Presentation to CEDA 20 February 2006 Bruce Hughes Chief Executive Officer Connex Melbourne Pty Ltd.

Slides:



Advertisements
Similar presentations
Mark Wild, Chief Executive Officer Public Transport Victoria
Advertisements

4 May 2011 Metropolitan Transport Forum Clement Michel – Chief Operating Officer.
NetPlan – A Practitioner’s Experience
1 Delivering Through Partnerships Stephen Rhodes Passenger Services Director EMTA General Meeting 10 th November 2011.
MUNI Operations Overview and Recent Innovations Julie Kirschbaum San Francisco Municipal Transportation Agency, Operations Planning and Scheduling Manager.
Creating connected and liveable cities: The Route 96 Project.
May 3, Northern line upgrade Merton Public Transport Liaison Committee Meeting 26 October 2010.
Metro Today, Main Line Tomorrow Malcolm Dobell, Head of Train Systems Kate Whelan, Lead Systems Performance Engineer SUP ATC.
Penn Station Metro-Hub A Short Term Action Plan Prepared by Regional Rail Working Group Empire State Passengers Association Committee for Better Transit.
1 NAT accessibilité  New rolling stock in Ile de France  Regional Structuring Bus Network RIR  Extended provision: night services  New services tramway.
Materials developed by K. Watkins, J. LaMondia and C. Brakewood Rail Capacity Unit 3: Measuring & Maximizing Capacity.
Metro Vision 2035 Regional Growth Scenarios. Scenario Workshop.
 PRASA’s Strategy identified short, medium and long-term interventions to improve rail services in the country.  PRASA identified operational interventions.
Greener, cheaper, better Yes we can! Janet Rice Executive Officer, Sustainable Melbourne Alliance for Transport and Urbanism Former Councillor and Mayor,
VIRGINIA RAILWAY EXPRESS SYSTEM PLAN 2040
Investigating Traffic in Glasgow
M IAMI F ORT L AUDERDALE W EST P ALM B EACH O RLANDO Addresses Florida’s demand for express, intercity rail travel. Is designed to serve tourists, business.
BART Briefing for Mayor’s Transportation 2030 Task Force April 30, 2013.
Infrastrucure presentation VZNERRAC PLENARY 11 Railway Infrastructure for the Twenty First Century John Amoore Network Rail and ERRAC.
Paul Roberts – TIF Technical Manager Presentation to the TPS – 3 June 2009.
HSL Helsinki Region Transport Local Rail Projects in Finland Arttu Kuukankorpi Head of Route Network and Timetable Planning Group.
Key Transport Policy Issues for 2010 Stephen Clark Deputy Clerk to the Authority 18 January 2010.
TeNeT Group1IRSTE Seminar Information and Communication Technology (ICT) and Indian Railways Ashok Jhunjhunwala, TeNeT group, IIT Madras
Orange County Business Council Infrastructure Committee December 14, 2010 Draft Long-Range Transportation Plan Destination 2035.
RAIL TRANSPORT SEMINAR: RAILWAY INFRASTRUCTURE – KEY TO ACHIEVE SUSTAINABLE TRANSPORT Operation on the Bulgarian railway market – current situation and.
2012 On track for more!. Ministry of Transport and Communications Avinor AS (airports) Public Road Administration Norwegian Coastal Administration Train.
Action for business, by business Action For Business – Tameside Friday 30 th November 2012.
Transit Service Detours during Confederation Line Construction Transit Commission December 9, 2013.
Olympic Transportation Planning For London 2012 A Peak Flow And Modal Share Analysis For Rail Usage At The Stratford Regional Station.
Arriva in Southend Kevin Hawkins Commercial Director.
TRANSPORT The Cambridge Futures response to the Draft Structure Plan Dr Tony Hargreaves, Cambridge Futures.
0 Christopher A. Pangilinan, P.E. Special Assistant to the Deputy Administrator Research and Innovative Technology Administration, ITS Joint Program Office.
DRAFT What If… The Washington Region Grew Differently? Public Forum on Alternative Transportation and Land-Use Scenarios National Capital Region.
West Anglia Rail Services Hertfordshire County Council Scrutiny Panel 20 May 2010 Geraint Hughes Stakeholder Manager.
Special Event Transport Operational Perspectives November 2013.
Metro’s Capital Improvement Needs Presented to the National Capital Region Transportation Planning Board By Tom Harrington, Director of Long Range Planning.
Transport Update Chris Carter Transport Strategy Manager.
Gauteng Strategic Plan Update Public Transport GDS 2055 Summit Hishaam Emeran, General Manager: Strategic Network Planning 7 September 2012.
1. Variety of modes (types) of transport (public and private) 2. Density of transport networks more nodes and.
First Capital Connect London Borough of Merton Public Transport Liaison Committee Tuesday 26 October 2010.
1 Transit Capacity Constraint Presented to: TPB Technical Committee April 1, 2005 Lora Byala Washington Metropolitan Area Transit Authority Office of Business.
IPART’s review of CityRail’s regulatory framework – stakeholder roundtable 31 July 2008.
Mind the Gap – Human Factors and the Platform Train Interface
Overview Presentation Fall 2015 Gainesville-Haymarket Extension Study.
Express/Rapid Bus Opportunities for Priority Bus Transit in the Washington Region Sponsored by National Capital Region Transportation Planning Board Chun.
Briefing for Transportation Finance Panel Nov 23, 2015 Economic Analysis Reports: 1.I-84 Viaduct in Hartford 2.I-84/Rt8 Mixmaster in Waterbury 3.New Haven.
12/08/ J/ESD.204J1 Real-Time Control Strategies for Rail Transit Outline: Problem Description and Motivation Model Formulation Model Application.
2015 Urban Mobility Scorecard Tim Lomax Texas A&M Transportation Institute Austin Chamber of Commerce December 2015.
Gridlock? – Transport in 2030 Solving Congestion in South East England 14 th November, 2007 Adrian Shooter Chairman, ATOC.
SARCC Budget and Strategic Plan 2007/08 Portfolio Committee on Transport 28 February 2007 Presented by SARCC CEO: TL Montana.
Capital Plan Update FMCB Meeting February 26, 2016 Pre-Decisional – Draft for discussion only.
High Speed Rail Opportunities for the West Midlands Geoff Inskip Chief Executive Centro.
GRTC Bus Rapid Transit Project July 17, Agenda 1.BRT Concept 2.Project Goals 3.Project Benefits 4.Project Corridor 5.Proposed Multimodal Access.
Analysing the Case for Change Joe Lennard | Digital Railway Funding Lead Suppliers’ Summer Conference 15/07/2015.
How to Keep a City Moving During: a. Planned Disruption b. Unprecedented Pressure c. The Inevitable!
Metrô Rio & SuperVia March Location BRASIL Rio de Janeiro Rio Rio de Janeiro Metropolitan Region - Population: 11,6 million - Counties: %
Industry Briefing 25 May 2016.
Transit Technology Hampton Roads Transit. Hampton Roads Transit (HRT) provides public transportation for six cities in the South Hampton Roads region:
Chapter 12: Urban Transportation Policy “Everything in life is somewhere else, and you get there in a car.” E. B. White, One Man’s Meat, (NY: Harper &
Australian Road Federation November Meeting Our Transport Challenges (MOTC) Meeting Our Transport Challenges (MOTC) sets out a strategic, long term.
Mark Wild, Chief Executive Officer Public Transport Victoria
Train Performance Challenges
Improving the Cardiff and Valley Railway
Creating connected and liveable cities: The Route 96 Project
Mark Wild, Chief Executive Officer Public Transport Victoria
Creating connected and liveable cities: The Route 96 Project
Red and Orange Future Reliability
New Public Transport Infrastructure
GEML SOBC GEML Rail Conference July 2019
Great Eastern Mainline
Presentation transcript:

Presentation to CEDA 20 February 2006 Bruce Hughes Chief Executive Officer Connex Melbourne Pty Ltd

First The Good News!

But Services have not kept pace The Age – 4 January 2006

Why? There have been no expansions to metropolitan track capacity since the completion of the City loop in the mid 1980’s. Extra peak services have been added over the past 20 years and virtually all of the spare capacity has been used up in key corridors. We will add some more services on the most congested lines in 2006, but that’s it, until something changes.

And not only that: Overloading causes: Increased dwell times at stations, adding to late running Poor comfort levels Low customer satisfaction, and Constrained patronage growth! Running the system close to capacity also means that there are significant “ripple effects” when disruptions occur. In effect, one late or cancelled train can cause many other trains to be late. Punctuality has dropped from 97% to 93% over past 3 years

So what is Capacity? Rail capacity is a function of: Infrastructure (i.e. signalling, track, stations, platforms, junctions etc); Operating strategies, including the mix of stopping and express services Resources, specifically rolling stock and drivers; Limited track infrastructure is now having a severe and continuous impact on service quality on a number of lines. Two generic problems are: Single track sections Double track combined with express services

Single Track Sections The Road Analogy

Single Track Sections The Rail Analogy

Single Track Sections The maximum frequency (trains per hour) is constrained in each direction. Tight schedules cause cascading delays. Scheduling is constrained for the other lines as well. 7 of Melbourne’s 15 electrified train lines still have single track sections, and a further 3 lines have single track terminals.

Double Track with Expresses Express services are valued by patrons Many metro services in the longer corridors have traditionally run express, as well as all of the Regional services which share metropolitan tracks (from Geelong, Ballarat, Bendigo, Seymour, Latrobe Valley). In some corridors, this service mix now uses all of the available track capacity in the peak direction. Extra trains could be fitted in if the express services were scheduled to run as slow as the stoppers. The only workable solution is a third track.

So we urgently need… Triplication from Dandenong to Caulfield Triplication from Sunshine to Footscray Triplication from Blackburn to Box Hill, in combination with the grade separation of the level crossing at Middleborough Road Duplication of the most critical single line sections, particularly on the Hurstbridge and Epping lines. Upgraded and modernised signalling on key corridors and the City Loop Extra platforms at Sandringham and Pakenham, as well as an improved terminal at Werribee As well as modern train control and communication systems.

City Loop Four tunnels, three full in peaks and the other constrained by the junction at Jolimont Signalling works and dwell time management can add a few pathways each hour for the loop tunnels Flinders Street Station also needs to be reworked to add platform capacity Jolimont can be solved, with operational changes or trackwork Loop will still be a constraint – over time, extra services will need to “run direct” to FSS.

Train Fleet The train fleet can cater for needs over the next three years. A crucial step over the next two years is to develop a tender for new state-of-the–art trains. The aim of this tender should be firstly extra trains and secondly the replacement of the aging Comeng trains. Stabling and depot capacity will need to be expanded, in tandem with increases in the size of the fleet

Extensions Extension of electrification is a good idea, as demonstrated by Cranbourne, Sydenham and (soon) Craigieburn But, adding extensions to a system that can’t cope simply makes matters worse because: More passengers on congested trains More shared track with expresses Less reliability due to above Expansion of the electrified train system should proceed after bottlenecks on the existing system are removed.

Commonwealth Games Travel Demand Free travel on public transport for ticket holders Games sport events  1.7 million spectators Free cultural program > ½ million people School holidays helps a little Connex is the primary public transport carrier: Connex50% Yarra Trams15% V/Line Passenger3% Bus2%

Commonwealth Games Rail Services More train services around the clock All trains to & from CBD to be six carriages all day Third peak every night Extended hours of operation on all nights – up to 1.30am for Opening and Closing Ceremonies

Games Readiness Games timetable scheduled – 6 months of extensive work, every train trip planned with a pathway Games Projects done or nearing completion – Eg. Jolimont & Richmond stations, graffiti clean-up Additional internal and external resources secured Games rosters completed Extra trains due to accelerated delivery of Siemens Altered maintenance regimes – before & during Games Security preparations - eg Trident

Games Challenges Maintaining high capacity over 12 days, around the clock Managing network disruptions during Games, such as level crossing incidents Extra busy times on weekdays - MCG Morning Event passengers coincide with AM Peak commuters Substantial evening movement of people (a third Peak) Getting the system up and ready by 4am each day Moderating public expectations – extra delays and crowding are inevitable Recovery after Games - continuing current service after the Games, when everything and everyone is fatigued

What does the Games Tell Us? When transport demand increases for the central area, extra use of rail is the only viable option. Existing infrastructure and fleet numbers constrain our existing options: Peak capacity is limited Off-peak frequencies are limited in many corridors due to single line sections Unfortunately, “pushing the envelope” with the existing system will lead to extra unreliability and delays. Melbournians may accept high crowding levels during big events (but probably not every weekday!)