 data acquisitions Landsat Program History Thematic Mapper (TM) Enhanced Thematic Mapper Plus (ETM+) Enhanced Thematic Mapper (ETM) Multi-Spectral Scanner (MSS)

Global mission Global archive Open data policy Govt. owned & operated Int. cooperators ETM+ 5 year mission Launched 4/15/99 Landsat 7 EO-1 LDCM Technology demo scenes Open data policy Govt. owned & operated Bridge mission ALI (ETM+ follow on) 1 year mission Launched 11/21/00 Global mission Global archive Open data policy Data buy Int. cooperators ALI+ (ALI follow on) 5 year mission + option Launch 2006 Landsat Evolution Landsat 5 Landsat 7 LDCM Projected end of Landsat 7 mission (2011) EO-1 Guesstimated end of Landsat 5 mission (2009)

Landsat Program Background The Landsat Program has continuously acquired synoptic images of the Earth’s land surfaces for 30 years DOI/USGS preserves this record in the National Satellite Land Remote Sensing Data Archive and distributes public-domain data to users worldwide Landsat Program vision:  Acquire multispectral imagery affording global, synoptic, repetitive coverage of the Earth's land surfaces at a scale where natural and human- induced changes can be detected, characterized, and monitored over time

Rodeo-Chediski Wildfires Landsat 7 June 21, 2002 Landsat 5 June 29, 2002 Landsat 7 July 7, 2002 These images show the Rodeo fire, which began on June 18th, and the Chediski fire which began on June 20th. When they merged together, the combined Rodeo-Chediski fire became the largest wildfire in Arizona history. Together these wildfires have destroyed over 468,000 acres in the Apache-Sitgreaves National Forest and Fort Apache reservation. 400 homes have been destroyed, and over 30,000 people have been evacuated. It has cost the state of Arizona more than $2 million a day, a total of over $32 million, to fight the Rodeo-Chediski fire. 10 km 10 miles

Landsat Program Background Land Remote Sensing Policy Act of 1992 (P.L ) Directs Landsat Program Management (NASA/DOI) to study Landsat 7 successor options that:  “adequately serve the civilian, national security, commercial, and foreign policy interests of the United States”  “maintain data continuity with the Landsat system”  “incorporate system enhancements…” Lists four study options:  Private sector funding and management  International consortium  U.S. Government funding and management  U.S. Government-private sector cooperative effort

Landsat Program Background Commercial Space Act of 1998 (P.L ) Addresses “Promotion of Commercial Space Opportunities” including commercialization of Space Station, acquisition of space science data and Earth science data, and commercial launch services Directs NASA and other Federal agencies to “…acquire, where cost-effective…remote sensing data, services, distribution, and applications from commercial provider.” Landsat Data Continuity Mission (LDCM) was conceived as a bridge to true Government “scientific data buys” in the future

LDCM Background In June 1999, NASA and the USGS released a request for information (RFI) to private industry regarding plans to acquire Landsat-like data Results:  No respondent considered the commercial market for 30m data sufficient for private funding of a Landsat 7 follow-on system  No respondent had plans to develop a system to acquire 30m data  Respondents favored Government procurement of 30m data from a privately-owned system  Innovative funding strategies were suggested

LDCM Strategy NASA and the USGS intend to procure LDCM data from a privately-owned and privately-operated remote sensing system NASA and the USGS are implementing a two-phase procurement process based on an LDCM Data Specification and Data Policy  Phase I: Formulation  “Study phase” for various technical and trade studies  Two bidders selected for funding: Digital Globe and Resource 21 (DG and R21)  Culminated in preliminary system design  Phase II: Implementation  Selection of LDCM contractor through new round of proposals  Final design, fabrication, launch, and checkout  On-orbit data delivery

Procurement Strategy The procurement DOES NOT  Specify spacecraft, instrument(s), ground system, or operational concepts or designs  Require Government oversight  Require the Government to “take title” to the system  Require the Government to operate the system The procurement DOES  Specify data and its delivery to the Government’s archives  Establish a policy for the distribution of LDCM data products  Specify March 2007 start date for 5 years of operational data delivery (plus 5-year option)  Require Government insight and data validation  Encourage commercial approaches for servicing the International Cooperator market  Facilitate sharing of cost, risk, and rewards in a Government- private sector cooperative effort

LDCM Data LDCM data are described by the LDCM Data Specification  Specifies the quantity and qualities of the LDCM data to be procured by the Government (radiometry, geometry, products, bands, resolution)  Specifies seasonal coverage of global land surfaces  16 day repeat coverage required for U.S.  250 global scenes per day (average) to an active archive at the USGS EROS Data Center Addition of a Coastal / Aerosol band (.443  m and 30m GSD) and Cirrus band (1.33  m or 1.88  m and 120m GSD) No Thermal Infrared bands included Unenhanced data products to be derived and distributed by the USGS from the LDCM data in the active archive

Landsat 7 vs. LDCM Band Comparison Wavelength in Micrometers (µm) Pan Band ( ) Sharpening ( ) Coastal ( ) Band 1 ( ) Blue ( ) Band 2 ( ) Green ( ) Band 3 ( ) Red ( ) Band 4 ( ) NIR ( ) Band 5 ( ) SWIR 1 ( ) Band 7 ( ) SWIR 2 ( ) Cirrus ( ) or ( ) Visible Light Band 6 (10.4 – 12.5) Landsat 7 LDCM

Draft Data Policy Similar to Landsat 7 data policy  Ensures non-discriminatory access to Level 1 data products derived from Government-procured LDCM data  No restrictions on the use, resale, distribution or sharing of LDCM data products  Timely delivery  Data product pricing is critical issue; striving towards $50/scene products Distribution of Level 0 data products may be restricted Protects LDCM contractor’s commercial rights to data exceeding quantity or specifications of the procured LDCM data. Government will not restrict:  Value-added products derived from LDCM data  Marketing of data acquired and generated in excess of Government data buy

“Native” Sensor Data (high resolution, extra commercial bands, etc.) Derived LDCM Data USGS/EDC LDCM Contractor End Users, Value Added Resellers, Int’l Cooperators Commercial and Value Added LDCM Products (All Rights Reserved) LDCM L1 Data Products (Public Domain: No Rights Reserved) All Sensor Data 250 Scenes Per Day LDCM Data Policy

DigitalGlobe Overview Business Approach  Complements existing QuickBird hi-res business l Wide-area coverage, frequent revisits & additional spectral bands  Augments QuickBird and SPOT in supporting world-wide agricultural market l Also supports environmental monitoring, disaster relief, etc. Space Segment Overview  “M5” system l 4 satellite constellation  Multispectral l 7.5m resolution – Off-nadir capability l 185km swath width  Constellation operational Q Team Syst e m Concept DigitalGlobe M5 Satellite Concept

Resource21 Overview Space Segment Overview  1 or more satellites  Multispectral l 5+ bands l 10m/20m resolution  International Cooperator support Team Mississippi CPF Fairbanks RGT Bangor RGT EDC Kent, WA BCCF System Concept Business Approach Central Processing Facility DEALER GROWER Complementary Markets (Government and other Customers) Multi- spectral Satellites Blue Green Red NIR SWIR Other Data Collection Data Download Information Products to Customers

Two Step Procurement Formulation Implementation RFP Digital Globe Implementation Contractor Resource 21 RFP TBD 3 rd Party ?

LDCM Schedule Formulation Phase Contracts Awarded March 2002 Preliminary Design Reviews Due November 2002 Implementation Phase RFP Release December 2002  Preceded by a draft release Oct Implementation Phase Proposals Due February 2003 Implementation Phase Award June 2003 Satellite Launch Late 2006 LDCM Data Delivery Begins March 2007

Summary LDCM is on schedule for a late 2006 launch Selected Resource21 and DigitalGlobe for Formulation Phase Reviewing Implementation Phase proposals For detailed information and reference documents, see:

U. S. Department of the Interior U. S. Geological Survey End of “Official” Presentation Now some questions……

What Does the Gov’t Want? Solicitation Objectives: 1. Implement a process to acquire Landsat compatible data and produce products required to meet the research and operational needs of the Government. 2. Reduce the Government’s cost and risk by partnering 3. Encourage the expansion of the remote sensing industry 4. Fulfill these objectives through the Government’s procurement from an Industry-owned system

Criteria (In decreasing importance:) Mission Suitability > Price > Past Performance The price factor is significantly less important that the combined importance of the Mission Suitability Factor and the Past Performance Factor. As individual Factors, the Price Factor is less important that the Mission Suitability Factor but more important than the Past Performance Factor.

Risks Upside:  Each side “shares” risk?  Contractor can get insurance, i.e. risk mitigation for both sides? Downsides  Now gov’t has to deal with business risk – not just technical risk  (Will the company be there?)

The “Hard Questions” Is it “Continuity”?  Missing/changed/added spectral bands  Perhaps it is “continuity”, although not perfect “fidelity” Can both sides benefit?  Will gov’t (i.e. constituents) get all the data wanted?  Will Business still have profit potential?  How closely can they work together?

The International Scene Landsat has a

The International Scene Landsat has a huge network of International Cooperators (ICs) A long-lived partnership in space since 1972! LDCM very noncommittal on ICs  Will gov’t abandon this long-running international relations coup?  Will industry support it?

Is There a Market? Market has never been there for 30m data, still not there.  But that’s what the gov’t wants Both formulation phase vendors proposed significant technological advances to improve data marketability.  Those technical advances increase complexity, add technical challenges, increase costs and raise risks.

The Big Question: Will the Landsat Mission ever find a home?  Or will it forever be a “nomad” mission?

Answers? USGS Director and NASA Administrator for Earth Science to meet soon  (Delayed by Isabela) Decision coming soon? Stay tuned….

Questions?