Calit2: The Path Forward Environmental Technical Working Group Environmental Technical Working Group Kick-Off September 25, 2009 Dr. Larry Smarr Director,

Slides:



Advertisements
Similar presentations
August July 2010 Annual Academic Calendar Colegio Los Robles.
Advertisements

[Imagine School at North Port] Oral Exit Report Quality Assurance Review Team School Accreditation.
National HIT Agenda and HIE John W. Loonsk, M.D. Director of Interoperability and Standards Office of the National Coordinator Department of Health.
Sensornets and Global Change
Calit2-Living in the Future " Keynote Sharecase 2006 University of California, San Diego March 29, 2006 Dr. Larry Smarr Director, California Institute.
Bringing Mexico Into the Global LambdaGrid Dr. Larry Smarr Director, California Institute for Telecommunications and Information Technology Harry E. Gruber.
The Disruptive Transition to Intelligent, Secure, Low Carbon, and Climate Adaptive Infrastructure Smart Infrastructure Panel Talk American Australian Leadership.
Why Optical Networks Are Emerging as the 21 st Century Driver Scientific American, January 2001.
Combining Wi-Fi and Cellular Internet Panel Discussion Evolving Markets in Telecommunications UCSD CONNECT, San Diego Telecom Council and San Diego Venture.
Cal-(IT) 2 The California Institute for Telecommunications and Information Technology Invited Talk UCSD Foundation Board of Trustees La Jolla, CA January.
The First Year of Cal-(IT) 2 Report to The University of California Regents UCSF San Francisco, CA March 13, 2002 Dr. Larry Smarr Director, California.
April 2005 UMBC Introduction to IEEE April 6, 2005 UMBC UMBC Computer Engineering Students Dr. Jeff Friedhoffer Past Baltimore Section Chair
© 2006 Open Grid Forum OGF-22 Opening Keynote Craig A. Lee, President, OGF February 25, 2008 OGF-22, February 25-29, 2008 Hyatt Regency Cambridge.
Aviation Security Training Module 4 Design and Conduct Exercise II 1.
U.S. Department of the Interior U.S. Geological Survey Agency Report, WGISS #22 September 15, 2006 Lyndon R. Oleson U.S. Geological Survey Center for Earth.
MRSEC Directors Meeting Focus on MRSEC Working Groups NSF, Thursday June 24, 2010 Sean Jones, Tom Rieker, and Charles Ying MRSEC Program Directors.
Restructuring of the Materials Research Science and Engineering Center (MRSEC) Program Creating New Opportunities for Collaborations and Partnerships in.
AIAA Task Force on Earth Observations 2 October 2009 AIAA HQ Reston VA.
February, 2010 LEA Support Advisory Council. Agenda 2:30-3:00Discuss plan revision process (feedback and support) 3:00-3:30Discuss February workshops.
IMPLEMENTING EABS MODERNIZATION Patrick J. Sweeney School Administration Consultant Educational Approval Board November 15, 2007.
Library Review. Agenda for today Outline of Library Review Campus review process Development of Library Review framework Library Self Study stage Steps.
Strive Cradle to Career Network Convening.
Management Plans: A Roadmap to Successful Implementation
Chapter 5 – Enterprise Analysis
2009 Strategic Planning playbook
T HE R OAD A HEAD LAC-DPH Strategic Plan Wendy K. Schiffer, MSPH Director of Planning, Evaluation, & Development County of Los Angeles Department of Public.
1 Elevators, Airbags & FM Radio Communication Planning Innovation and Next Practice Division (DEECD) Design Teams Professional Development Workshop February.
2010 SACS-COC Annual Meeting December 6, 2010 CS-69 Administrative Program Review Assuring Quality in Administrative and Academic Support Units.
/1 Transparency Challenge Panel March / Welcome & Introductions Suzanne Wise Strategy Consultation Overview of responses and next steps.
VOORBLAD.
Supporting Research on Campus - Using Cyberinfrastructure (CI) Public research use of ICT has rapidly increased in the past decade, requiring high performance.
Comparative Emergency Management Damon Coppola June 10, 2010.
School Calendar Mrs. Rothermel’s Class.
1. Welcome back to CSC- 1st day of class
1 Phase III: Planning Action Developing Improvement Plans.
Marketing Strategy and the Marketing Plan
Overview of Leading a Trip Purpose. Outreach. Adventure. Wartburg Service Trips.
“Building US/Mexico Collaborations Using Optical Networks” Opening Workshop Welcome Big Data Big Network 2 Calit2’s Qualcomm Institute February 10, 2014.
The Horizon Report In Action: Emerging Technologies Today and Tomorrow Malcolm Brown Veronica Diaz EDUCAUSE Learning Initiative.
 January 27, 2003 UCD and UCHSC Consolidation Study Presentation to the Faculty Assembly.
High Performance Wireless Research and Education Network
Columbia-Greene Community College The following presentation is a chronology of the College strategic planning process, plan and committee progress The.
The National Climate Assessment: Overview Glynis C. Lough, Ph.D. National Climate Assessment US Global Change Research Program National Coordination Office.
Strategic Planning Staff Development Week
Science at the FDA: Update for the Science Board Jesse L. Goodman, MD, MPH Chief Scientist and Deputy Commissioner for Science and Public Health November.
Reorganization at NCAR Presentation to the UCAR Board of Trustees February 25, 2004.
October 27, 2005 Contra Costa Operational Area Homeland Security Strategic and Tactical Planning and Hazardous Materials Response Assessment Project Overview.
US Climate Change Science Program Incorporating the US Global Change Research Program and the Climate Change Research Initiative U.S. Climate Change Science.
“Calit2: A UC Experiment for Living in the Future" Talk to UCSD Near You La Jolla, CA April 11, 2006 Dr. Larry Smarr Director, California Institute.
ICANN COMMUNITY STRATEGIC PLANNING DISCUSSION Brussels, June
Developing a North American Global LambdaGrid Dr. Larry Smarr Director, California Institute for Telecommunications and Information Technology Harry E.
Cal-(IT) 2 : A Public-Private Partnership in Southern California U.S. Business Council for Sustainable Development Year-End Meeting December 11, 2003 Institute.
REDUCING DISASTER RISK THROUGH EFFECTIVE USE OF EARTH OBSERVATIONS Helen M. Wood Chair, U.S. Subcommittee on Disaster Reduction August.
Dan Cayan USGS Water Resources Discipline Scripps Institution of Oceanography, UC San Diego much support from Mary Tyree, Mike Dettinger, Guido Franco.
The Interaction of UCSD Industrial Partners, the Jacobs School of Engineering, and Cal-(IT) 2 Dr. Larry Smarr Director, California Institute for Telecommunications.
Development of the Strategic Vision and Where We Go From Here? Dan Dooley Vice President.
Applied Sciences Perspective Lawrence Friedl, Program Director NASA Earth Science Applied Sciences Program LANCE User Working Group Meeting  September.
“The UCSD Big Data Freeway System” Invited Short Talk Workshop on “Enriching Human Life and Society” UC San Diego February 6, 2014 Dr. Larry Smarr Director,
“ OptIPuter Year Five: From Research to Adoption " OptIPuter All Hands Meeting La Jolla, CA January 22, 2007 Dr. Larry Smarr Director, California.
Facing Tomorrow’s Challenges USGS Natural Hazards Science in the Coming Decade Facing Tomorrow’s Challenges USGS Natural Hazards Science in the Coming.
1 National Centers for Environmental Prediction Status of UCAR Review Recommendations Executive Summary September 15, 2010 Louis Uccellini Director “Where.
U N I T E D S T A T E S D E P A R T M E N T O F C O M M E R C E N A T I O N A L O C E A N I C A N D A T M O S P H E R I C A D M I N I S T R A T I O N.
“OptIPuter: From the End User Lab to Global Digital Assets" Panel UC Research Cyberinfrastructure Meeting October 10, 2005 Dr. Larry Smarr.
Dave Wallace ANDREA CHAPPELL IST September 13, 2012
Introduction Distance learning has increased drastically over the last 100 years. High-speed network connectivity enables more opportunities for distance.
Board of Trustees Update
High Performance Wireless Research and Education Network
Optical SIG, SD Telecom Council
Presentation transcript:

Calit2: The Path Forward Environmental Technical Working Group Environmental Technical Working Group Kick-Off September 25, 2009 Dr. Larry Smarr Director, California Institute for Telecommunications and Information Technology Harry E. Gruber Professor, Dept. of Computer Science and Engineering Jacobs School of Engineering, UCSD

Todays Meeting Agenda 10:00-10:30 Roundtable Introductions –Who Are You, What Do You Do, How Does it Relate to Environmental thrust. –Each person limited to 1 minutes! 10:30-11:00 Planning Process Overview –Overview of Strategic Planning Process, Desired Output, Timeline –Questions and Answers on Process 11:00-11:45Technical Brainstorming [Initial Discussion] –What are the strengths, weaknesses, opportunities for Calit2 in Env? –What are the application opportunities in this thrust in next 5-10 years? –What technologies are needed to realize the application opportunities? 11:45-12:00Leadership of Technical Working Group –Nominations/Volunteer for leadership of TWG –Decisions on leadership will be made after the meeting and communicated to the working group prior to the next meeting.

Calit2 Continues to Pursue Its Initial Mission: Envisioning How the Extension of Innovative Telecommunications and Information Technologies Throughout the Physical World will Transform Critical Applications Important to the California Economy and its Citizens Quality Of Life. Calit2 is a University of California Institutional Innovation Experiment on How to Invent a Persistent Collaborative Research and Education Environment that Provides Insight into How the UC, a Major Research University, Might Evolve in the Future. Calit2 Review Report: p.1

Calit2 Must Update Its Vision for the Next Decade and Answer the Presidents Call We need to do a better job of telling our story in Sacramento and beyond. I've made some 20 trips to the capital in the past year and will continue my advocacy. But frankly, I could use some help. --UC President Yudof

Calit2--A Systems Approach to the Future of the Internet and its Transformation of Our Society Calit2 Has Assembled a Complex Social Network of Over 350 UC San Diego & UC Irvine Faculty From Two Dozen Departments Working in Multidisciplinary Teams With Staff, Students, Industry, and the Community Integrating Technology Consumers and Producers Into Living Laboratories of the Ubiquitous Internet

Institutional Innovation Successes Persistent Collaborative Framework Birthing and Housing of Centers and Large Grants Development of Shared Facilities Living Laboratories We Will Continue This Approach of Decentralized Innovation

The Components on Which Calit2 Can Build the Next 5-10 Years

Principles for Developing the Path Forward Responsive to LARGE-SCALE SOCIETAL CHALLENGES in California and Beyond Articulates a Clear Five-Ten Year Vision of Significant Scientific or Technical Challenges Builds on Strength of Both Campuses and Expands as Needed to External Partners (Other Universities, National Laboratories, Etc) Engages Existing Centers, Large Grants, & Large Scale Calit2 Infrastructure Anchored in One Application Area, but Draws from The Institutes Other Seven Application and Enabling Technologies Creates At Scale Living Laboratory Prototype that Demonstrates the Feasibility of Addressing the CHALLENGE

Planning Activities All-Hands Meeting to Describe Planning Process, Level Set [Sept 8,2009] –Meeting took place on September 8, 2009 from 10:00-11:30am with faculty from UCSD and UCI linked together via VTC. –Meeting materials may be accessed at: –Username: calit2 (lowercase)Password: 2010 Technical Working Group Meetings [Sept 25-December 4, 2009] –Technical working groups will meet in from Sept-early Dec to provide technical input on future directions. –Goal is for working groups to meet 2-3 times. Reverse Town Hall Meeting [Week of December 7, 2009] –Volunteer leads of each technical working group will co-present the results of their working group discussions –Each group will be given 15 minutes to present, followed by 15 minutes of Q&A.

Overview of Planning Activities Continued Freeze Input, Develop Final Draft of Document [Dec-early Jan 2010] –All input from technical working groups and community will be finalized by December 11, –A final draft of the document will be created by January 15, Review Cycle [January 2010] –Review by Calit2 Governing and Advisory Groups –Calit2 Divisional Councils at UCI and UCSD –Calit2 Executive Governing Board –Calit2 Advisory Board. Finalizing the Plan Forward [February 2010] –The document will be finalized and publicized on the web by March 1, 2010.

Visual Timeline for Developing The Path Forward MonTuesWedThurFri 31SEPT *78 ALL HAND S Planning and Kick-Off September 2009 October-November 2009 A total of 48 working days for Technical Working Group Activities MonTuesWedThurFri TWG- ENV OCT 12 TWG- HEALTH TWG- ENERGY TWG- CULTURE nd ALL HANDS NOV * *26*27 30Dec 1234 Campus Working Group Meetings MonTuesWedThurFri *21*22*23*24*25 *28*29*30*31JAN *1 December 2009 Target for Reverse Town Hall Review of Technical Input MonTuesWedThurFri JAN DOC * January 2010 Review Cycle CALIT2 Gov & AB COUNCIL CALit 2 DiV Councils

What Output Do We Want for the TWG? Technical White Paper of Calit2 Opportunities in Environment –Maximum of 10 pages, high level vision, major stakeholders, needed technologies, Calit2 unique efforts, gap analysis (what do we have, what do we need to realize vision). Executive Summary of Technical White Paper for Path Forward Document –Maximum of 3 pages, summarizes details of more technical oriented white paper. Strength, Weakness, Opportunities, Threats, Gap Analysis –Maximum 2 page document that summarizes SWOT and Gap conversation. –SWOTs will be kept internal, not shared in public document.

The Digital Transformation of Environment Water, Fire, & Changing California Climate –Global Climate Change Drives Regional Climate Disruption –Common Mirror World of Southern California for Fire and Water Management –3D Detailed Natural and Human Modified Environment –Wide-Spread Sensor Nets –Emergency Response to Disasters –Policy and Decision Support Tools

Climate Change Will Pose Major Challenges to California in Water and Wildfires It is likely that the changes in climate that San Diego is experiencing due to the warming of the region will increase the frequency and intensity of fires even more, making the region more vulnerable to devastating fires like the ones seen in 2003 and California Applications Program (CAP) & The California Climate Change Center (CCCC) CAP/CCCC is directed from the Climate Research Division, Scripps Institution of Oceanography

Dan Cayan SIO and USGS Alan Sanstadt LLNL Mary Tyree SIO Ed Maurer Santa Clara University Mike Dettinger USGS, SIO Hugo Hidalgo Univ. Costa Rica Tapash Das SIO Nick Graham HRC, SIO Peter Bromirski SIO Reinhard Flick Calif Boating and Waterways, SIO sponsors: California Energy Commission PIER program California Ocean Protection Council NOAA OGP RISA element Climate and Sea Level Scenarios for California: State Assessment Assessment Science Mtg, SIO 4/20/2009

Using Advanced Info Tech and Telecommunications to Accelerate Response to Wildfires October 22, 2007 Harris Fire San Diego Photo by Bill Clayton, Station Fire From JPL Aug. 30, 2009

Creating a Proposal Addressing a Major Challenge to California UCSD UCI LANL UCSB

Creating a Digital Model of Southern California and Coupled Codes to Simulate Wildfires Start with Sophisticated Los Alamos Wildfire Simulator Rodman Linn, Los Alamos

Coupling FIRETEC/HIGRAD to the Rest of the Environment UCI LANL UCSB

1/3 Billion Pixel OptIPortal Linked to NASA Goddard Earth Satellite Images of October 2007 Wildfires Source: Falko Kuester,

HPWREN Topology, August 2008 approximately 50 miles: MVFD MTGY MPO SMER CNM UCSD to CI and PEMEX 70+ miles to SCI PL MLO MONP CWC P480 USGC SO LVA2 BVDA RMNA Santa Rosa GVDA KNW WMC RDM CRY SND BZN AZRY FRD PSAP WIDC KYVW COTD PFO BDC KSW DHL SLMS SCS CRRS GLRS DSME WLA P506 P510 P499 GMPK IID2 P509 P500 P494 P497 B08 1 P486 Backbone/relay node Astronomy science site Biology science site Earth science site University site Researcher location Native American site First Responder site NSS S SDSU P474 P478 DESC P473 POTR P066 P483 CE 155Mbps FDX 6 GHz FCC licensed 155Mbps FDX 11 GHz FCC licensed 45Mbps FDX 6 GHz FCC licensed 45Mbps FDX 11 GHz FCC licensed 45Mbps FDX 5.8 GHz unlicensed 45Mbps-class HDX 4.9GHz 45Mbps-class HDX 5.8GHz unlicensed ~8Mbps HDX 2.4/5.8 GHz unlicensed ~3Mbps HDX 2.4 GHz unlicensed 115kbps HDX 900 MHz unlicensed 56kbps via RCS network dashed = planned Hans-Werner Braun, HPWREN PI

Firefighters from the Sky Ron Serabia Fire Captain Semi-Retired Talk to Ron in the Calit2 Theatre

Calit2 Added Live Feeds From HPWREN Cameras to KPBS Google Map