3D Building Modelling with ZE Modeller Team: ZENITH Julien Li-Chee-Ming, Damir Gumerov, Tudor Ciobanu.

Slides:



Advertisements
Similar presentations
Connoizor Enabling Performance for Businesses through Software Website: Contact:
Advertisements

Software Quality Assurance Plan
Mobile Technology for Streamlining Energy Audits Dustin Bane, Keres / EMAT April 23 rd, 2014.
Geospatial Technologies Used in Land Administration Kevin Daugherty Land Administration Solutions Manager Geospatial World Forum Rotterdam, Netherlands.
4th Year Systems Design Workshop ROUTE System Workshop Group #24 Danny Ho Macy Lui Gegi Thomas Supervisors: Prof. Doug Dudycha (GEOG) Prof. Eric Kubica.
LYU0603 A Generic Real-Time Facial Expression Modelling System Supervisor: Prof. Michael R. Lyu Group Member: Cheung Ka Shun ( ) Wong Chi Kin ( )
NCDA: Pickle Sorter Concept Review Project Sponsored by Ed Kee of Keeman Produce, Lincoln, DE.
BSBPMG501A Manage Project Integrative Processes 4.3 Direct and Manage Project Execution This is the process of performing the work defined in the project.
1.
Deriving Performance Metrics From Project Plans to Provide KPIs for Management Information Primavera SIG October 2013.
Combining High Level Synthesis and Floorplan Together EDA Lab, Tsinghua University Jinian Bian.
Chapter 3 Project Management
FIG Young Surveyors 2013, Lisbon, 18 October 2013 Low-Cost Integrated GNSS/INS for Surface Variation Monitoring Miguel Cordeiro João Apolinário.
Creator of RG Supervision Mobile Word Congress 16th &17th February 2011 Barcelona – ESP.
Modeling And Visualization Of Aboriginal Rock Art in The Baiame Cave
IMPLEMENTATION ISSUES REGARDING A 3D ROBOT – BASED LASER SCANNING SYSTEM Theodor Borangiu, Anamaria Dogar, Alexandru Dumitrache University Politehnica.
S D Laser Scanning of Acropolis of ATHENS. 3D scanning of the Wall and the Rock of Acropolis Athens and 3D model creation.
The Microsoft Office 2007 Enterprise Project Management Solution:
ERP E NTERPRISE R ESOURCE P LANNING Every Monday, 13:30 – 16:00 Last Updated: 31 March 2009ERP – Ir. H. Noor Hidayat, MMT.1.
Electrical and Computer Engineering Klaus Kristo Clem Leung Adam Frieden Chris Davidson Faculty: Professor Ramgopal Mettu Project: iPlanAhead Comprehensive.
Cadastre software based on Open Source in Kyrgyzstan Alexander Solovov Solution developer.
CS492: Special Topics on Distributed Algorithms and Systems Fall 2008 Lab 3: Final Term Project.
Interactive level of detail control for film quality crowd animation International Conference on Control, Automation and Systems 2008 Oct , 2008.
Autonomous Tracking Robot Andy Duong Chris Gurley Nate Klein Wink Barnes Georgia Institute of Technology School of Electrical and Computer Engineering.
Term Paper – CSC 557 “Contemporary Software Development Using Cloud Resources” By: Richard Appiah.
Onboarding: Enable Success or Failure Lindsay Dick Director of Sales.
Wimberley Market Days Progress Report Site Addressing and Management Analysis.
Statistics Monitor of SPMSII Warrior Team Pu Su Heng Tan Kening Zhang.
Switch off your Mobiles Phones or Change Profile to Silent Mode.
Software Project Management With Usage of Metrics Candaş BOZKURT - Tekin MENTEŞ Delta Aerospace May 21, 2004.
STREET VIEW Wenyang Liu GMAT9205: Fundamentals of Geo-Positioning Session 1, 2010.
Vclass Presentation Component Kanchana Kanchanasut, DEC Director Dr. Akavute Sujare, DEC Consultant Mr. Chaiwarat Chaiyapotpanit, Project Manager Distance.
VHDL Project Specification Naser Mohammadzadeh. Schedule  due date: Tir 18 th 2.
Software Development Cycle What is Software? Instructions (computer programs) that when executed provide desired function and performance Data structures.
BSBPMG501A Manage Project Integrative Processes 4.4 Monitor and Control Project Work The process of tracking, reviewing and regulating the progress made.
3D Building Modeling with ZE Modeller Team: ZENITH Julien Li-Chee-Ming, Julien Li-Chee-Ming, Damir Gumerov, Tudor Ciobanu.
Introduction Project Management. Projects A unique process, consisting of a set of coordinated and controlled activities with start and finish dates,
OHT 20.1 Galin, SQA from theory to implementation © Pearson Education Limited 2004 The components of project progress control Progress control of internal.
Topics Covered Phase 1: Preliminary investigation Phase 1: Preliminary investigation Phase 2: Feasibility Study Phase 2: Feasibility Study Phase 3: System.
Everyday Mapping of Traffic Conditions - An Urban Planning Tool Laboratory of Geodesy Aristotle University of Thessaloniki, Department of Civil Engineering.
Cmpe 589 Spring 2006 Lecture 2. Software Engineering Definition –A strategy for producing high quality software.
Service Component Registry and Repository (SCRR) April 26, 2007 Lico Galindo 2007 Exchange Network National Meeting.
By Vinod Kumar IAS Commissioner, Land Records & Settlement, Madhya Pradesh December 15-17, 2009, New Delhi Preparation of Digital Land Parcel Map.
Accurate Robot Positioning using Corrective Learning Ram Subramanian ECE 539 Course Project Fall 2003.
Process Improvements Andrew Kochen, HMRC September 2008.
INTRODUCTION TO GIS  Used to describe computer facilities which are used to handle data referenced to the spatial domain.  Has the ability to inter-
1 Chapter 3: Project Management Chapter 22 & 23 in Software Engineering Book.
By: David Gelbendorf, Hila Ben-Moshe Supervisor : Alon Zvirin
1 Post-Mortem Team Goonies Spinal Fusion Data Acquisition System Post Mortem Review 4/28/2012.
GPS Computer Program Performed by: Moti Peretz Neta Galil Supervised by: Mony Orbach Spring 2009 Part A Presentation High Speed Digital Systems Lab Electrical.
CISC 849 : Applications in Fintech Namami Shukla Dept of Computer & Information Sciences University of Delaware iCARE : A Framework for Big Data Based.
Managing ITS Assets using GIS in Silicon-Valley City of San Jose, CA Kenneth Salvail, P.E. ITE District 6 Annual Meeting July 2007, Portland Oregon.
Capstone design Remote manless probe Kim Jinkwang Han Seongkyu.
Visualization of Three-Dimensional Geometric Models in a Stereoscopic System Rositsa Radoeva Assistant professor at St. Cyril and St. Methodius University.
INDIGO Outreach and Exploitation process Peter Solagna, Matthew Viljoen EGI.eu.
Chapter 3 Project Management Parts of this presentation is extracted from Ian Sommerville’s slides located at
Advanced Higher Computing Science The Project. Introduction Worth 60% of the total marks for the course Must include: An appropriate interface using input.
Laser Control Status A. Masi, T. Feniet, K. Szczurek Awake Technical Board November 12 th 2015 Thanks for inputs from: M. Donze`, V. Fedosseev, C. Hessler.
Advanced Higher Computing Science
SESSION 9 PLANNING AND IMPLEMENTING A CENSUS GEOSPATIAL PROGRAMME
Photorealistic Rendering vs. Interactive 3D Graphics
CRM SOFTWARE by sme joinup
Accurate Robot Positioning using Corrective Learning
Mixture Density Networks
Budget, Schedule, Contingency
Lecture # 3 Software Development Project Management
X-DIS/XBRL Phase 2 Kick-Off
Structure of the final report
DOD’S PHASED SYSTEM DEVELOPMENT PROCESS
COMPANY PATH NAME Windows Application Software Providing worlds best Pathology Management or Laboratory Management software.
Presentation transcript:

3D Building Modelling with ZE Modeller Team: ZENITH Julien Li-Chee-Ming, Damir Gumerov, Tudor Ciobanu

Introduction Objective Develop a software solution for creating accurate photo-realistic polygon models from high density point clouds and digital imagery.

Latest Specifications Developed Components ZE Point Cloud Registration Module ZE Point Cloud Geo-referencing Module ZE Surface Modelling Module ZE Texture Mapping Module

Progress to Date Point Cloud Registration/Geo-referencing Implemented adjustment module for point cloud registration Developed and tested ATR algorithm GUI is undergoing development

Progress to Date Surface Modelling Decreased run-time ten fold Able to model more accurately

Texture Mapping Components I Tie Point Acquisition & Camera solution

Texture Mapping Component II

Progress to Date Synchronizing Frame Controls with Viewport Implementing Movement of Camera Finalizing Import File Format Finalizing Efficient Display Method Optimizing Frame Controls Inverse Kinematics of Geographic Points

Resolved Risks Huge data set  Long run-times Require efficient data structures and data processing techniques Set appropriate thresholds and parameters in data collection and processing Back up methods Have a backup method for every module, if component fails, attempt second method Trade off between ease of implementation and quality of output

Budget Expenditure ItemQuantityUnit PriceTotal Price Web hosting 1 year1$60 60$ ILRIS-3D Laser Scanner1Borrowed Observation Parser1Borrowed Target type A525$125$ Final Presentation1100$ TOTAL285$

Schedule 2008 – 2009 Team Zenith

Conclusions Project is on track to basic completion in accordance to design specs Component integration will be next There are contingency plans prepared in case of failure of future components

Thank You