This was the existing floor Original floor in bathroom, 12” x 12” adhesive backed vinyl tiles.

Slides:



Advertisements
Similar presentations
NGfL CYMRU GCaD FLOOR COVERINGS.
Advertisements

Sunny day, installing exterior casings on the windows.
4.02 Floor Treatments. Floors Usually the first background treatment planned in a room Consider purpose of room, amount of traffic, does it fit into color.
Overview Information obtained from FOXDIY.CO.UK J.Byrne 2012.
Background Surface Treatments
WOOD LIGHT FRAME CONSTRUCTION
Build the Next Generation Bathroom w/ New Kerdi Line Products Give your contractors more building options with the new Kerdi line drain & tileable grate.
Chapter 13, Section 3. Discuss the procedures for removing these types of stain from tile floors Blood stains Burn marks Candy or chewing gum Heel marks.
CHAPTER 10, SECTION 4. Cleaning the bathroom: What to do first?  Soak soiled ashtrays.  Clean vents.  Clean the ceiling.
Method to fix wall tiles. Preparation All wall tiles to be immersed in water for 3-4 hours for better results. Some gap in between the rows to allow the.
Grouting Ceramic Tile This step comes after the tile is installed and has had time to cure. It is very important to either follow the instructions listed.
RESILIENT FLOOR COVERINGS.  KINYUA BRIAN MURITHI  KINUTHIA GEROGINA WAMBUI  KYALO PATRICK KELI  KIOKO SHAWN MWENDWA.
SINK YOUR TOES INTO SUMMER FLOORING. Different types of flooring Carpet Tile Wood VinylArea Rugs.
Lone Star Region National Model Railroad Association “The Shack” Scratch Build -Mike Jobe.
Arch 330 Fall 2008 FORMWORK AND REINFORCING FOR CONCRETE.
Cleaning out the stable for the girls. Bathroom window – we have to leave the stained glass and sash and install the new window on the outside of them.
Clean-up Steps Remove water Empty Contents Remove water, mud & muck Remove wall materials and etc. Wash Sanitize Ventilate & dry.
Fundamentals of Taping. Why do ATC’s tape? Protective tape is used to prevent injuries and to keep existing injuries from getting worse Must be applied.
Hogan Residence Bathroom Remodel Valued Repeat Customer Kitchen Remodel (see other presentation) Basement Bathroom Addition (see other presentation) Upstairs.
R.H. ADCOCK / ARCHITECT AND ASSOCIATES, INC. Slide 1 GOSSAMER COVE Redwood City, CA Illustrated Preliminary Defect List Presented By: R.H. ADCOCK / ARCHITECT.
Objectives : ANALYZE home maintenance techniques.
Readme slide for presentation Delete before use The following presentation is based on teaching the CAMT course using the CAMT Participant guide. It is.
New Mexico FFA Agricultural Mechanics Career Development Event Concrete and Masonry.
PHOTO. NO.DATE: 06/11/13 REVISIONS Construction Services 170 Long Lane Middletown, CT WESLEYAN U N I V E R S I T Y P MAJOR MAINTENANCE FY 14.
Residential Construction Unit 6 Interior finishes Mr. Todzia.
Wall Coverings  Selected according to: ○ Function ○ Size ○ Existing furnishings ○ Budget ○ Maintenance.
Chapter 14 Notes. Parquet – Mastic – Resilient (Flooring)– Joist – Terrazzo–
Chapter 11, Section 3. Interior Installation Installing a curtain rod Mounting Venetian blinds Mounting a window shade Hanging a picture.
How to update your kitchen for under $1,000. This is the before picture Here were some of the issues: –Kitchen has 30+ year old cabinets. The white dishwasher.
Project: Renovation Works at Ricci Hall at 93 Pok Fu Lam Road C Sub-basement Level VIEW 5 VIEW 3 VIEW 4 VIEW 2 VIEW 1 VIEW 6 PROGRESS PHOTO REPORT - 03.
Floor Treatments: Begin on page 279. Outline the pros and cons of each flooring treatment. Flooring MaterialsFloor Coverings Wood floors Tile floors (Ceramic,
INTD 59 intro to kitchen & bath design bathroom finishes & accessories.
Dry lining by direct bond – overview
HOW TO GUIDE PAINTING TECHNIQUES. CONTENTS INTRODUCTION EQUIPMENT AND MATERIALS LEARNING OUTCOMES CLASS PREPERATION THE WORKSHOP TEAM BUILDING STEP BY.
Finishing the Building
Objective 9.01: EXPLAIN the benefits of interior home care.
Drywall Theory. Dry Wall Saw Dry wall T-Saw Dry Wall Lift.
Freeman Athletic Center – Bacon Fieldhouse – North Elevation Scope, Typical for north, south and west elevations: Remove all existing horizontal and vertical.
Project: Renovation Works at Ricci Hall at 93 Pok Fu Lam Road C Sub-basement Level VIEW 5 VIEW 3 VIEW 4 VIEW 2 VIEW 1 VIEW 6 PROGRESS PHOTO REPORT - 04.
Plumbing Theory. DWV System The DWV Drain-waste- vent system in plumbing a system that removes sewage and greywater from the house/building and it also.
Floor Treatments: Begin on page 310. Outline the pros and cons of each flooring treatment. Flooring Materials Floor Coverings Wood floors Tile floors (Ceramic,
INTERIOR PAINT & DRYWALL REPAIR Identify the tools needed to paint interior ceilings & walls Learn to repair damaged drywall Learn how to prepare rooms.
By Angela Forte, Michelle Gagnon, Kerri Morse, & Sam Oosterman.
Basic Slide Show Under Tile Spooled Heating Installation Guide.
AUSTERVILLE RECTIFICATION PROJECT. PROJECT DETAILS 1148 OF DWELLINGS TO BE RECTIFIED BUDGETED AT R / UNIT TOTAL BUDGET R 96 million EXPECTED.
Installing A Bathroom Shower Panel American Bath Enterprises, Inc. The Bath Tub & Shower Enclosure Innovators!
Caulking, Drywall, Plaster, Orange Peel, Popcorn Ceilings, Locks, Tile Interior & Exterior Maintenance and Repair Course.
Chapter 23 Interior Repairs. Objectives Identify the major parts of a vehicle’s interior Remove and replace seats, seat covers, and carpeting Service.
Carpet, hardwood and tile Flooring Services in Greenville NC
Lighten Up! Single Window Kits Add Light and Appeal To Home Bathrooms.
Create decorative backsplashes, accent walls, or other focal points
Weber Tile Fixing.
Objective 4.02: CLASSIFY floor treatments
Grouting Armstrong Alterna Tile
Board Replacement for Floating Floors
Assembly And Installation Of Ikea Kitchen Cabinets
Objectives : ANALYZE home maintenance techniques
Objectives : ANALYZE home maintenance techniques
4.02 Floor Treatments.
4.02 Floor Treatments.
4.02 Floor Treatments.
4.02 Floor Treatments.
Luxe Plank Replacement
Both D bathrooms and e kitchen What makes you special!
INTD 503- Materials Topic: Wall Coverings
J bathroom/ hi bedroom/ I kitchen
A/B and h/i TIER back to back bathrooms
RISER PROJECT F bathroom.
C bathroom/AB and B Kitchens
Presentation transcript:

This was the existing floor Original floor in bathroom, 12” x 12” adhesive backed vinyl tiles

Existing Plastic Shower Surround Plastic tub surround removed to expose underlying wall. Damage can be seen in lower left. Prep included repairs here and scraping old yellow adhesive off surface. Kilz® was used as primer for plaster stabilization and tile installation. The old floor was left in place during tile work to absorb any damage occurring during tear- out and new tile install. A furniture pad was used to protect the tub.

Process 1. Line tub to prevent scratching 2. Remove old shower surround 3. Scrape loose plaster 4. Stabilize damaged plaster with oil based Kilz® 5. Using setting patch compounds repair and float walls 6. Allow to harden and dry 7. Install DalTile 4 ¼”x 4 ¼” ceramic tile and matching soap dish using latex based tile adhesive. 8. Grout tile following manufacturers directions 9. Caulk tub to wall joints, corners and around window

Flooring Install 1.Disconnect, drain, plunge and sponge dry toilet to lift 2.Place toilet to side on plastic and old towels or pad 3.Pull old loose tiles, cove base, transition at door etc 4.Install ¼” underlayment for smooth install surface 5.Install owners choice of sheet flooring with latex vinyl adhesive 6.Install new 4” cove base 7.Fit and install transition strip at door (aluminumn in this case) 8.Reset toilet with new wax ring and flange bolts, test for leaks 9.This install required trimming of door

End Product This is the final product of the tub/tile and floor redecoration for an inexpensive rental

Shower Finished