LAr1-ND Cryogenics Concept David Montanari Neutrino Cryogenics Requirements Meeting 24 September 2014.

Slides:



Advertisements
Similar presentations
LAPD Run 2 Results and Notes Terry Tope
Advertisements

Basic Refrigeration Cycle
TPC Proposal for the 35 Ton Liquid Argon Test Abstract We propose to equip the 35 ton cryostat with one APA and two CPA’s, and all the necessary equipment.
LBNF Test Cryostat Requirements David Montanari / Jack Fowler Jan 29, 2015 Rev. 11.
LBNE 35 ton prototype Phase 1 summary Terry Tope Fermi National Accelerator Laboratory All Experimenters’ Meeting – Fermilab – May 19, 2014.
Cryogenic discussion and update 30 October 2014Neutrino platform.
Materials Qualification for long drift Liquid Argon TPC Effect of water on electron drift lifetime Plans Material Tests, purging and H20 studies, Purity.
Comments about Extrapolation to LBN(E) Barry Norris September 25, 2014 Barry Norris, Cryogenic Meeting at CERN September 2014.
LAr1-ND Conceptual Design Review of Status June 25 Craig Thorn.
LAr1-ND David Montanari Fermi National Accelerator Laboratory CERN – Feb 16, 2014.
Some Work on Liquid Argon Purity at Fermilab f 6/9/2011 S. Pordes TIPP 1.
Fcal upgrade for sLHC: Cryogenics modifications – TE-CRG/ C.Fabre 1 ATLAS FCal Upgrade for sLHC: Modifications to the Calorimeter Cryogenic.
LBNE Reconfiguration Workshop – April 2012 FD Assumptions and Cost Estimate 1 Bruce Baller.
LARP LQX and MQX Magnets Cryogenic Testing at Fermilab’s Industrial Building 1 Roger Rabehl Technical Division/Test & Instrumentation Department.
4/5/2005FLARE Cryogenics, RLSchmitt1 Argon Refrigeration Supply Purity.
Utilities 14 October 2008 Martin Nordby, Gordon Bowden.
Neutrino Cryogenics Requirements Meeting Overall Summary of Our Discussions Barry Norris (Fermilab) / Johan Bremer (CERN) Neutrino Short Baseline Meeting.
Some Work on Liquid Argon Purity at Fermilab f 6/9/2011 S. Pordes TIPP 1.
LAr1-ND Cryostat proposal David Montanari Neutrino Cryogenics Requirements Meeting 24 September 2014.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Roberto Than CRYOGENICS SYSTEM.
Cryo AIP Muon Campus AIP Review Arkadiy Klebaner January 23, 2012.
Hydrogen system R&D. R&D programme – general points Hydrogen absorber system incorporates 2 novel aspects Hydrogen storage using a hydride bed Hydrogen.
Single Phase Test at CERN Cryostat/Cryogenics Update
Materials Qualification for long drift Liquid Argon TPC Effect of water on electron drift lifetime Plans S. Pordes Argon Purity1Integrated R & D Plan Review.
WA104 Cryogenics Design Status David Montanari / Johan Bremer May 21, 2015 Rev. 1.
Poster Design & Printing by Genigraphics ® Neutrino Interactions Studying the properties of neutrinos will shed light on the origin of the.
CMS FPIX Cooling System Studies Joe Howell, Fermilab for the FPIX Upgrade Mechanical Working Group CMS Upgrade Workshop April 27,
Materials Qualification for long drift Liquid Argon TPC Effect of water on electron drift lifetime Plans Material Tests, purging and H20 studies, Purity.
EHN1 Cryogenic Integration Requirements David Montanari / Johan Bremer Jun 18, 2015 Rev. 1.
LAr1 Plans at FNAL Bruce Baller - Fermilab. Outline LAGUNA Meeting - Mar  LBNE LAr detector overview  Prototyping plan  1 kton prototype.
Johan Bremer, 22th-26th September 2008 Cryogenics Operations 2008, CERN, Geneva, Switzerland 1 CRYOGENICS OPERATIONS 2008 Organized by CERN Safety aspects.
SC Project Review of NCSX, April 8-10, 2008 NCSX Cryogenics Systems WBS-62 Steve Raftopoulos NCSX Cryogenic Systems WBS(62) Manager.
9/17/07IRENG071 Cryogenic System for the ILC IR Magnets QD0 and QF1 K. C. Wu - BNL.
Neutrino Cryogenics Requirements Meeting 25/09/2014 Day 1 review.
Process Definition of the Operation Modes for Super-FRS Magnet Testing CSCY - CrYogenic department in Common System, GSI, Darmstadt Y. Xiang, F. Wamers.
Mike Struik / LHC-CRI INSTRUMENTATION FEEDTHROUGH SYSTEM FOR LHC MACHINE ARC QUADRUPOLE MAGNETS. 123rd LHC Vacuum Design Meeting 19 April 1999.
Installation of the T600 at Fermilab CSN2, September 22,
1/26/2009 S. Pordes LAr R & D Briefing 1 Liquid Argon presents prospect of continuously live Imaging Calorimeter C. Rubbia.
Cryogenics Fabrication Plans & Constraints David Montanari (on behalf of the CERN Neutrino Cryogenic Group) ProtoDUNEs Meeting Feb 23, 2016.
Long-Baseline Neutrino Facility LBNF Cryostats Systems Requirements on FSCF Marzio Nessi LBNF/DUNE DOE/SC CD-3a Director’s Review October 27-29, 2015.
Materials Qualification for long drift Liquid Argon TPC Effect of water on electron drift lifetime Plans Material Tests, purging and H20 studies, Purity.
Cryogenic scheme, pipes and valves dimensions U.Wagner CERN TE-CRG.
35ton and LAPD cryostats and future DUNE detector development.
PIP-II Cryogenics Arkadiy Klebaner and Jay Theilacker PIP-II Collaboration Meeting 9 November 2015.
8/29/07K. C. Wu - Brookhaven National Lab1 Major Components in ILC IR Hall Interchangeable Detectors.
CW Cryomodules for Project X Yuriy Orlov, Tom Nicol, and Tom Peterson Cryomodules for Project X, 14 June 2013Page 1.
SBN Near Detector Building Conventional Facilities Update Steve Dixon LAr1-ND Collaboration Meeting 16 September 2014.
TRD Gas System Layouts Production Readiness Review 03 – Nov F. Hahn.
35 Ton LAr Impurity Distribution Measurements and CFD simulation Erik Voirin – Fermilab – Thermal and Fluids Engineering Group / Engineering.
AT-ECR/C.FabreMay 31, 2007 Cryogenics for Liquid Argon Calorimeters Caroline Fabre on behalf of the ATLAS Liquid Argon Cryogenics Collaboration.
Cryogenics for SuperB IR Magnets J. G. Weisend II SLAC National Accelerator Lab.
1 Cary Kendziora Fermi National Laboratory Cary Kendziora Fermi National Laboratory CEC-ICMC 2013 Anchorage Alaska – June, 2012.
Installation of the T600 at Fermilab Fermilab, February 15,
Neutrino Platform Proximity Cryogenics Functional Design M.Chalifour 14/04/2016 M. Chalifour - TE/CRG-CI 2.
ProtoDUNEs Interface documents (NP-02, NP-04) David Montanari (on behalf of Redouan A, Mark A, Johan B, Michel C, Joaquim C, Aurelien D, Kevin H) Apr 14,
WA105 6x6x6 Cryogenics David Montanari / Johan Bremer Sep 21, 2015 Rev. 1.
ProtoDUNE Single Phase (NP-04) P&ID David Montanari (on behalf of Mark A, Johan B, Michel C, Joaquim C, Kevin H) CERN Neutrino Platform General Meeting.
WBS 1-7 System Assembly & Installation John Voirin August 10-11, 2011.
SBND Cryostat Requirements David Montanari, Michael Geynisman, Dimitar Mladenov, Joe Howell 14 October 2015.
Installation of the T600 at Fermilab
Overview of the Long-Baseline Neutrino Facility Cryogenic System
Design of the thermosiphon Test Facilities 2nd Thermosiphon Workshop
IT-4189 Supply and installation of a cryogenic distribution system
Proximity Cryogenics P&IDs Meeting
protoDUNE – single-phase Instrumentation - Gas Analyzers
Proximity Cryogenics P&IDs meeting
Instrumentation Used in LAPD and 35T Runs (Dune DocDB 1759)
David Montanari / Johan Bremer Jun 11, 2015 Rev. 1
Warm structure requirements :
CRYOGENICS OPERATIONS 2008 Organized by CERN
Presentation transcript:

LAr1-ND Cryogenics Concept David Montanari Neutrino Cryogenics Requirements Meeting 24 September 2014

Outline Introduction Building layout Requirements Current concept Outstanding issues Design choices Summary Sep 24, 2014David Montanari | LAr1-ND Cryogenics Concept2

Introduction The Short-Baseline Neutrino Program (SBN) at Fermilab will study neutrino properties using a combination of detectors: –existing MicroBooNE –new LAr1-ND (Near Detector) –a refurbished ICARUS T600 (Far Detector) These slides describe the current thoughts on the cryogenic system for the LAr1-ND detector. The base design is a membrane cryostat of 129 m 3 (LAr volume) or 180 ton LAr Mass. The cryostat will be housed in a new dedicated building next to the SciBooNE enclosure, where the cryogenic system will be located. The two buildings will be connected with a tunnel through which interconnecting lines will connect the cryostat to the cryogenic system. Sep 24, 2014David Montanari | LAr1-ND Cryogenics Concept3 Note: it may be possible to increase the sensitivity by increasing the LAr volume. We have looked into extending the width to 5.75 m (from 4.4 m), that is 168 m 3 LAr volume. This will allow the insertion of two (2) 2.5 m wide APAs instead of one (1) 3.65 m wide.

Layout for LAr1-ND similar to the LBNE 35 ton prototype 4 LAr/GAr transfer lines Process piping North LAPD LBNE 35 ton Cryostat LAPD/LBNE LAr purification/filtration system LAr/GAr transfer lines Process piping vol change/day David Montanari | LAr1-ND Cryogenics ConceptSep 24, 2014 This is the 3D model of PC-4 with the LBNE 35 ton and LAPD. We plan to do the same with LAr1-ND and the cryogenic system.

Near Detector Building – Plan view at detector level Sep 24, 2014David Montanari | LAr1-ND Cryogenics Concept5 Wetland Delineation – June 2014 From S. Dixon, Sep 16,2014 Cryogenic System for detector Cryostat

Near Detector Building – Section view Sep 24, 2014David Montanari | LAr1-ND Cryogenics Concept6 From S. Dixon, Sep 16,2014 Cryogenic System for detector Cryostat

ParameterValue LAr purity in cryostat3 ms electron lifetime (100 ppt O2 equivalent) GAr Piston purge rate of rise1.2 m/hr Membrane cool-down rateFrom manufacturer (most likely < K/hr) TPCs cool-down rate < 40 K/hr < 10 K/m (vertically) Mechanical load on TPC The LAr or the gas jet pressure shall not apply a mechanical load to the TPC greater than 200 Pascal. Nominal LAr purification flow rate (filling/ops)1 volume change/day All surfaces in the ullage during operations< 100 K Convective currents inside cryostat< 10 cm/s GAr purge within insulation 1 volume change/day of the open space between insulation panels Lifetime of the cryogenic system10 years (5 years of run + 5 years potential upgrade) 7 Portable system(s) lowered through the top in the SciBooNE hall, with quick connections to/from the cryostat. Scalable system(s) to be used for future larger detectors. Cryogenic and GAr/LAr purification systems to LBN design (where possible). Sep 24, 2014David Montanari | LAr1-ND Cryogenics Concept Cryogenic system requirements

Parameter (SciBooNE)Value Available footprint4.9 m x 5.1 m (To be verified) Available height11.5 m (two catwalks at intermediate levels) AccessibilityAccess from the top through the roof Lifting equipmentJib crane Connection to cryostat buildingUnderground tunnel 8Sep 24, 2014David Montanari | LAr1-ND Cryogenics Concept Space constraints See picture and drawing in next slide.

9Sep 24, 2014David Montanari | LAr1-ND Cryogenics Concept SciBooNE 8,534 mm 3,048 mm 4,900 mm

ParameterValue LAr purification flow rate (filling/ops)1 volume change/day: 5.4 m 3 /hr = 24 gpm (129 m 3 ) Cooling power Cool-down: 14 kW (129 m 3 ) Operations: 2.2 kw (129 m 3 ) + TBD 10 Portable system(s) lowered through the top in the SciBooNE hall, with quick connections to/from the cryostat. Scalable system(s) to be used for future larger detectors. Cryogenic and GAr/LAr purification systems to LBN design (where possible). LN2 refrigeration based on LBN design is not cost effective. Sep 24, 2014David Montanari | LAr1-ND Cryogenics Concept Cryogenic system current design parameters

LAr1-ND PFD of LAr systems (based on 35 ton) Sep 24, 2014David Montanari | LAr1-ND Cryogenics Concept11 This is the PFD of the LAr system of LAr1-ND based on the 35 ton concept (but with an external LAr pump and a system to spray clean LAr/GAr on the top to keep the ullage cold, ≤ 100 K). Assumption: 129 m 3 tank (base option).

This is the PFD of the LN2 system of LAr1-ND based on the 35 ton concept and CERN initial idea as presented by Johan Bremer on Jun 18, Assumption: 129 m 3 tank (base option). LAr1-ND PFD of LN2 system (based on 35 ton and Johan B) Sep 24, 2014David Montanari | LAr1-ND Cryogenics Concept12

m m 3 Sep 24, 2014David Montanari | LAr1-ND Cryogenics Concept Cryogenic LAr filter for LAr1-ND Conceptual (from Mark A.) Old option

Purification/Filtration system needs Gas purge/recirculation: GAr purification during initial cleaning. Filling: LAr purification. Operations: LAr + GAr boil off purification. GAr purge inside the insulation. LN2 tanker delivery to onsite LN2 dewar (10,000 gal available from D0): –Five (5) year usage based on estimated heat leak. LN2 Refrigerator based on LBN cycle NOT cost effective: –Estimated Cost of LN2 plant (Design, Procure, Install). –Power + GN2 costs. Sep 24, 2014David Montanari | LAr1-ND Cryogenics Concept14

Cryogenic system capabilities – 1 To purify the LAr (filling and operations). To re-condense and purify the boil off gas. –LAr condenser and LN2 phase separator. –LAr circulation pump to send LAr to purification system To handle the LAr/GAr and LN2/GN2 flows: Initial cleaning  GAr purging and venting, GAr recirculation and purification. Ops  cool down, LAr filling, GAr boil off purification and re-condensation, LAr purification, LAr return to the tank. Make-up GAr. To maintain the top of the cryostat at ≤ 100 K. To monitor and control internal and external pressure: Pressure Control / Vacuum Protection PSV, VSV, Auto/Manual venting. To handle the GAr purge inside the insulation. Instrumentation and diagnostics: T and P sensors, flow meters, liquid level sensors, etc., analytical instruments to measure the contamination, in-line Purity Monitors (??), etc. Sep 24, 2014David Montanari | LAr1-ND Cryogenics Concept15

Cryogenic system capabilities – 2 To sample GAr from the ullage and measure the concentration of contaminants. Control system. Flexibility: new features may be tested (cold roof, LAr external pump). To the extent possible, it is desired to have a flexible system where we can turn on/off the various features for comparison. Sep 24, 2014David Montanari | LAr1-ND Cryogenics Concept16

Current list of penetrations through the top of the cryostat Sep 24, 2014David Montanari | LAr1-ND Cryogenics Concept17 Liquid level probe(s). LAr Out (to LAr pump through the side of the tank) LAr In (from pump discharge through purification system) Cool-down ports (depending on cool down method) GAr purge inlet GAr purge outlet GAr to condenser and vent valves Low P make-up GAr PSV VSV LAr cool-down T sensors T sensors Feedthrough Miscellaneous Feedthrough (LED lights, etc.) TPC Signal Feedthroughs (warm or cold ??) TPC HV feedthroughs (on center of cryostat) Photon detectors Calibration(s) Purity Monitor(s)? Glass window view port ?? Sampling ports LN2/GN2 heat exchanger ports Instrumentation & Diagnostics ?? Spare ports

Outstanding issues Portability/Scalability: studies on portability and how to design a portable/scalable system that can serve present and future generation detectors of any size. Studies on LN2 system design to be common (to the extent possible) to T600 (FD). Will be different than that of larger systems because of cost of LN2 refrigeration. Studies on how to keep all surfaces at a Temperature lower than 100 K. Studies on how to minimize noise in the vicinity of the wires (may also be coming from piping layout). LAr Pump (Outside): –Need to see how to isolate the pump electrically and mechanically from the TPC. Issues with electronic noise and microphonics. –Check grounding scheme. Ability to make modifications after run for 5 years –Access the tank. Sep 24, 2014David Montanari | LAr1-ND Cryogenics Concept18

Design choices Which LAr filtration system ?? –Molecular sieve + Copper beds. –ICARUS style. Which LAr condenser ?? –Ar in tube and LN2 in shell –Ar in shell and LN2 in tube Which interface with cryostat ?? –Bayonet fittings. –Flanged connections. –Where is the boundary. Process controls strategy. Sep 24, 2014David Montanari | LAr1-ND Cryogenics Concept19

Summary Preliminary thinking has been done on the layout of LAr1-ND cryogenic system for the base design (129 m 3 cryostat). A larger cryostat (231 m 3 ) was analyzed and discarded for cost considerations. The 168 m 3 version is a recent proposal and has not been analyzed yet from the cryogenic system standpoint. The purification flow rate and cooling power will slightly increase. Cryogenically the system ‘feels like’ the 35 ton system at Fermilab’s PC-4 but placed in separate facility. The requirements for the cryogenic system have been developed and are being finalized. LAr cryogenic system is thought to be a scaled-up version of that of 35 ton/LAPD. Sep 24, 2014David Montanari | LAr1-ND Cryogenics Concept20

Closing remark Fundamentally there are no foreseen issues related to increasing the cryostat size. There are increased costs for the cryogenic system (as well as the cryostat). They will scale with heat leak and the purification flow rate (and the cryostat surface). The design issues which is key: 1) How do we keep the surfaces of the ullage at T ≤ 100 K ? Sep 24, 2014David Montanari | LAr1-ND Cryogenics Concept21

Thanks! David Montanari Neutrino Cryogenics Requirements Meeting 24 September 2014

Backup Sep 24, 2014David Montanari | LAr1-ND Cryogenics Concept23

Current schedule The goal is to have the detector ready for commissioning in the fall of 2017 and to take beam data in Apr From the proposal submitted to the PAC in Jul 2014: Sep 24, 2014David Montanari | LAr1-ND Cryogenics Concept24 MilestoneDate Cryogenic plant proposal submitted for peer reviewMar 2015 LAr1-ND technical proposal submitted for peer reviewMar 2015 Cryogenics procurement plans released and activeSep 2015 Start cryogenic plant commissioningAug 2017 Start detectors cooling and commissioningNov 2017 Start data taking with beamApr 2018

25Sep 24, 2014David Montanari | LAr1-ND Cryogenics Concept LN2 refrigeration conceptual (From Mark A.)