Task Behavior of Shear Walls

Slides:



Advertisements
Similar presentations
PARKVIEW APARTMENTS 20 Unit Rehabilitation & Site Work ISLA VISTA, CA. Joint Cities-County Affordable Housing Task Group October 23, 2008.
Advertisements

The CUREe-Caltech Woodframe Project UCI Task Diaphragm Connections Gerard C. Pardoen, UC Irvine Seb J. Ficcadenti, F&W CSE Tom A. Castle, F&W CSE.
TASK SHAKE TABLE TESTS OF A TWO-STORY HOUSE Andre Filiatrault David Fischer Bryan Folz Chia-Ming Uang Frieder Seible CUREe-Caltech Woodframe Project,
Wood Structural Panels
Constructions of Large-panel Buildings in Vilnius
2006 Residential Code of Ohio
Carpentry Skilled Trades Ceiling and Roof Framing The most commonly used types of residential roof and ceiling construction are: Joist and Rafter.
Mechanics Based Modeling of the Dynamic Response of Wood Frame Building By Ricardo Foschi, Frank Lam,Helmut Prion, Carlos Ventura Henry He and Felix Yao.
April 21, 2010 Barbara C. Jordan Elementary School Update Presented by.
80" 6'8" Exterior 36" Interior 28-32" Inside Outside 36-48"
Copyright © by the NCCER, Published by Pearson Education, Inc. Core Curriculum: Introductory Craft Skills Module National Center for Construction.
Timber Structures Sawn Lumber Glulam Plywood.
Project #4 Energy Dissipation Capacity of a Wood-frame Shear Wall CEE Numerical Analysis.
Bathroom plan layout Variation of layouts.
Annual Meeting Montréal September 26, 2009
Instrumented Moment Frame Steel Buildings Models Erol Kalkan, PhD California Geological Survey PEER-GMSM First Work Shop, Berkeley Oct
Monitoring Structural Response to Earthquakes using Wireless Sensor Networks Judith Mitrani June 18, 2002.
Seismic Performance Assessment of Flat Plate Floor Systems John W. Wallace, Ph.D., P.E. Thomas Hyun-Koo Kang, Ph.D. Student Department of Civil and Environmental.
Structural Insulated Panel System Chapter 15. Mehta, Scarborough, and Armpriest : Building Construction: Principles, Materials, and Systems © 2008 Pearson.
Integrated Civil Engineering Design Project (Building Structure Design Example) CIVL 395 HKUST By : Ir. K.S. Kwan Date: 4/07.
The Floor Plan 1.
Direct Displacement Design Methodology for Woodframe Buildings
2015 ALL CITY BOYS SOCCER FIRST TEAM Presented to: NAME GRADE, SCHOOL JOHN A. AGUIRRE COMMISSIONER, CIF LOS ANGELES CITY SECTION.
Issue Team Recommendations for Wood & CFS
Villanova University Dept. of Civil & Environmental Engineering CEE Capstone II Structural Engineering 1 CEE Capstone II Structural Engineering.
Ceiling Framing Unit 32.
Shear Walls Section 3.
2015 ALL CITY BOYS BASKETBALL FIRST TEAM Presented to: NAME GRADE, SCHOOL JOHN A. AGUIRRE COMMISSIONER, CIF LOS ANGELES CITY SECTION.
2015 ALL CITY SOFTBALL: DIVISION I FIRST TEAM Presented to: NAME GRADE, SCHOOL JOHN A. AGUIRRE COMMISSIONER, CIF LOS ANGELES CITY SECTION.
2015 ALL CITY BOYS VOLLEYBALL: DIVISION I Presented to: NAME GRADE, SCHOOL JOHN A. AGUIRRE COMMISSIONER, CIF LOS ANGELES CITY SECTION.
BUILDING THE FRAME Walls are constructed in sections, lying down on the floor platform and then tilted up into position. Fundamentals of Building Construction,
Cruising Manual Highlights Ministry of Forests & Range 2009.
Kiasu Project Guidelines for writing. INTRODUCTION Start broad and work down to specific hypotheses Contextualize the research (e.g., achievement motivation,
DRAFTING and DESIGN TECHNOLOGY This program is available to all students grades 9 through 12.
Wall and Ceiling Construction
Creating a Layout sheet. Sketching  Key Terms & Definitions  Mechanical Drafting: Drawings are created using mechanical instruments. Layout Sheet: consists.
Engineering with Wood Presenters: David W. Boehm, P.E. Gary Sweeny, P.E. Gary Sweeny, P.E. Shear Walls and Diaphragms Why Buildings Don’t Fall Over.
T-Stub Connection Component Tests James A Swanson and Roberto T Leon School of Civil and Environmental Engineering Georgia Institute of Technology Atlanta,
Villanova University Dept. of Civil & Environmental Engineering CEE 3704 Statistical and Numerical Analysis 1 Group Project #2 Energy Dissipation Capacity.
Kiasu Project Guidelines for writing. Abstract = 2 Describe study, participants, method, results, implications.
On-line Sorting Technologies for CCA Treated Wood Sarasota Team Meeting February 27, 2001.
1 CHAPTER 7 IRC WALL COVERING. 2  701 GENERAL  702 INTERIOR COVERING  703 EXTERIOR COVERING.
Biobehavioral Health Building The Pennsylvania State University Daniel Bodde Structural Option Advisor – Heather Sustersic.
College Career Ready Conference Participants will  Review components of the Grade 3 and the Grades 4 and 5 Condensed Scoring Rubric for Prose Constructed.
Build your own seismograph Alan Kafka, Boston College Michael Hubenthal, IRIS.
Build your own seismograph Alan Kafka, Boston College Michael Hubenthal, IRIS.
Competency: Draw wall sections and details
Project Acoustic Panel. Presonus is diversifying into a new product line: acoustic panels for home studios. Market – Owners of home recording.
QUAKE SUMMIT 2012, Boston, July 12, 2012
Upon completion of this module, you will be able to:
Active Learning Lecture Slides
Do Now #7 What are the dimensions of the footing?
w (plf) diaphragm 1 diaphragm 2 R1L R1R R2L R2R v1R v1L v2L v2R SW2 C1
Construction Documents
Competency: Draw wall sections and details
Roller Coaster Overview
Drawing Interpretation
Lumber in a house You will need 3 sheets of lined paper
An Easy to Use Menu Type Approach for Determining the Fire Resistance of Wood Stud Area Separation Walls GORDON D. FELLOWS ____________________________________________.
Competency: Draw wall sections and details
Assignment #3 Group 3.
WESLEYAN P-2-1 MAJOR MAINTENANCE FY CROSS STREET
Chapter Eleven Quality and Assurance. Chapter Eleven Quality and Assurance.
Simplify the following ratio to it’s lowest terms.
Common Components of a Traditional Wood Framed Building
Essential Question: How do you construct a data table?
Wall and Ceiling Construction
How can one measure intelligence?
WESLEYAN P-13-1 MAJOR MAINTENANCE FY HOME AVENUE
Presentation transcript:

Task 1.4.4 Behavior of Shear Walls Gerard C. Pardoen University of California, Irvine University of California, Irvine

1.1.2 Multi-Story Apartment Building Research Plan 1.1.1 Single-Family House 1.1.2 Multi-Story Apartment Building 1.1.3 Simplified Model University of California, Irvine

University of California, Irvine Task 1.4.4 – Shear Walls * Objectives: - Improve understanding of the cyclic behavior of full-scale shear walls of different construction - Expand upon City of Los Angeles project at UC-Irvine - Correlate with Task 1.1.1 Shake Table Tests * 46 samples: 16’ x 8’, 6.5’ x 8’, 3’ x 8’ * Two large scale multi-story wall tests - 16’ x 17’ * Main test variables: - Gravity loads, nail types, grade of framing lumber, staples, hold-downs, aspect ratio University of California, Irvine

Exterior, Interior Shear Walls University of California, Irvine

University of California, Irvine Shear Wall Test Matrix University of California, Irvine

University of California, Irvine 16’ x 8’ OSB Shear Wall University of California, Irvine

University of California, Irvine 6.5’ x 8’ OSB Shear Walls University of California, Irvine

University of California, Irvine 3’ x 8’ OSB Shear Walls University of California, Irvine

16’ x 8’ Stucco/GWB Shear Wall University of California, Irvine

University of California, Irvine Two-Story Shear Wall University of California, Irvine

Two-Story Shear Wall w/ Openings University of California, Irvine

University of California, Irvine CUREe Test Protocol University of California, Irvine

University of California, Irvine 11,440 lbs 9,150 lbs D = 2.17” = 0.6*3.62” 3.62” University of California, Irvine

University of California, Irvine

University of California, Irvine

University of California, Irvine

University of California, Irvine

University of California, Irvine

University of California, Irvine

Monotonic Test Results University of California, Irvine

University of California, Irvine Project Status * Update Preliminary Literature Review - 100+ reports, papers categorized in 9 sections * Revised Test Schedule - Monotonic tests: December ‘00 Three representative 16’ x 8’ Task 1.4.4 configurations - Cyclic tests: January - May * Review Instrumentation Layout - Record forces/deformations consistent with shake table tests University of California, Irvine