European Commission DG Development Websites restructuration, redesign and publication access improvement WebDev Project July 2006 – December 2007 Florence.

Slides:



Advertisements
Similar presentations
Ministerial NEtwoRk for Valorising Activising in digitisation A Handbook on Good Practice in Digitisation Borje Justrell National Archives of Sweden.
Advertisements

Looking for IT answers? Browse our Service Catalogue. Denise Nahas, Kim Huynh, Xolani Ngwenya June, 2008 Information Systems Technology Customer Services.
>> Web Accessibility at WIPO Victoria Menezes Miller Web Systems Officer Internet Services Section February 2, 2010.
Regional Office for Europe and Central Asia REU/SEU website Lessons learned, experiences and challenges Ildiko Pocza, Information Resources and Library.
Disseminating Statistics: Internet and Publications INE – Madrid, 3-5 March 2008 Ulrich Wieland, Eurostat How to link publications and Internet in order.
1 Click to edit Master text styles Second level Third level Fourth level Fifth level AODA Website Accessibility Compliance at York: Open Discussion.
Strategies For Creating Accessible University Webpages Scot Close and Neil Torrefiel Web Services Unit San Jose State University.
The COUNTER Code of Practice for Books and Reference Works Peter Shepherd Project Director COUNTER UKSG E-Books Seminar, 9 November 2005.
Customizing the On-line Resource Panel discussion Larry Mueller Kimberly Area School District
‘european digital library’ (EDL) Julie Verleyen TEL-ME-MOR / M-CAST Seminar on Subject Access Prague, 24 November 2006.
Project Life Cycle Jon Ivins DMU. Introduction n Projects consist of many separate components n Constraints include: time, costs, staff, equipment n Assets.
Cathy Bailey Comp 6626 Project # 2 10/23/2009. WireFrame Alternative #1 Scenario: Click on a state and a PDF document of the state’s two page profile.
© OECD A joint initiative of the OECD and the European Union, principally financed by the EU The Strategic Planning System at Central Public Administration.
Information System for Quality Documentation A Short Presentation for the ESTP Course “Data Dissemination and Publication of Statistics” by Sonia Vittozzi.
Administration Of A Website Information Architecture November 17, 2010.
WITS : INFOLIT THROUGH WEB 2.0 TECHNOLOGY” Xoliswa Xanko1 Commerce Library University of the Witwatersrand.
Using a Content Management System Website for the Dissemination of Official Statistics By Edwin St Catherine, Director of Statistics, SAINT LUCIA UN Regional.
August 16, 2015Ministry of Regional Development - 2 Polish implementation system for European Funds  National Cohesion Stratergy the overall amount of.
Microsoft SharePoint 2010 Upgrade Preview FSU SharePoint Users Group Presents: Thursday, December 1 st, 2011.
Web Content Management Systems. Lecture Contents Web Content Management Systems Non-technical users manage content Workflow management system Different.
The ECHA-term project Multilingual REACH and CLP Terminology Dieter Rummel, Translation Centre for the Bodies of the EU Luxembourg EAFT - Oslo, 11 October.
Towards a renewed UNESCO Website BPI/WEB – Juin 2003.
WEB – Extreme make-over EUPRIO 2008, Stavanger Monique Jipping Director Communications Services Utrecht University.
IPEX - The next version ECPRD ICT seminar, November 2010, Bucharest IPEX – The next version A preview of ongoing work to redesign the IPEX website.
The Virtual Forum of the Puente in the Caribbean Program January 19-20, 2011 Julie Nurse, Department of Social Development and Employment.
Administration Of A Website Site Architecture October 20, 2010.
Content Strategy.
Bayu Priyambadha, S.Kom Teknik Informatika Universitas Brawijaya.
Marina Signore Head of Service “Audit for Quality Istat Assessing Quality through Auditing and Self-Assessment Signore M., Carbini R., D’Orazio M., Brancato.
Development of metadata in the National Statistical Institute of Spain Work Session on Statistical Metadata Genève, 6-8 May-2013 Ana Isabel Sánchez-Luengo.
Reporting Guidelines (FP5) Karen Fabbri Scientific Officer Natural & Technological Hazards DG Research European Commission Brussels
International Center for Agricultural Research in the Dry Areas Web strategy ICARDA2.0 :: re-design project 1.
Web Technologies Working Group October 25, Approval Needed Web Standards and Guidelines – Development of an online resource with the objective of.
How to use the VSS to design a National Strategy for the Development of Statistics (NSDS) 1.
European Commission Directorate General for Employment, Social Affairs and Equal Opportunities (DG EMPL) Migration of the “Publications” Web Site Yves.
Webmasters’ Guild User-Centered Web Redesign: Project Overview Presented by: Susan Powell and Jen Strand NYS Department of Taxation and Finance

Benchmarking Study on the Situation of the United Nations System and Development Institution Websites Results of the World Bank Conference Web for Development:
NUOL Internet Application Services Midterm presentation 22 nd March, 2004.
January 2005MERLOT Reusable Learning Design Guidelines OVERVIEW FOR MERLOT Copyright 2005 Reusable Learning This work is licensed under a Attribution-NoDerivs-NonCommercial.
Copyright 2010, The World Bank Group. All Rights Reserved. Principles, criteria and methods Part 2 Quality management Produced in Collaboration between.
ESCMID phone ESCMID/ESGAP Open Virtual Learning Community (OVLC) Draft Concept of Future Development and Costs November.
Future of EUPAN in the point of view of the Czech Presidency Ministry of Interior of the Czech Republic náměstí Hrdinů 1643/ Prague 4.
HORIZON 2020 W ORK PROGRAMME DG Research and Innovation.
Thomas Kern | The system documentation as binding agent for and in between internal and external customers April 24th, 2009 | Page 1 The system documentation.
Creating & Building the Web Site Week 8. Objectives Planning web site development Initiation of the project Analysis for web site development Designing.
National Nuclear Regulatory Portal (NNRP) (Concept, Development and Experience) FNRBA Training Course on Knowledge Safety Networks, 14–18 October 2013,
UNSD Recent international developments in Energy Statistics.
IAEA International Atomic Energy Agency Arusha, Tanzania CAMEROON Dr CHAKAM TAGHEU Pulchérie Julie 2 – 5 December 2013 RAF9038 Final Coordination Meeting.
1 Dissemination on Internet Experience of the Statistical Office of the Slovak Republic Dissemination on Internet Experience of the Statistical Office.
1 Click to edit Master text styles Second level Third level Fourth level Fifth level AODA Website Accessibility Compliance at York Open Discussions June.
EUROSTAT REPORT ON DISSEMINATION ACTIVITIES 1st Quarter 2004 Dissemination Working Group April 2004 Christine Kormann.
INTERNAL USE ONLY CIS Web Centre, December 22, Web Content Management Systems A Presentation by Randy Schilling CIS Web Centre.
NSU Website Structure By: Debbie Jones, NSU Webmaster 1 NSU Web Services Publication - Author: NSU Webmaster Norfolk State University.
MasterCard Global Marketing Center An Alfresco Case Study Jay Mandel, MasterCard International Mike Vertal, Rivet Logic Corporation 15 November 2012.
Developments in dissemination over the time Anne Nuka Head of Marketing and Dissemination Division
1 Recent developments in quality related matters in the ESS High level seminar for Eastern Europe, Caucasus and Central Asia countries Claudia Junker,
ILO Public web site guided tour. WEBDEV Page 2 The way we were...  The ILO web presence is composed of about 150 different sites  On top of them there.
Upgrade from 2013 to SDL Web 8 Road Map for Up-gradation.
Maria João Zilhão Planning and Quality Control Unit « High Level Seminar “Quality Matters in Statistics” June, Athens, Greece Implementation of the.
Investment Intentions Survey 2016
First Partners’ Meeting
CIRCABC evaluation, features and planning
Recent evolution of the Eurostat Internet and cooperation with Member States Luxemburg May 2009.
"Cities' and Regions' Profiles" website
State of progress Eurostat web site 3 Dissemination WG 29 April 2004
EPAN - eGovernment EPAN Administrative Framework
Web Design 1 Website Construction.
CEF e-Invoicing Readiness Checker
Experience from Statistical Office of Montenegro – MONSTAT
Presentation transcript:

European Commission DG Development Websites restructuration, redesign and publication access improvement WebDev Project July 2006 – December 2007 Florence NOEL Senior Functional Analyst

Where do we come from? Where are we going? Global context: General Directorate for Development and Relations with African Caribbean and Pacific States Project: three main chronological stages 1.Stage I: global analysis (August 2006 – January 2007) 2.Stage II (intermediate): execution of a « temporary » Web site within a specific contract (February – April 2007) 3.Stage III: detailed analysis and implementation of the final Web site including I-Center, in the continuity of the contract covering Stage I (April December 2007)

Stakeholders OPOCE (Contracting Customer for Stages I and III) DG DEV IT Service (Information, Communication and IT Unit) (real stakeholder for all stages and Contracting Customer for Stage II) I.R.I.S. for Project Management, Analysis, I-Center and Consultations development, Web editor (Stages I, II and III) and Tagora for all graphical aspects (Stages II and III)

DG DEV Web sites Two web sites : a “dgs” web site and a “Thematic” web site More than 25,000 files listed in the existing Web sites “Marked archaeological sedimentation” (old layers always present) Erratic navigation, “patchwork” style structure reflecting : –A defective external communication on DG DEV identity, –A centralization of the updates by the IT Service, –A lack of motivation of Web correspondents…

Confusing navigation - Overloaded - Not up to date - Not user friendly

Main constraints and stumbling blocks Upper management not committed to the process of web site redefinition and communication Organization Changes: change of DG DEV project leader, change of Head of Unit, DG DEV internal reorganization, real customer is not the contracting one… Change of perspective in the course of project : addition of a temporary site WCMS (Web Starter Kit) : policy within Europa versus its effective use in the context of reactive web sites and shared work…

Methodology 1.Global inventory of existing web sites 2.Methodology 3.Contents typology 4.Web components typology 5.“Issues / themes matrix” 6.Questionnaire 7.Workshops 8.General analysis report Look and feel Content Structure Communication The informational Web site implementation can’t be limited to the simple application of the already existing visual identity. Internet specificities imply an approach consisting of 6 stages: Ergonomics Maintenance

Stage I : results Analysis of the existing situation = Inventory encircled by statistics, targeted surveys and censuses A Web components typology and a contents typology A themes / issues Matrix (existing headings and themes to envisage according to the development policies promoted by European Union) A general structure specified to the third level A set of ergonomic recommendations concerning the interactions between the users and the Web site

Stage II : the temporary Web site (end of March 2007) Context Triggering factor: 50th Anniversary of the Treaty of Rome Challenge: six weeks to publish a informational web site Goal: to provoke internal services and Management for a start of pride Difficulties: WCMS integration unrealistic Radical editorial and technical choices: facility and availability

Stage II : the temporary Web site (end of March 2007) Results Web site available on the envisaged date General structure installation Global « Look and Feel » clearly defined and implemented Content: recoverable pages partly redistributed and available (more pages than initially envisaged)

Stage III : detailed analysis and implementation (April 2007 to Dec. 2007) Enrich the graphical aspects Improvement of the graphical aspects of the existing site New CSS integration with new under-level menu Enrich the ergonomics Definition of the structure’s secondary navigation Improve of the functional aspects of the “service” pages IPG rules compliance Definition of the priorities for the pages recovering Definition of the metadata’s for the static pages, complying with the IPG rules Add a Public consultation module

Enrich the Content Enrich the links’ density Add French version for navigation levels 1 and 2 Analyse, implementation, development of i-Center application –Existing documents migration with metadata assignation Sub-sites harmonization and integration –Europe cares –IQSG –Energy initiatives –Press-Forum –Media Library Stage III : detailed analysis and implementation (April 2007 to Dec. 2007)

I-Center : an on-line documentation center A document profile with 15 metadata and authority lists Multilingual versions management Full text search on textual metadata Metadata assigned to more than 4000 documents (importation) Web based indexation and administrative management Orientation space to find references and services

Conclusions Successful collaboration between the stakeholders Lessons learned from the intermediate project (Stage II) –The general analysis allowed a consistent temporary realization –The rate of work acceleration will have as a consequence : A better allocation of the priorities and definition of the detailed analysis The realization of a final site while increasing the internal and external motivation Difficulties for Stage III –Shared updates of the contents –Multilingualism: translations hunting –DG DEV still has to integrate some specific contents or graphical templates Lesson learned from Stage III –A good structure allows multiple extensions –Efficient analysis of the I-Center allowed a relevant application

Thank you for your attention