FUEL AND ASPHALT COST ADJUSTMENT PROVISIONS. Use of Cost Adjustment Provisions FHWA Technical Advisory Dec 10, 1980 –“Price volatility of construction.

Slides:



Advertisements
Similar presentations
HMA Warranties Seminar for CALTRANS Lee Gallivan FHWA Indiana Division April 3 rd, 2003.
Advertisements

A Look to the Future By: Pat Hughes, Dave Holt, and Ron Bumann.
Change Order Missouri Local Programs How to Complete a Change Order & Get it Approved.
Requirements for Federal Aid Project Contracts Kenneth Spear, Contracts & Estimates Engineer.
ASPHALT PRICE ADJUSTMENT PRICE ESCALATION IN THE 21 ST CENTURY.
Changes to Price Adjustment Provisions Division of Construction Management.
7-Year Pavement Warranties TEA, Omaha September 24, 2009 Paul Sosney Head Capital Award Ministry of Transportation Ontario.
USE OF POLYURETHANE GROUT FOR CONCRETE PAVEMENT SLAB STABILIZATION Indiana County District 10-0 Lessons Learned 1.
Alternate Bidding: The West Virginia Experience 2011Virginia Concrete Conference March 3, 2011 Richmond, VA Bob Long Executive Director ACPA Mid-Atlantic.
National IPA Fuel Agreement awarded by: City of Fort Worth, TX.
Asphalt Specification Changes July 2005 Contractor Asphalt Training Rich Hewitt, PE District Bituminous Engineer District Five Materials & Research.
John Boon ZUT November Procurement Systems The organisation of the interaction between the purchaser of a new building and the suppliers of goods.
Uniform Paving Platform Regional Asphalt Seminar, Blacksburg, VA March 12, 2015 David P. Shiells, P.E. District Materials Engineer.
Construction of LLP HMA Pavements Pre-bid Meeting Solano 80; 04-4A0104 District 4 Oakland, CA September 14, 2012 Bob Humer.
CONSTRUCTION & FINAL ESTIMATES ISSUES. Final Estimates Issues  Prep & Doc Manual-Updates  Review & Admin Manual-Updates  Other Final Estimates Issues.
Presentation to Barclay Owners November 21, 2013 Window Replacement Project Information Session.
Partnering & Pavement Preservation -A Contractors Perspective- AACE Meeting June 05, 2008 Mormon Lake, Arizona.
Alternate Bidding in Missouri Transportation Estimators Association Annual Conference November 2-4, 2005 – Daytona Beach, FL Interstate 44 … South-Central.
OneOffice has provisions to add Pay Items for modifications to the Contract by Supplemental Agreements, Change Orders and for work covered by Standard.
State Aid (SALT) prepares the Federal Agreements and the Amendments for  Force Account (FA)  Right of Way (ROW)  Preliminary Engineering (PE)  Construction.
Pavement Type Selection – Updated Guidance on Use of Alternate Bidding Virginia Concrete Conference Richmond, VA March 6, 2014.
FHWA Life Cycle Costs Analysis and Pavement Type Selection Guidance Maryland Concrete 2014 Conference March 18, 2014.
MAJOR REVISIONS TO THE POLICY FOR ACCOMMODATING UTILITIES ON HIGHWAY RIGHTS Presented By: Mark Attaway March 29, 2011.
1 Construction Cost Impacts Florida DOT Experience Greg Davis State Estimates Engineer Florida Department of Transportation Greg Davis State Estimates.
Community Facility Loans/Grants Architect Flow Chart Owner has need for project. RD Area Office is contacted. RD visits project site and discusses project.
Conventional Pavement Structure inches Graded Aggregate Base inches Asphaltic Concrete Paving Prepared Subgrade stress.
Life Cycle Analysis The ODOT Way 2003 Transportation Estimators’ Association Burlington, Vermont September 4, 2003 Jennifer McAllister TEA 2003 – LCCA.
RAP and RAS At DelDOT Karl Zipf, Chief Chemist DelDOT 2014.
1 Bid evaluation - Works  Clarification of bids ( if necessary)  Determination of responsiveness “Substantial” responsiveness No material deviations.
1 Chapter 5 Adjustable Rate Mortgages. 2 Overview Adjustable Rate Mortgages and Lender Considerations Interest Rate Risk of Constant Payment Mortgages.
Discussion Topics Construction Contract Administration Lessons Learned Other Construction Issues Questions? / Comments (Anytime)
Contracts for Make-to-Stock/Make-to-Order Supply Chains
1 Cost Escalation Mitigation Florida DOT Approach Greg Davis State Estimates Engineer State Estimates Engineer October 20, 2006.
The Market System Demand, Supply and Price Determination.
2010 Construction Contract Standards Training Part Standard Specifications November 2011.
Session #3 Asphalt 103- Materials: Basics of RAP, Usage and Specifications.
ACEC - August 5, ACEC/WisDOT Transportation Liaison Committee Quarterly Meeting Madison Club, Madison PROJECT ESTIMATING ACEC/WisDOT Transportation.
Go CATS!!!. KAHC-KYTC Joint Meeting March )Construction Information on Web 2)Formal Acceptances 3)Final Pay Estimates 3\16\07.
PennDOT’s 2010 Program Rebecca S. Burns, P.E. Acting Director Bureau of Construction and Materials 11 th Annual Pennsylvania Concrete.
HBP Warranties – The Cost Benefit Evaluation Begins By: Jay Goldbaum, P.E. Colorado Department of Transportation Pavement Management and Design Program.
Trivia Certification Program Trivia Mark Foster ODOT Region 1 Liaison and Federal Aid Specialist March 12, 2010.
Alternate Bid on Pavement Projects Overview Keith Shannon Director, Office of Materials and Road Research Mn/DOT – ACEC Annual Consultant Conference March.
CONTRACT PRICING ALTERNATIVES Presented by: Fahad H. Al-Anazi CEM 520 February 27,1999.
CE 366 PROJECT MANAGEMENT AND ECONOMICS Robert G. Batson, Ph.D., P.E. Professor of Construction Engineering The University of Alabama
Basis of Estimates Part 1 Introduction Melissa Hollis Engineering Systems Support State Specifications and Estimates Office June 2012.
RMR Task Force Decision Points for ERCOT Technical Advisory Committee April 3, 2003.
Paving the way for over 60 years Presentation at the January 10, 2007 NCAUPG Technical Conference By Dusty Ordorff Bituminous Roadways, Inc.
Crude Oil, Heating Oil, and Propane Market Outlook Briefing for the State Heating Oil and Propane Program Conference Kennebunkport, ME by Douglas MacIntyre.
WEDGEWOOD COVE HOA STREET PAVING/RESURFACING PROJECT.
Chapter 23 Purchasing Section 23.1 The Role of the Buyer Section 23.2 The Purchasing Function Section 23.1 The Role of the Buyer Section 23.2 The Purchasing.
HMA Warranties The Wisconsin Experience Presentation to the California Department of Transportation.
Pavement Preservation Program Emily McGraw, PE February 23 and 24, 2015 – NCDOT & CAPA Workshop.
Chapter 8 Swaps. © 2013 Pearson Education, Inc., publishing as Prentice Hall. All rights reserved.8-2 Introduction to Swaps A swap is a contract calling.
1 EASTERN MUNICIPAL WATER DISTRICT Temecula Valley Regional Water Reclamation Facility 23-MGD Expansion Project Joe Mouawad, P.E. Senior Director.
John Donahue, P.E. Missouri DOT 5 th Annual Building Green with Concrete Workshop June 21, 2012.
CAPA 66 th Annual Meeting – April 22, Fiscal Update Staffing Funding Lettings 2.
Quantity Calculations Module 3. Quantity Calculations  Specifications  Post Bid Quantity Calculations  Production Quantity Calculations –Checking Yield.
Indiana Experience with Water Injected Foaming Device Rick Flint
David P. Shiells, P.E. District Materials Engineer
Update from FHWA Emulsion Task Force
Runway Rehabilitation: Award of construction contract and acceptance of 3 grants Resolution June 22, 2009.
Bills of Quantities Introduction to FIDIC - Bills of Quantities -
Contract Award Procedures
Presenters: Sumon Roy1 and Badrul Ahsan1
Commuter Rail Operations Revised Diesel Fuel Contract Award
New Specifications for 2017
Pavement Type Selection – Updated Guidance on Use of Alternate Bidding
Driving Indiana’s Economic Growth Bidding Alternate Pavement Designs
Hoops, haddock, cascade, oriole, Ervin and valley view heights paving
ACEC Designer Training
Presentation transcript:

FUEL AND ASPHALT COST ADJUSTMENT PROVISIONS

Use of Cost Adjustment Provisions FHWA Technical Advisory Dec 10, 1980 –“Price volatility of construction materials and supplies …. Can result in significant problems for contractors in preparing realistic bids.” –“This leads to price speculation and inflated bid prices to protect against possible price increases.”

Development of Cost Adjustment Provisions Price adjustments should apply for both upward and downward movement of prices Price adjustments should be based on an index or other economic barometer which is not susceptible to manipulation Price adjustments should be “Triggered” only by a significant change in the index base price

Development of Cost Adjustment Provisions Price adjustment computations should be performed at specified intervals rather than as each change in price occurs. Monthly is suggested. The 1980 Tech advisory recommended against optional selection of cost adjustment provisions but FHWA later stated “Since all bidders have the same option, this is consistent with competitive bidding principles”

Fuel Cost Adjustment Provisions Fuel is typically an incidental cost to the a project A methodology for basis of payment must therefore be determined CDOT methodology is Fuel Usage per Unit method –This estimates the amount of fuel used in various units of work under average conditions Fuel factors were developed in cooperation with Colorado Contractors Association

2001 CDOT Fuel Cost Adjustment Specification First implemented on May 31, 2001 – Not optional –Index was the spot price per barrel of West Texas Intermediate crude oil as posted in the Wall Street Journal –Trigger was 10% –Payment was based on the increased pay quantities for three items Excavation – 0.29 Gal/CY HBP – 1.06 Gal/Ton Concrete Pavement – 0.03 Gal/SY/Inch Thickness

Revised November 2005 Revised November 14, Optional –Index was still the spot price per barrel of West Texas Intermediate crude oil as posted in the Wall Street Journal –Trigger was left at 10% –One more item was added: Aggregate Base Course – 0.29 Gal/CY

Revised Again November 2006 Revised on November 30, 2006 – remained an option to the contractor –Index was revised to Opis Denver # 2 Diesel –Trigger was revised to 5% –Additional items were added –Fuel factors were revised

Revised Again November 2006 Items now include: –Removal of Asphalt – Gal/SY/Inch depth –Excavation, Embankment, Borrow – 0.29 Gal/CY –Excavation (Rock) – 0.39 Gal/CY –Structure Excavation – 0.29 Gal/CY –Aggregate Base Course – 0.85 Gal/CY (convert Tons to CY Tons/CY) –Lime Treated Subgrade – 0.12 Gal/SY –Full Depth Reclamation – 0.06 Gal/SY –HMA & SMA – 2.47 Gal/Ton –Heating & Scarifying – 0.44 Gal/SY –Cold Bituminous Pavement Recycle – 0.01 Gal/SY/Inch depth –Concrete Pavement – 0.03 Gal/SY/Inch depth

WYDOT Fuel Adjustment Specification Optional for all WYDOT Projects Based on Index Prices posted by WYDOT on the Web Page. Index is from OPIS. Contains a ± 7.5% “Buffer” area Adjustments are Positive and Negative

WYDOT Fuel Adjustment Specification Contractor submits Affidavit (Form E-12) with their signed contract Establish % of Contract for Fuel items –Based on affidavit and original contract total –Computed: (Affidavit Cost/Original Contract Cost) x 100% –For each product (Unleaded, Diesel, Burner) –Will remain the same for the life of the contract

Affidavit of Fuel Cost for Project

WYDOT Fuel Adjustment Specification Unleaded and Diesel Fuels eligible for adjustment at every Estimate Burner Fuels eligible for adjustment only on those Estimates where paving or crack sealing happened

WYDOT Fuel Adjustment Specification Adjustments are made only when the index price changes by more than 7.5% –Base Fuel Index (BFI): established previously –Current Fuel Index (CFI): price for month prior to the date of the Estimate

WYDOT Fuel Adjustment Specification If an adjustment is warranted, it will be computed: %Contract x Estimate Amount x (Change±0.075) Adjustments are made on each Estimate

2009 ??? CDOT and CCA have had discussions regarding revising the Fuel Cost Adjustment specification again. CCA is currently researching fuel factor data for the existing items and any additional items they may wish to request

CDOT Asphalt Cement Cost Adjustment Joint Task Force with CDOT, FHWA and CAPA worked to develop a specification First implemented in 2007 as a pilot project as an option to the Contractors on 6 projects Index was the spot price per barrel of Western Canadian Select Crude Oil as published by Encana Trigger was 5% Payment based on the quantities for HMA and SMA

CDOT Asphalt Cement Cost Adjustment In 2007 none of the Contractors “opt’d In” and no data was gathered In 2008 the specification was again offered as a pilot until July. In July 2008 as a response to the asphalt cement price volatility CDOT implemented the Asphalt Cement Cost Adjustment specification as a Standard Special Provision on all projects with HMA or SMA. The cost adjustment specification is mandatory, not at the contractors option. No change in the index or trigger from the pilot specification has been made.

WYDOT Adjustment for Performance Graded Asphalt Binder Current Specification implemented in 2009 –Reaction to extreme escalation in price –Also reaction to supply issues within the state Includes adjustment for Chip Seal oils

WYDOT Adjustment for Performance Graded Asphalt Binder Mandatory for all WYDOT Projects with PG Binders and Chip Seal oils Based on Index Prices posted by WYDOT on the Web Page. Index based on wholesale prices. Contains a ± 10% “Buffer” area Adjustments are Positive and Negative

WYDOT Adjustment for Performance Graded Asphalt Binder The Contractor provides an Affidavit (Form E-14) and a confidential bid price at the beginning of the project.

Affidavit of PGAB Price

WYDOT Adjustment for Performance Graded Asphalt Binder Adjustments are made only when the index price changes by more than 10% If an adjustment is warranted, it will be computed: $$ = (PPI-BPI) x 0.90 x Tons of Binder Adjustments are made on each Estimate

WYDOT Adjustment for Performance Graded Asphalt Binder Additional adjustments are allowed for projects that go beyond one construction season. Adjustment is based on Confidential Bid Price received from the Contractor (AAF) If an adjustment is warranted, it will be computed: $$ =AAF x (PPI-BPI) x 0.90 x Tons of Binder

Sharing of the Risk Cost adjustment specifications not designed for the DOT to assume all of the risk –Contractors still have to bid risk at least up to the trigger –Also have to consider downward movement of the price –CDOT index still based on crude oil price, not asphalt cement price, as requested by CAPA –Cost adjustment only on HMA or SMA, not emulsified items

Sharing of the Risk DOT’s advertise projects in winter to allow contractors and suppliers to plan their work for the next construction season –The longer the period between bid and actual construction the greater the risk the index will fluctuate – the greater the risk to both parties

WYDOT Specifications and Forms Specifications 1.Information Central 2.Manuals and Publications Standard Specifications 4.Supplemental Specifications Forms & Index Prices 1.Working With WYDOT 2.Contractor Information 3.Contractor Forms or 3.Base Index Prices

Questions? Mark W. Ayen P.E. WYDOT Construction Staff Engineer Dennis Largent, P.E. Project Development Branch, Area Engineer