Joe Mercer Operations Planning Engineer III Operation Planning Analysis PHAAUG Meeting Mar 12 th, 2015.

Slides:



Advertisements
Similar presentations
Interchange Distribution Calculator Working Group (IDCWG) Update IDCWG October 12 th, 2011.
Advertisements

WECC Board of Directors April 21-23, 2004 Seattle, Washington WECC Procedure for Reporting of System Events Disturbance Reports Rod Maslowski OC Vice Chairperson.
Want to be a Path Operator?. No true definition of Path Operator in Reliability requirements, responsible entities listed are RC, TOP, TO, BA, GO, GOP,
POTF Status update.
Little Used, but Powerful Features with GP Cathy Fregelette, CPA, PMP Practice Manager BroadPoint Technologies September 20, 2012.
Brett Wangen, Director of Engineering WECC RC Update to PCC Planning Coordination Committee Meeting October 24, 2013.
Phase II – Analyze the Identified Issues from Perspectives of Alternative Approaches Determine which of the identified issues remain under alternate approaches.
January TSS J. Gronquist, S. Kincic
Goshen Area Bus Reconfiguration
Driver Hours of Service Logs & Vehicle Inspections Tools For Any Driver Safety and Compliance Fleet Management.
Enhanced Curtailment Calculator (ECC) Jeremy West Sr. Operations Engineer.
Reliability Software1 Reliability Software Minimum requirements & Best practices Frank Macedo - FERC Technical Conference July 14, 2004.
CCMDB 7.2.
5/29/2007SE TSP Launch1 Team Software Project (TSP) May 29, 2007 Launch/Strategy Team Formation.
NERC Lessons Learned Summary
Supervisory Systems.
Office of Project Management Metrics Report Presentation
Transmission Customer Meeting May 28, :00 – 10:00 Lake Natoma Inn 1.
Determine Facility Ratings, SOLs and Transfer Capabilities Paul Johnson Chair of the Determine Facility Ratings Standard Drafting Team An Overview of the.
NERC PER-005 Overview May 10, Who, What, When, Where, Why WHO: RC, TOP, BA WHAT: –R1: Systematic Approach to Training –R2: Verify operator capabilities.
Jay Britton
Recommendations from 2011 Southwest Outage Heather Polzin, FERC Office of Enforcement Dave Nevius, Senior Vice President, NERC Member Representatives Committee.
9/14/2015 IEEE Presentation Time-Based Management of Large Scale Network Models John Moseley P.E. Lead Network Model Engineer.
Dec 01, 2008 Texas Nodal Market Implementation Nodal System Operations Test Environment (SOTE) SOTE Launch WebEx.
Creating a Web Site to Gather Data and Conduct Research.
Copyright © 2007, Oracle. All rights reserved. Managing Concurrent Requests.
Peak RCCo Performance Metrics Draft –November 2013.
Sam Houston State University's IR Office Organization System.
Federal Aviation Administration NOTAM MANAGER OVERVIEW Lockheed Martin Proprietary Information Proprietary information owned by Lockheed Martin, such as.
1Texas Nodal Texas Nodal Market Trials and Data Verification ROS Meeting By Steve Grendel, ERCOT Thursday, 01/11/2007.
Lead from the front Texas Nodal 1 Texas Nodal Energy Management System Requirement Documents December 5, 2006 Jay Dondeti EMS Project.
EDS 2 Early Delivery Systems Review and Request for Approval May 2007 John Webb.
Application and Implementation of State Estimator at Idaho Power Company S. Kincic and M. Papic.
Texas Nodal 1 Nodal Operations Model Posting Confirmation TAC May 7, 2009 Matt Mereness, ERCOT.
NetNumen T31 Common Operations. Objectives Master Basic Configurations of T31 Master Common Operations of T31.
CRR Model Building Process Bradley Bell CRR Engineer.
© Property of ERCOT /17/20041 RTCA, CAM, and SFT Presented by: John Adams November 17, 2004.
2013 Wind Conference. Congestion Management & Communication Processes CJ Brown.
Network Model Management System (NMMS)
Loss of EMS Events 2015 System Operator Seminar. Training Objectives 2 System Operators will be able to identify the ERO Event Analysis Process Category.
DEX 7 – Operational Feedback Business Need Introduction This exchange enables the transmission of information on the condition and usage of a supported.
© 2007 by Prentice Hall2-1 Introduction to Oracle 10g Chapter 2 Overview of SQL and SQL*Plus James Perry and Gerald Post.
Loss of EMS Events 2015 System Operator Seminar. Training Objectives 2 System Operators will be able to identify the ERO Event Analysis Process Category.
Current Operational Challenges Computing the West – North Limits Potential IROLs Local Voltage & Thermal issue (OOME) High Voltage Outages.
RAWG Agenda Item LAR Data WECC Staff. Data Elements Generator information – Existing – Changes Monthly Peak Demand and Energy (actual year and.
January 14, 2016 PacifiCorp-CAISO-NVE EIM Initiative Overview.
Texas Nodal 1 Nodal Operations Model Posting NATF Sep 29, 2009 Matt Mereness, ERCOT.
Next-day Study Task Force Jason Ausmus NDSTF Chair W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Transition Plan Network Operations Model Change Requests 5/26/2010.
HMIS Management Reports and Data Quality Training Last updated:1/26/2012.
TMP3413 Software Engineering Lab Lab 01: TSPi Tool Support.
Bert Peters Chair, Path Operator Task Force
Phase Angle Limitations
Brett Wangen Director of Engineering, Peak Reliability
Eleanor Ewry Base Case Coordination Subgroup Chair
Western Electricity Coordinating Council
Unscheduled Flow Administrative Subcommittee MIC/OC Report
Mgr. Interconnection Reliability Initiatives
Mgr. Interconnection Reliability Initiatives
Review of After-the-Fact (ATF) Tagging Criteria Scheduler’s Meeting May 24, 2016 Raymond will ask the audience what their expectations are in regard to.
WECC RC Forum October 12, 2018.
Enhanced Curtailment Calculator (ECC)
PEAK’s RMTNET Tool Sarma (NDR) Nuthalapati, Principal NetApps Engineer
Scott Downey Director of Compliance
System Review Work Group
Review of After-the-Fact (ATF) Tagging Criteria Scheduler’s Meeting May 24, 2016 Raymond will ask the audience what their expectations are in regard to.
WECC RC Forum October 12, 2018.
Bert Peters Chair, Path Operator Task Force
SPP West Shadow Operations
Presentation transcript:

Joe Mercer Operations Planning Engineer III Operation Planning Analysis PHAAUG Meeting Mar 12 th, 2015

2 Peak OPA Tasks and Estimated Timeframes (red) Select RTNET Base Case 8:00A Review and Apply Innages/Outages 8:15A Review and Apply Load/Interchange Forecast 11:00A Review and Apply Path SOLs 1:00P Run STCA 1:00P Validate STCA Results 1:00-2:00P o Check for any posted entity study reports Entity Results Coordination 2:00-5:00P Compile OPA and present to RCSOs 5:00-6:00P Peak OPA Overview

3 RTNET Basecase and OPA Study Date YesterdayToday Tomorrow State Estimator (RTNET) snapshot WECC peak load Projected WECC peak load …snapshot case updated with forecasted data …

4 Using PI, determine appropriate timeframe Select RTNET Base Case

5

6 Select closest RTNET snapshot Select RTNET Base Case

7 Base case topology Generation, load, and interchange profile Path SOL Bulk electric system SOL Contingency and RAS database RAS arming points RTNET Base Case Initial Conditions

8 Update OPA With Forecasted Data YesterdayToday Tomorrow RTNET BasecaseOPA Study …Forecasted topology, load, interchange, and path SOL…

9 “Innages” – All elements that need to be returned to service. Outages – All elements that need to be removed from service. o COS Equipment Mapping database available on peakrc.org. Apply Innages/Outages

10 Customized COS Data view Date Filtered and Exported to Excel Apply Innages/Outages

11 Outage Data Filtered to determine outages and innages. Text file export containing outage/innage data. Apply Innages/Outages

12 Script driven application of outages. Process to verify COS mapping exists for outage description. Process to verify mapped topology changes were performed. COS Outages Auto-Application

13 Phantom scheduled outages. “One at a time” outages. “Operation Restricted” outages. “Hot work hold” outages. Line section outages. Outages elements not in COS Common COS Pit-Falls

14 Ideal: Forecasted Load + Forecasted Generation = Forecasted Interchange Currently: Forecasted Load + Basecase Initial Conditions Generation = Basecase Initial Conditions Interchange Load, Generation, Interchange Forecast

15 Apply Load Forecast

16 Apply Load Forecast

17 Apply Interchange Forecast

18 Day ahead unit commitment data not accurate enough to use for OPA. Unit “innage” does not indicate unit output. Unit derate does not indicate unit output. Generation Forecast Shortcomings

19 Apply New/Retired Path SOLs Path Report Data from COS

20 Before Running STCA: Review basecase SOL exceedances Review basecase path SOL exceedances Run STCA

21 STCA Results

22 Verify historical RC notes, limits, and contingency definition. Verify outage taken and/or scheduled accurately. Determine load/interchange impact on SOL exceedance. Review entities posted reports. Verify RAS or other protection schemes. Validate STCA Results

23 Typically occurs mid-late afternoon Validate results o Entities posted results, Ratings, Prior RC notes, RAS status, etc. Peak usually s or calls the entities o After hours follow up with Peak RC ROE, if needed. Validate coordinated mitigation plans Entity Results Coordination

24 Compile OPA and present to RCSOs Using SharePoint, log highlights of the OPA. Post OPA report internally and externally. Brief the RC leads the OPA results.

25 Contingency Definition Creating Contingency Definitions RAS Summary and Editor Peak RAS Project Contingencies and RAS

26 Contingency Definitions

27 Contingency Definitions

28 Creating Contingency Definitions

29 Creating Contingency Definitions

30 Creating Contingency Definitions

31 RAS Summary

32 RAS Summary

33 RAS Editor

34 RAS in EMS (RTCA) Viewing the triggers

35 RAS in EMS (RTCA) Viewing the actions

36 Viewing the results o EMS Displays  Level 3 24 pt RAS in EMS (RTCA)

37 Specific results o EMS Displays  Level 3 24 pt RAS in EMS (RTCA)

38 Peak RAS Project 1 year ago 8% complete Now 96% 8169 ctgs, 736 ctgs enabled for RAS

Joe Mercer - Operation Planning Engineer III Thank you for your time!