Press Fit Rework Project Project Update HDPUG Meeting Kawasaki, Japan 10/12/14.

Slides:



Advertisements
Similar presentations
Sierra Proto Express Introducing our Micro Electronics Division.
Advertisements

Manufacturing Processes for a 4 Layer Multi-layer PCB Section through PCB Via hole SMD Pad The following presentation covers the main processes during.
VL Connector To introduce the VL wire-to-board and wire-to-wire, crimp style connector series.
IPC COMPONENT PLACEMENT
JWPF Connector Wire –to-Wire Wire –to-Board
Breadboarding and Electronic Components. What is a Breadboard? Sometimes called a proto-board Reusable platform for temporarily built electronic circuits.
IPC-2221 Annular Ring Requirements
When a potential difference of 150 V is applied to the plates of a parallel-plate capacitor, the plates carry a surface charge density of 30.0 nC/cm2.
IENG 475: Computer-Controlled Manufacturing Systems Lathe Operations
GAUGES Gauges perform an essential services in any scheme of quantity production on an interchangeable basis A gauge (or Limit Gauge) is a tool or instrument.
Electro-Chemical Migration Definition Stage Project Wallace Ables - Dell HDP User Group Member Meeting Host: Oracle Santa Clara, CA. Feb Presented.
Electro-Chemical Migration Definition Stage Project Wallace Ables - Dell HDP User Group Member Meeting Host: Panasonic Bennington, Vermont September 25,
Chapter 10 Web splice.
The printed circuit board (PCB) design
Electro-Chemical Migration Definition Stage Project Wallace Ables - Dell HDP User Group Member Meeting Host: Shengyi Technology Co., Ltd. And NERCECBM.
Electro-Chemical Migration Idea Stage Project Wallace Ables - Dell HDP User Group Member Meeting Host: Multek Boeblingen, Germany May 22, 2012 Phone-in.
Electro-Chemical Migration Going to Implementation Stage Mike Bixenman HDP User Group Member Meeting Host: Flextronics Santa Clara, CA February 26, 2014.
Click to edit Master subtitle style 4/25/12 Thermal Management By using PLPCB technology with HEAVY Copper in PCB Pratish Patel CEO, Electronic Interconnect.
V. Cindro, Jožef Stefan Institute, Ljubljana, Slovenia SCT week, Valencia, June 2002 Pre-series Low Mass Tapes 12 different lengths were produced for barrel.
General Tolerance and Hole Fit
1/39 Passive components and circuits - CCP Lecture 11.
Reinforced Concrete Design
1 E906 Pre-Amplifier Card 2009/10/07. 2 E906 Wire Chambers Station1 MWPC: –build a new E906 MWPC. –4500 channels in total. Station2 DC: –recycle old E866.
IPC Datum Features Datum features indicate the origin of a dimensional relationship between a toleranced feature and a designated feature or.
PCB procurement WG Status report PCB WG status, 25/03/2014Joerg Wotschack.
FCBGA Package Warpage ØII Definition Stage Project Kirk Van Dreel, Plexus HDP User Group Member Meeting Host: Engent Atlanta, Ga. September 9, 2015 © HDP.
Going to Implementation Stage
1 4 PCB: LEFT TOP 115 channels, LEFT BOTTOM (115), RIGHT TOP (106), RIGHT BOTTOM (106). For LEFT TOP board 115 channels we have: 115 smd connectors (AMP.
Technology Road Map Imaging And Etching Trace / Space Outers * Current
Electro-Chemical Migration Definition Stage Project
IPC Land Requirements All lands and annular rings shall be maximized wherever feasible, consistent with good design practice and electrical.
12/02/99Team #12 Optimized Magnet Support EML 4551 Optimized Magnet Support EML 4551 Senior Design Dr. Luongo 12/02/99 Deliverable #3 Team #12 David Moore.
Future HDI Project – Definition Stage
IPC-2222 Thermal Relief in Conductor Planes
LDS Antenna DESIGN GUIDELINE
Electro-Chemical Migration Definition Stage Project Wallace Ables - Dell HDP User Group Member Meeting Host: IBM/DELL Austin, Texas Sept. 26, 2012 © HDP.
Upgrade PO M. Tyndel, MIWG Review plans p1 Nov 1 st, CERN Module integration Review – Decision process  Information will be gathered for each concept.
High Frequency Flex Project Definition Phase Project Lead: TBD Project Facilitator: John Davignon, HDPUG HDP User Group Member Meeting Santa Clara, CA.
IPC Conductive Material Requirements The minimum width and thickness of conductors on the finished board shall be determined primarily on the.
 A PCB is printed circuit board, also known as a printed wiring board. It is used in electronics to build electronic devices. A PCB serves 2 purposes.
PWB Back Drilling Phase 2 March 10, 2016 Project Proposal - Idea Stage Project Leader: PC Wong Project Facilitator: John Davignon © 2016 HDP User Group.
Effects of Component Rework on Reliability rev01 Khaw Mei Ming - Keysight HDP User Group Project Meeting 4 th May 2016 © HDP User Group International,
Effects of Component Rework on Reliability rev02 Khaw Mei Ming - Keysight HDP User Group Project Meeting 2 nd June 2016 © HDP User Group International,
Jin Liang,G. Morand, N. Dariavach
Andrei Nomerotski 1 Flex Status & AID A.Nomerotski, 18 June 2010.
Date of download: 6/29/2016 Copyright © ASME. All rights reserved. From: Printing Three-Dimensional Electrical Traces in Additive Manufactured Parts for.
24 September 2012 Immanuel Gfall (HEPHY Vienna) SVD Status of Mechanics PXD-SVD Meeting Göttingen.
Year 9 Steady Hand Game Design & Technology anode cathode gate LED – connected by flying leads to the PCB. Remember long leg positive, short leg negative.
IPC Annular Ring Requirements An annular ring shall be required for all plated-through holes in Class 3 designs. The performance specifications.
Benchwork IV –Hand Taps and Hand Reamers
Digital Speckle Correlation
Rev:A ( check-->19 pages document)
Breadboarding and Electronic Components
ELECTRONIC ASSEMBLIES AND SOLDERING TECHNIQUE –PART II
WORKSHOP 11 PRESS FIT CAT509, Workshop 11, March 2002 WS11-1.
Breadboarding and Electronic Components
ob-fpc: Flexible printed circuits for the alice tracker
New field cage LP2 Ole Bach, Bernd Beyer, Volker Prahl
Breadboarding and Electronic Components
Compliant Pin/Press Fit Technology
JWPS Connector Wire-to-wire and Wire-to-board
JFPS Connector Purpose: Objectives: Content:
Common termination methods:
Breadboarding and Electronic Components
What determines impedance ?
© 2016 HDP User Group International, Inc. All rights reserved
Breadboarding and Electronic Components
Final Design CGEM Workshop HIEP, 14/03/2017 M. Melchiorri - INFN FE.
Fits & Tolerances.
IPC Compliance Testing (DPA) Methodology
Presentation transcript:

Press Fit Rework Project Project Update HDPUG Meeting Kawasaki, Japan 10/12/14

© HDP User Group International, Inc. Since late 60’s or early 70’s First press fit was a square peg into a round hole using a fixed geometry solid pin construction, original pin designed for 1.5 mm diameter finished holes Recent years, compliant pins, finished holes just 0.22 mm diameter Source: Tyco Electronics Background

When performing press fit component rework, the plated holes and their annular rings could easily get damaged. Questions that need to be answered are: – How much hole wall deformation does one, or several, rework(s) cause? – How is the pin insertion force affected by the rework(s)? – How is the pin retention force affected by the rework(s)? – Will the gas tight connections be intact? There is a need to evaluate press fit component rework, especially for new components, boards and designs. © HDP User Group International, Inc. Background cont.

Project Goals The goal with this project is to understand and to document how rework affects press fit connection strength, hole wall deformation and gas tightness for new high-speed press fit connectors 0, 1x, 2x and 3x rework shall be performed on assemblies with: – Different, new, high-speed, small pin sizes, connectors – Three different hole sizes for each component (minimum, nominal and maximum specified diameters ) – Hole plating, ENIG and ImSn – Moreover, standard board materials and designs shall be used © HDP User Group International, Inc.

Expected Outcome The outcome of this project shall be a document that specifies how press-fit rework affects – Pin insertion force – Pin retention force – Hole wall deformation – Gas tight connection The project shall tell which pin and design combinations that work well to rework and what strength and hole wall deformations that could be expected © HDP User Group International, Inc.

Flow Chart © HDP User Group International, Inc. Basic Work

Connector rework test © HDP User Group International, Inc. 0x 1x 2x 3x

Total insertions & retentions 24 populated boards © HDP User Group International, Inc. ImSn, min holesImSn, nom holesImSn, max holes ENIG, min holesENIG, nom holesENIG, max holes

Gas Tight Test The activities in the flow chart below shall be performed on X pins per component/5 components per board/24 boards After the gas tight test cross sectioning shall be performed on these boards © HDP User Group International, Inc.

Contact Resistance © HDP User Group International, Inc. David Wice, Ciena

Cross Sectioning Use the boards from gas tight test for cross sectioning © HDP User Group International, Inc.

Pin retention test © HDP User Group International, Inc. 0x 1x 2x 3x

Total insertions & retentions 24 boards © HDP User Group International, Inc. ImSn, min holesImSn, nom holesImSn, max holes ENIG, min holesENIG, nom holesENIG, max holes

Test Processes Initial mechanical measurements of all used materials Insertion/Retention test – Demand on retention and insertion force in Telcordia GR CORE Visual inspection according IPC-001, IPC-610, Telcordia GR-78 R4-10, GR-1217-CORE and IEC (hole deformation, delamination etc.) – Directly after insertion – After rework – After retention of pins Electrical contact resistance measurements after aging (gas tight test) shall be performed for all components © HDP User Group International, Inc.

The backplane connectors in the following series will be used: DIN reference pin (Molex) ZDHD (Erni) ExaMezz (FCI) Impel (Molex) Strada Whisper (TE) Components

Need of Components If two different surface finishes are chosen, one base materials and min, nom and max hole diameters are used for each component: – 0x rework, 1 x 1 x 2 x 3 = 6 – 1x rework, 2 x 1 x 2 x 3 = 12 – 2x rework, 3 x 1 x 2 x 3 = 18 – 3x rework, 4 x 1 x 2 x 3 = 24 – 0x rework, 0 x 1 x 2 x 3 = 0 (pin retention test) – 1x rework, 1 x 1 x 2 x 3 = 6 (pin retention test) – 2x rework, 2 x 1 x 2 x 3 = 12 (pin retention test) – 3x rework, 3 x 1 x 2 x 3 = 18 (pin retention test) Total component needs = 96 (a few extra are needed for incoming inspection and measurement) © HDP User Group International, Inc.

Test Board Test board design suggestion exists 100mm x 100mm side lengths © HDP User Group International, Inc.

Suggested PCB parameters: – Surface metallizations: ENIG and ImSn – Base material: Isola 370HR – Hole sizes: Min, Nominal, Max (if possible) – Amount of layers: 6 – Distances between layers: L1-L2: 0.1mm, L2-L3: 0.5mm, L3-L4: 0.6mm, L4-L5:0.5mm, L5-L6:0.1mm – Board thickness 1.8mm – Outer copper layer thickness: 0.050mm (±0.020mm) – Inner copper layer thickness: 0.017mm (+0.003/-0.007mm) – L2, a full ground layer – Board size: 100mm x 100mm PCB Parameters

Connector Header Drill Hole Size Requirement Less than Nominal DrillNominal Drill Greater than Nominal Drill FCI ExaMax ".425mm ".45mm " # " Molex Impel ".425mm ".45mm " # " TE Strada Whisper 0.42mm+/-0.013mm (0.0165”) # ".425mm ".45mm " Erni ZDHD 0.55mm +/-0.02mm ( ”) # ".55mm " # Molex DIN mm +/-0.025mm (0.0452”) 1.125mm " 1.15mm " # " Decided drill sizes: Drill Sizes

Need of Boards One board for each hole size (min, nom, max) and surface finish (ENIG, ImSn) is needed for incoming board hole inspection/measurement – 3 hole sizes and 2 surface finishes give 6 boards Four boards are needed for each hole size and surface finish for the rework test (i.e. for 0x, 1x, 2x and 3x rework) – 4 boards, 2 surface finishes, 3 hole sizes, 1 base material give 24 boards Four boards are needed for each hole size and surface finish for the pin retention test (i.e. for 0x, 1x, 2x and 3x rework) – 4 boards, 2 surface finishes and 3 hole sizes give 24 boards Altogether 54 boards are needed © HDP User Group International, Inc.

Order test board – After agreed design – Each connector manufacturer check “their“ hole pattern Collect all components – For the actual test there will be a need of at least 120 components of each type – Need of extra single pins for each connector type Collect all needed information about press parameters and tooling – Borrow the tooling? – Find suitable site(s) to perform the press fit rework test Next Step

Plans for the Nearest Future Finalized and agreed design of test board – Dec 2014 Order test boards – Jan 2014 Received all necessary rework information and tools – Jan 2014 Start assembly and rework tests – March 2015 © HDP User Group International, Inc.

Test Questions Who shall manufacture the test board? Where shall the rework tests be performed? Where shall the gas-tight test be performed? – Contact Research Who shall do the cross-sectioning? Who shall do the analysis? © HDP User Group International, Inc.

Team List Team List: Participating Companies: – Dell – Philips – GE – Delphi – Curtis Wright – PWB Corp – Nihon Superior – Ericsson – Alcatel-Lucent – Multek – Cookson © HDP User Group International, Inc. – TTM – Juniper – ASUS – Oracle – Flextronics – Plexus – Cisco – Fujitsu – Ciena – Isola – IBM – ASE – Continental – Panasonic – Emerson – IST Group – Boeing – Fujitsu – ZTE – Sytech

Tentative Schedule Kick off - San José 2012 Idea Stage-Q Definition-Q Implementation-Q Publish Report-Q © HDP User Group International, Inc.