Network Inventory Conceptual Framework Tony Breach, Optical Network Manager 6. februar 2014.

Slides:



Advertisements
Similar presentations
Automotive Embedded System Development in AUTOSAR
Advertisements

Circuit Monitoring July 16 th 2011, OGF 32: NMC-WG Jason Zurawski, Internet2 Research Liaison.
Richard The Management Model of the Centralized Network Architecture IETF 75th meeting, Stockholm draft-richard-opsawg-cna-mib-00.
Lantech Pioneering Industrial and IP Networks TM Lantech-View Pro Network Management System.
RiT PatchView Solution
Chapter 3: Planning a Network Upgrade
ICS 434 Advanced Database Systems
Knowledge Pathways in IT
Mr C Johnston ICT Teacher
Merit Consulting Terje Myrseth MUA – October 2008.
1 Web Servers / Deployment Alastair Dawes Original by Bhupinder Reehal.
Nada Abdulla Ahmed.  SmoothWall Express is an open source firewall distribution based on the GNU/Linux operating system. Designed for ease of use, SmoothWall.
EU-GRID Work Program Massimo Sgaravatto – INFN Padova Cristina Vistoli – INFN Cnaf as INFN members of the EU-GRID technical team.
Network Management Overview IACT 918 July 2004 Gene Awyzio SITACS University of Wollongong.
IS Network and Telecommunications Risks
UPnP Device Management Andre Bottaro France Telecom Group UPnP DM co-chairman End User Device Management panel Sunday, January 11th, 2009 CCNC'09.
1 Version 3.0 Module 8 Virtual LANs. 2 Version 3.0.
CS 337 Project Presentation Asset Management and Tracking Developers: –Jimmy Hoo –Edwin Panameno –Manuel Segura –Sheng-Tian Lin Customers –Alexandre Lomovtsev.
Copyright © 2003 Americas’ SAP Users’ Group How to Implement Supplier Performance Management Using BW, SEM, and SRM Paul Halley Director, SEM Consulting.
Enterprise Total Computing TECHNOLOGY SERVICES Sprint Proprietary Information 18/10/99 Slide 1 Sprint’s Early Interest in TINA-C.
Today’s Agenda New Hardware Setup of RoboRIO
IS Fall 2009 Chapter 3 9/2/2009. Epidemics and Health H1N1 – Younger are more at risk – Easily spread in crowds (like classes) Two of your lowest.
Installing software on personal computer
Database Administration Chapter 16. Need for Databases  Data is used by different people, in different departments, for different reasons  Interpretation.
These materials are licensed under the Creative Commons Attribution-Noncommercial 3.0 Unported license (
These materials are licensed under the Creative Commons Attribution-Noncommercial 3.0 Unported license (
Cloud computing is the use of computing resources (hardware and software) that are delivered as a service over the Internet. Cloud is the metaphor for.
Net Optics Confidential and Proprietary Net Optics appTap Intelligent Access and Monitoring Architecture Solutions.
Semester 1, 2003 Week 7 CSE9020 / 1 Software Testing and Quality Assurance With thanks to Shonali Krishnaswamy and Sylvia Tucker.
Current Job Components Information Technology Department Network Systems Administration Telecommunications Database Design and Administration.
Location Based Speed Dating Mobile Service. Presentation Overview Project Description Aims and Objectives Progress to date Remaining Work.
Software Aspects of PQ in a DG Context By Dr. Siri Varadan.
S305 – Network Infrastructure Chapter 6 Local Area Network.
1 Mars Rover Ground Control Team Design Review Report Week 3 Tim Hermann - Ben Davini - Jose Angulo - Ryan Morton CPE450 Winter
Fiber Optic Network Solutions. Aware of the growing optical fiber network market, TELE DESIGN has developed FiberDoc, a documentation system for this.
© 2007 Cisco Systems, Inc. All rights reserved.Cisco Public ITE PC v4.0 Chapter 1 1 Operating Systems Networking for Home and Small Businesses – Chapter.
Using NAS as a Gateway to SAN Dave Rosenberg Hewlett-Packard Company th Street SW Loveland, CO 80537
Database Administration
Review 2 Chapters 4, 5, 6. What is the Internet? Global network, a network of networks.
OHT 15.1 Galin, SQA from theory to implementation © Pearson Education Limited 2004 Templates The contribution of templates to software quality The organizational.
RCE Platform Technology (RPT) Mark Arndt User Support.
Chapter 8: Installing Linux The Complete Guide To Linux System Administration.
By Douglas Copas and Mark Perry.  Currently available small business based commercial inventory management systems are either prohibitively expensive.
1 Chapter Overview  Network Cables  Network Interface Adapters  Network Hubs.
APRIL 10, Meeting Agenda  Prototype 2 Goals  Robust Connections Demo  System Diagnostics Tool Demo  Final Prototype Risk Mitigation  Final.
APRIL 10, Meeting Agenda  Prototype 2 Goals  Robust Connections Demo  System Diagnostics Tool Demo  Final Prototype Risk Mitigation  Final.
1 Sean Aluoto Anthony Keeley Eric Werner. 2 Project Plan Overview Project Lifecycle model Time line Deliverables Organization plan Risk management Design.
SEPTEMBER 8, 2015 Computer Hardware 1-1. HARDWARE TERMS CPU — Central Processing Unit RAM — Random-Access Memory  “random-access” means the CPU can read.
Intro to the Atlas Platform Raja Bose Dr. Abdelsalam (Sumi) Helal January 23, 2007.
Scientific Linux Inventory Project (SLIP) Troy Dawson Connie Sieh.
Technician Table Editor Company: DVTel Academic advisor: Professor Ehud Gudes Technical advisor: Menny Even Danan Team: Olga Peled Doron Avinoam.
SBS Alert Web Console Senior Design 3 – February 28, 2005 Debra Sweet Barrett.
Supporting quality devices
Database System Concepts and Architecture
Introduction to Telecommunications
Multilevel Marketing Tree Viewer
Wireless Communications Test Bed: Ad Hoc Networking
CORPORATE PROFILE JUNE 2016
NTC 405 Education for Service-- snaptutorial.com.
NTC 405 Teaching Effectively-- snaptutorial.com
Networking for Home and Small Businesses – Chapter 2
Department of Computer Science Course : Pre Computer Skills
Networking for Home and Small Businesses – Chapter 2
Web Servers / Deployment
Networking for Home and Small Businesses – Chapter 2
Networking for Home and Small Businesses – Chapter 2
Networking for Home and Small Businesses – Chapter 2
Salesforce.com Salesforce.com is the world leader in on-demand customer relationship management (CRM) services Manages sales, marketing, customer service,
Field installable, upgradeable and scaleable
Presentation transcript:

Network Inventory Conceptual Framework Tony Breach, Optical Network Manager 6. februar 2014

Network Inventory - Index Requirements Project Manager Objective Supplier Inv. and Analysis Project Timeline Decision making basis

Project Manager Project Manager: Heino Radmer Project Team Heino Radmer Sören Westerberg NU-NOC Member Members that contribute to this project Lars Bjørn Mick Krag

BOL Objective Base Objective Topology – Physical/Logical Hardware – Active/Passive Connectivity – Fibers/Cables/Wireless Sites Software/Firmware Versions

End Objective Device and physical network topology – including automatically device topology discovery Software and firmware package management Real time End to End Logical topology including logical end user connection representation Device diagnostic log for tracking of degeneration in hardware components Network Resource Management Device, card, port utilization for maintenance and network planning End to end logical utilization Dynamical interaction with the Service Assurance and Provisioning engine Simulation and planning tools

Requirements BOL System Data container will be Excel to MYSQL How to access and Query – via Excel End System Data container MYSQL How to access and Query – Web based GUI GUI, Query, Presentation TB – Web based GUI, Table and graphic presentation of Circuits etc. Possible for open queries Data Structure Based on Heinos Network Inventory Structure Synchronisation of Data with Live Network Automatic, Semi Automatic, Manual

Supplier Investigation and Analysis Alcatel-Lucent Workshop Investigate the supplier market for NIs Look for co-operational NIs to Service Assurance Systems

Decision Making Basis Project Objective, Project description Benefits for NN Price Resources internal/external Implementation Timeline Operation Responsibility

Timeline Project start Vendor Workshop and presentations week 11 Decision Making Basis week 12 Installation Start Base System Project end Base System KPIs NN Transmission 100% ready date NN IP 75% ready date SUNET Transmission 80% ready date SUNET IP 50% ready date