Data to Deployment Clark County Fire Department IAFF 2007 EMS Conference.

Slides:



Advertisements
Similar presentations
City of Petaluma Fire Station/ Headquarters Building August 30, 2006 Workshop.
Advertisements

0 EMS Stakeholders Meeting 2011 August 25, 2011 Bob Leopold EMS and Trauma Systems Program.
The IFPD proudly answering the needs of Idyllwild Since – 2015 Final Budget.
CITY OF YORK, PENNSYLVANIA DEPARTMENT OF FIRE/RESCUE SERVICES.
Fairview Fire District Geographic Information System (GIS) Fire Suppression and Emergency Medical Services Response Capabilities Analysis.
Ossining Ambulance District September Current Situation The Greater Ossining Community has enjoyed 24 hour emergency medical care and transport.
Huntsville Fire & Rescue. To Save Life and Property Prepare for Large and Small Emergencies Maintain 24/7 readiness.
Presentation on Sustainable Fire Services.  The Problem:  Fire Department Operations are Unsustainable.  Two Things have changed:  Operations  Loss.
NFPA Standard 1710: Organization and Deployment of Fire Suppression Operations, EMS and Special Ops The Right Description.
Deployment Analysis Under Public Scrutiny Colorado Springs FireDepartment Fire Department © 2002 City of Colorado Springs.
Property Tax Hearing August 12, Purpose Of Public Hearing Meet Requirements of State Law Explain the City’s reasoning for the proposed tax increase.
Sharing Services “There When You Need Us Most” Safe-D Conference January 15-17, 2015.
Wasatch County Fire Protection SSD Proposed Tax Increase.
FIRE DEPARTMENT ORGANIZATION State of Georgia BASIC FIRE FIGHTER TRAINING COURSE.
Town of Carver Review of Proposed Plan for Fire and Police Facilities November 12, 2013 EDWARD J. COLLINS CENTER FOR PUBLIC MANAGEMENT.
2013 Business Plan Fire & Rescue Services Department.
INTRODUCING THE COST APPROACH Chapter 11. Base cost Builder’s profit Building shell Building size and shape Comparative square-foot method Construction.
The 2002 Assistance to Firefighters Grant Program’s on-line application process has been designed to lead fire departments through a series of screens.
Accounting Details We show transfers as a separate line below personnel, operating expense, and capital outlay so true cost of the department before transfer.
Revision: May 2012 HEAL PROJECTS. Source: HEALTH EDUCATION AUTHORITY OF LOUISIANA (HEAL) Project Type: HEAL GARAGE (Original Project) HEAL Revenue Bonds.
Evesham Fire-Rescue Providing Quality Fire and Emergency Medical Services Fire Chief Ted Lowden.
Orange County Fire Rescue James Fitzgerald, Deputy Chief
CITY OF MERIDIAN FY07 BUDGET HEARING Mayor – Tammy de Weerd Council President – Shaun Wardle Council Vice President – Joe Borton Council – Keith Bird Council.
Leadership Asheville Gary Jackson City Manager Public Leadership and Delivering Better Service to Citizens for Less Money.
NFPA 1710 Standard for the Organization and Deployment of Fire Suppression Operations, Emergency Medical Operations and Special Operations to the Public.
Strategic Plan December 10, 2008 CONTINUOUS IMPROVEMENT…CUSTOMER SERVICE.
Financial Savings to the (Your City/Town Name) Council by the (Your Department Name) Fire Department Your neighbors, co-workers and friends, helping you.
Local Government in Texas Local officials should be easily accountable to the public. Conditioned upon public and media attention More time cost to follow.
FRESNO COUNTY FIRE PROTECTION DISTRICT. Fresno County Fire  Budget = $13.5 mil ($10 mil 10 yrs ago)  15,000 Incidents in 2006  Response time of 11:36.
Fire Department Structure and Procedure
Organizational Module 1 Fire and Rescue Citizen Academy Organizational Structure.
The Seven Regional EMS Agencies A Growing Fiscal Crisis.
Needs Analysis Full-Time Staffing Levels Michael A. Walker, Fire Chief.
1 Becoming a Landlord Part 1 National Alliance to End Homelessness Washington, DC July 9, 2007 July 9, 2007 Michelle Flynn The Road Home, Salt Lake City,
2006 ANNUAL CONFERENCE CALIFORNIA SOCIETY OF MUNICIPAL FINANCE OFFICERS COMMUNITY FACILITIES DISTRICT FINANCING FOR SERVICES AND INFRASTRUCTURE Sam Sperry,
Centre Region Council of Governments. 150 Square Miles 83,000 Population *Includes Students.
Organizational Study of Inspectional Services City of Springfield, Massachusetts February 21, 2008.
Process of Planning, Designing and Financing a Hospital
Dallas Fire-Rescue Communications Division Dispatch Operations September 14, 2015.
FEBRUARY 22, 2016 FY 2017 County Administrator’s Recommended Budget.
February 17, 2016 Greater Eagle FPD Organizational Evaluation Cooperative Services Investigation Presented by: Dan Qualman February 17, 2016Greater Eagle.
1 BUREAU OF FIRE PREVENTION May DIVISON OF FP & FI 2 +
BOND PLANNING FIRE STATION, EMERGENCY RESPONSE, AND COMMUNITY SAFETY IMPROVEMENTS.
Staffing : 2016 A 38 E 38 26* 2014 Calls by Main Categories Alarms % EMS % Rescue611.4% Fire541.2% Good Intent % Hazardous Condition1363.0%
1 New Territory Municipal Utility Districts Strategic Partnership Agreement Discussions With the City of Sugar Land.
Stockton Fire Department…. Committed to Excellent Public Service for the Citizens of Stockton.
BUREAU OF FIRE PROTECTION
City and County of San Francisco 1 Five Year Financial Plan Update FY through FY Joint Report by the Controller’s Office, Mayor’s Budget.
Mission Statement The mission of Central Pierce Fire & Rescue is to quickly, skillfully, and compassionately respond to the needs of our diverse communities.
Elizabeth Gray City Manager.  On September 9 th, 2003, Citizens in Tulsa County approved a (0.60) (sixty hundredths of a percent) sales tax it was used.
Financial Savings for the (Town/Agency/etc. Name) Add Your Logo Here Prepared by (Department Name)
EAST CONTRA COSTA FPD District Update March 30, 2009.
Enterprise Zones – Status & Local Incentives Discussion City of Woodburn March 8, 2010.
Update on Oak Cliff Municipal Center Addition Economic Development Committee June 6, 2016.
Boarding Home Facilities Presented to the Housing Committee November 7,
2011 Annual Report.
Water & Wastewater Capacity Charge Work Shop
Presented By: Marc Leduc
Throughout your presentation please ensure you are adhering to the style guide. Do not use additional pictures, clipart, etc. Fire Rescue.
Summit County EMS 2018 BUDGET DISCUSSION
STRATEGIES FOR fire & EMS Efficiencies
General Tab Project, Cost Schedule, and Work Limits Roadway Character
Financial Savings to the Town of (Insert Name)
MIDLAND FIRE DEPARTMENT OPERATIONAL COVERAGE
Fairfax County Fire and Rescue
Julian Cuyamaca Fire Protection District
SHORT TERM RENTALS February 15, 2018.
Funding the Town’s Transportation Infrastructure Improvement Plan (IIP) – An Initial Discussion of Impact Fees Town Council Meeting March 1, 2017.
TUESDAY, APRIL 3rd.
Ebbetts Pass Fire District Special Tax Measure Presentation
Presentation transcript:

Data to Deployment Clark County Fire Department IAFF 2007 EMS Conference

Early 2000 – Population Growth beyond service capability –Large residential development 5,000-6,000 new residents per month Growth in the outlying areas Extended response times with current resources Tax base could not support without mandates –Public Service –Customer Service 100,000 – 500,000 tourist each day Situation Overview

Rural Stations

Urban Stations

Quick Look at Statistics Population Served - *1,815,700 The number includes only the residents and is not indicative of the actual population served. Our community welcomes over 41 million visitors each year. This means that on average, the combined population of Clark County, Las Vegas, North Las Vegas and Henderson nearly doubles its volume each month.

Quick Look at Statistics... Land Area Covered (in sq. miles)- 7,420 Paid Fire Stations- 25 / Paid Firefighters- 614 Volunteer Fire Stations- 13 / Volunteer Firefighters- 350 Inspectors & Investigators- 58 Support Employees- 50 Total Incidents- 103,944 Fire Incidents- 4,143 Medical Incidents- 76,120 Fire Prevention Inspections- 99,133 Construction Plan Reviews - 8,538

Proposed Solution Need for fire and EMS service to keep outpacing growth Developer-based agreements –Large scale builders –Ensure emergency services not compromised

Thoughts Behind the Idea Builder making large profits Builder needs planning and zoning permits Fire department involved in inspections for permits Builder would agree to build fire station Builder agree to equip station with adequate resources to service the population in the area –Based on stations in comparable areas of the county –Staffing to be absorbed by local tax base (new population of residential) Station built at the same time as the building under construction

Influence with the Builders Used in residential sales approach Large parcels of land almost used up No more lots available by 2012 –Timing is everything Little impact in areas that are already developed

Las Vegas Strip Corridor 2-3 miles in length Large scale impact on emergency service resources Open land parcels in this area are significantly smaller Older structures are being demolished to allow for newer innovative structures Three profit levels –Residential –Retail –Convention space As many as 70 new structures planned to be built in this area Scheduled to be completed by 2010

Significant Structures City Center – south of the Bellagio Hotel Twin story high rise residential –250,000 new residents in less than 1 square mile Retail shops

Nuts and Bolts of Development Agreements Using City Center (owned by MGM) as example: Anticipated emergency services problems due to highly congested area Fire department committee formed for collaboration –Administration –Fire prevention –Labor (Local 1908) Met with developers to discuss anticipated problems upon occupation MGM management understood the issue and agreed proposals were in best interest of workers now and occupants upon completion City Center coordinators agreed to –build a fire station –furnish all living standards –purchase a new engine and two rescue units to be housed at the station Station to be opened 12 months prior to certificate of occupancy

Considerations of Developer Agreements Legal consult from District Attorney Data –Response projections –Geographic boundaries –Estimated financial impacts (now and future) Planning and Zoning understanding of intent of agreements to assure longevity Political leaders who understand the intent and won’t back door you with the builders Financial representative to assist you with the numbers Qualified architect A fire department representative to assure fire station is located appropriately for accessibility in conjunction with the building Inspectors to check plans and to be dedicated on site to assure no lag time

Methods for Station Planning for New Property Baseline of 3,000 responses per year is the maximum a unit can handle and still comply with mandated training requirements and other required activities. Response projection for new property is based on 4 years of response data from comparable existing properties

Data Points Collected Number of Annual Responses Types of Responses –Medical –Fire –Hazmat Type of units responding –Rescue –Engine –Truck –Special operations Number of units responding –Single unit response – medical, public assist –Two/three unit response – vehicle accident, elevator –Four or more unit response- fire, hazmat

Building Data Points Square Footage of convention space Square footage of retail space Number of rooms –Condo –Resort –Hotel Historical data for similar properties –Anticipated responses

Overhead Costs Estimated operating costs for suppression –Captain –Engineer –Firefighters –Etc… Support personnel –Training –Mechanics –Administrative staff Salary projection for 12 months from the opening date of the project

Facility Costs Assumptions: –Typical fire station with 3 bays –Single unit requires 1/3 fire station

Cost Projection Formula Example: –1500 projected calls /3000 = 50% –1 rescue unit needed at $806,140 $806,140 x 50% = $403,170 –1 fire engine at $1.3 million $1.3 million x 50% = 650,000 –Fire station costs = $10.5 million 2/3 of a station = $7 million $7 million x 50% = $3.5 million –Overhead Salary – 1 year/50% = $1.5 million TOTAL = $6,053,170

Proposals Alexander Villas –Station – 5% contribution –Engine – 18% contribution –Personnel – 18% contribution (1 year) –Fire Inspector (24 months- construction period) –Plans Checker (24 Months) –Fire Prevention vehicle and equipment –Total = $1,459,404

Proposals Gemstone –Station – 6% contribution –Engine – 21% contribution –Personnel – 21% contribution (1 year) –Fire Inspector (.83 for 24 months- construction period) –Plans Checker (.24 for 24 Months) –Fire Prevention vehicle and equipment –Total = $1,595,416

Proposals Echelon Place –Station – 24% contribution –Rescue (EMS) Unit – 0% –Engine – 60% contribution –Truck – 60% contribution –Personnel – 0% contribution –Fire Inspector (2 for 24 months- construction period) –Plans Checker (1 for 24 Months) –Fire Prevention vehicle, equipment and support staff –Total = $5,225,019

Proposals Fontainebleau –Station – 50% contribution –Rescue (EMS) Unit – 0% –Engine – 50% contribution –Truck – 50% contribution –Personnel – 0% contribution –Fire Inspector - 0 –Plans Checker -0 –Fire Prevention vehicle, equipment -0 –Total = $2,745,960

Proposals Las Palmas –Station – 34.4% contribution –Rescue (EMS) Unit – 0% –Engine – 22.9% contribution –Truck – 11.5% contribution –Personnel – 0% contribution –Fire Inspector - 0 –Plans Checker -0 –Fire Prevention vehicle, equipment -0 –Total = $1,822,440

Proposals Sands Expo –Station – 4.3% contribution –Rescue (EMS) Unit – 0% –Engine – 2.9% contribution –Truck – 1.4% contribution –Personnel – 4.3% contribution –Fire Inspector - 0 –Plans Checker -0 –Fire Prevention vehicle, equipment -0 –Total = $254,320

Questions