IMMW14, Ferney Voltaire, 26-29 September 2005 (slide 1/35) Experience with configurable acquisition software for magnetic measurement.

Slides:



Advertisements
Similar presentations
3/17 Dividend Street, Mansfield, 4122, Queensland, Australia phone: web: The SuperCycler A Software.
Advertisements

. TYPICAL SUPERCONDUCTING MAGNET TEST SEQUENCE. PREPARATORY TESTS AT ROOM TEMPERATURE Lyre Test: Simulate Effect of Thermal Contraction in Cold condition.
CIMCO Integration Software Products
Blue Eye T E C H N O L G Y.
(Use space bar to step through presentation)
Booster Main Bending Magnet Test in SM18. Why The energy upgrade of the PS Booster main bending magnet requires endurance tests at high current (≈12 kA)
Peter Chochula, January 31, 2006  Motivation for this meeting: Get together experts from different fields See what do we know See what is missing See.
Supervision of Production Computers in ALICE Peter Chochula for the ALICE DCS team.
TEMPLATE DESIGN © Bluetooth Login Key RIT Computer Engineering Senior Design Project Tim Wesley, Dan Chen Spring 2009.
SNS Integrated Control System SNS Machine Protection System EPICS Workshop April 27, 2005 Coles Sibley.
Brian Martlew 25 th Sept 2006 MICE Control & Monitoring Plan Brian Martlew.
Isabelle Laugier, AT/VAC/ICM Section February 7 th 2008.
DCS LEB Workshop ‘98, Rome, Detector Control System, H.J.Burckhart,1 Detector Control System H.J Burckhart, CERN u Motivation and Scope u Detector and.
Overview of Data Management solutions for the Control and Operation of the CERN Accelerators Database Futures Workshop, CERN June 2011 Zory Zaharieva,
Professional Informatics & Quality Assurance Software Lifecycle Manager „Tools that are more a help than a hindrance”
DEMONSTRATION FOR SIGMA DATA ACQUISITION MODULES Tempatron Ltd Data Measurements Division Darwin Close Reading RG2 0TB UK T : +44 (0) F :
Made in United States of America EMIT SIM emit.descoindustries.com Rev:
Automatic Software Testing Tool for Computer Networks ARD Presentation Adi Shachar Yaniv Cohen Dudi Patimer
1 / 19 M. Gateau CERN – Geneva – CH 14th International Magnetic Measurement Workshop September 2005, Geneva, Switzerland.
8/21/2015J-PARC1 Data Management Machine / Application State Data.
Introduction to Computers Personal Computing 10. What is a computer? Electronic device Performs instructions in a program Performs four functions –Accepts.
LHC Magnet Tests: A challenge for an OperationTeam V. Chohan G.H. Hemelsoet CernGeneva Always set the trail, never follow the path.
Calo Piquet Training Session - Xvc1 ECS Overview Piquet Training Session Cuvée 2012 Xavier Vilasis.
W. Sliwinski – eLTC – 7March08 1 LSA & Safety – Integration of RBAC and MCS in the LHC control system.
15 Copyright © 2005, Oracle. All rights reserved. Performing Database Backups.
SCADA Systems - What is the scope of this talk? What are SCADA systems? What are their structure and main features? How open are they? How are they evolving?
SCADA. 3-Oct-15 Contents.. Introduction Hardware Architecture Software Architecture Functionality Conclusion References.
Copyright © 2007, Oracle. All rights reserved. Managing Concurrent Requests.
ITER – Interlocks Luis Fernandez December 2014 Central Interlock System CIS v0.
All rights reserved, property and © CAD Computer GmbH & Co.KG 2009 Cover page.
Local Alarm Station Data Acquisition, Storage and Visualization for Radiation Portal Monitor (RPM).
André Augustinus 10 September 2001 DCS Architecture Issues Food for thoughts and discussion.
Operational tools Laurette Ponce BE-OP 1. 2 Powering tests and Safety 23 July 2009  After the 19 th September, a re-enforcement of access control during.
FAIR Accelerator Controls Strategy
A.Golunov, “Remote operational center for CMS in JINR ”, XXIII International Symposium on Nuclear Electronics and Computing, BULGARIA, VARNA, September,
AT Measurement Systems
1 UNICOS PVSS Evolution Cryogenics Control Enrique BLANCO Industrial Controls & Electronics Group.
Cscape EnvisionRV Horner APG, LLC. EnvisionRV - What Does it Do? Allows viewing and interacting with remote OCS controllers. The PC displays screens that.
E. Gorskaia, P. Ferreira, A. Raimondo, H. Reymond, A. Rijllart NI-Days 2000, CERN Geneve, 26 October 2000 The Control Architecture for the LHC Dipole Series.
Cscape EnvisionFX Horner APG, LLC March 7, EnvisionFX - What Does it Do? Graphical interface allows easy transfers of data to and from the PC and.
Magnetic Measurement Systems for the LHC Dipole Assembly Companies A. Rijllart, J. Billan, J. Garcia-Perez, D. Giloteaux, A. Raimondo, V. Remondino, H.
11 th February 2008Brian Martlew EPICS for MICE Status of the MICE slow control system Brian Martlew STFC, Daresbury Laboratory.
CEA DSM Irfu SIS LDISC 18/04/2012 Paul Lotrus 1 Control Command Overview GBAR Collaboration Meeting Paul Lotrus CEA/DSM/Irfu/SIS.
TC A.R What can we learn / re-use of the String2 and MTB DAQ and data analysis? Adriaan Rijllart AB/CO/IS String 2 and Magnet.
MPP 4 th March - 1v0 CERN MPP CERN MPP SMP Team 3.
Introduction To Computers
The Control System for the LHC tunnel cryogenics Controlling Cool Accelerators Controle da Criogenia de Aceleradores de Partículas Dr. Paulo Gomes CERN.
T EST T OOLS U NIT VI This unit contains the overview of the test tools. Also prerequisites for applying these tools, tools selection and implementation.
TE/TM 30 th March - 0v1 CERN MPP SMP 3v0 - Introduction 3 *fast *safe *reliable *available generates flags & values.
Database Issues Peter Chochula 7 th DCS Workshop, June 16, 2003.
MARCO control system Munich Lukasz Zwalinski – PH/DT Maciej Ostrega – PH/DT.
19 Copyright © 2004, Oracle. All rights reserved. Database Backups.
Run the on your PC to start the firmware configuration process Run IP Config Tool.
Sequencia Partner Tools 20 Minute OpenBatch Review Page: 1 3_21_ISA8895_Function_PhysicalProcessCont rol_OpenBatch_v2_en.pptx.
20OCT2009Calo Piquet Training Session - Xvc1 ECS Overview Piquet Training Session Cuvée 2009 Xavier Vilasis.
C. Kiesling, 11th B2GM PXD Session, KEK, March , Slow Control System for the PXD PXD Support Systems & Control UNICOS Standard PVSS User Interface.
Vacuum Controls framework for the LHC and its injectors Sebastien Blanchard CERN TE-VSC Integration of controllers in SCADA using OPC Server Goal: Improve.
TEST FACILITY STATUS FOR TESTING CERN Marta Bajko WP10. EUCARD 2 Task 4 - HTS Magnet Tests, June 2015.
AB-CO Review, 23 September 2005 L. Walckiers AT-MTM p. 1 Project description  To maintain for LHC completion  Magnet Rescue Activities [MAR]  Support.
Sequencia Partner Tools 20 Minute OpenBatch Review 20 Minute OpenBatch Review Page: 1 3_21_ISA8895_Function_PhysicalProcessControl_OpenBatch_v2_en.pptx.
SNS Integrated Control System ORACLE –JERI DB Generation April 27, 2004 Coles Sibley Jeff Patton.
LHC Post Mortem Workshop - 1, CERN, January 2007 (slide 1/52) AB-CO Measurement & Analysis Present status of the individual.
Local Alarm Station Data Acquisition, Storage and Visualization for Radiation Portal Monitor (RPM).
EN-ICE Technical Committee SM18 activities & projects
Classroom Attendance System
Cover page.
Review of hardware commissioning
TRAINING SESSION LEVEL-1
Presentation transcript:

IMMW14, Ferney Voltaire, September 2005 (slide 1/35) Experience with configurable acquisition software for magnetic measurement M Gateau, M Marchesotti, A Raimondo, A Rijllart, H Reymond 1.Introduction 2.SM18 test benches facility 3.Test Master 4.Hardware Recognition System 5.Automation of the magnetic measurements 6.Conclusions

IMMW14, Ferney Voltaire, September 2005 (slide 2/35) Introduction SM18

IMMW14, Ferney Voltaire, September 2005 (slide 3/35) Mandate of the magnet test facility: dipoles quadrupoles have to be cold tested at CERN - 12 benches built, organized in 6 clusters of 2 benches (SM18 building) - Wide range of local (per cluster) or shared (mobile rack) equipments - Magnet presence on the bench VS number of tests to execute Introduction

IMMW14, Ferney Voltaire, September 2005 (slide 4/35) Constraints for the tests & measurements: - Several applications have been developed to assist the tests and measurements - Fast and easy setup of the applications - Taking into account specific calibration of the used devices - Limit as much as possible the manual edition of the configuration files - Traceability of the used equipments is requested by the QA rules Introduction

SM18 test benches facility IMMW14, Ferney Voltaire, September 2005 (slide 5/35) The hardware side … Each cluster is made of : DAQ electronic racks MM rack and systems ( TRU, AMPLI …) HV mobile rack 14kA, 600A, 60A power supplies LOSS monitor multimeters PLC ( security for PS & CRYO ) …

SM18 test benches facility IMMW14, Ferney Voltaire, September 2005 (slide 6/35) … and the software side The SM18 CR hosts 6 supervision posts : Test & sequence of tests editor Management of the tests Data viewers & analysis Alarms monitoring & logging …

Test Master IMMW14, Ferney Voltaire, September 2005 (slide 7/35) Control Room Test Bench - MMP - HVTEST - POWER - LOSS - DVM_DAQ - PDI - MMP - HVTEST - POWER - LOSS - DVM_DAQ - PDI - HF - LF - POWER - HF - LF - POWER TEMA DAQ applicationsMM applications -TEMA - HRS - TTE - ALARM -TEMA - HRS - TTE - ALARM

Test Master IMMW14, Ferney Voltaire, September 2005 (slide 8/35) Definition of a Test: From the TEMA point of view, a test is : - A list of commands - From a set of pre-defined commands, dedicated to an application - Used to execute a measurement with a list of specified equipments - On a local test bench

Test Master IMMW14, Ferney Voltaire, September 2005 (slide 9/35)

Test Master IMMW14, Ferney Voltaire, September 2005 (slide 10/35)

Test Master IMMW14, Ferney Voltaire, September 2005 (slide 11/35)

Test Master IMMW14, Ferney Voltaire, September 2005 (slide 12/35) Definition of a Sequence: From the TEMA point of view, a sequence is : - A list of tests - Used to execute a set of measurements & to drive the equipments - On a local test bench

Test Master IMMW14, Ferney Voltaire, September 2005 (slide 13/35)

Test Master IMMW14, Ferney Voltaire, September 2005 (slide 14/35)

Test Master IMMW14, Ferney Voltaire, September 2005 (slide 15/35) The TEST MASTER fulfills the first 2 constraints: - Management of several applications to assist the tests and measurements - Fast and easy setup of the applications What about : - Calibration parameters of the devices - Manual edition of the configuration files - Traceability

Hardware Recognition System IMMW14, Ferney Voltaire, September 2005 (slide 16/35) ProblemSolution Calibration parameters Manual edition of the configuration Traceability Database Auto configuration Identification

Hardware Recognition System IMMW14, Ferney Voltaire, September 2005 (slide 17/35) Hardware Recognition System

IMMW14, Ferney Voltaire, September 2005 (slide 18/35) Identification Electronic of the DAQ system Hardware Recognition System

IMMW14, Ferney Voltaire, September 2005 (slide 19/35) Identification 15m coil shaft used for magnetic measurements

Hardware Recognition System IMMW14, Ferney Voltaire, September 2005 (slide 20/35) Identification Cryogenic Feed Box used to cool down the magnets

Hardware Recognition System IMMW14, Ferney Voltaire, September 2005 (slide 21/35) Identification The MOBIC from SIEMENS - Bar code scanner - Industrial portable computer - Wireless communication - Connected to the equipment DB

Hardware Recognition System IMMW14, Ferney Voltaire, September 2005 (slide 22/35) Calibration databases The calibration data are taken from : - CFB & magnet temperature probe coefficients DB - Coil coefficients DB - Power supply DCCT DB - …

Hardware Recognition System IMMW14, Ferney Voltaire, September 2005 (slide 23/35) Auto configuration A set of scripts have been developed to : - Compare the needed & present equipments for a dedicated test. - Access to the calibration DB and generate setting files for the dedicated applications. - Build and transfer on the local test bench workstation the final configuration file.

Hardware Recognition System IMMW14, Ferney Voltaire, September 2005 (slide 24/35) But what about the Magnetic Measurements … … at SM18 the MM are managed by the MMP6 application

Automation of the magnetic measurements IMMW14, Ferney Voltaire, September 2005 (slide 25/35) MMP6 is made of 4 modes of use: The HARDWARE mode: Selection of the equipments Hardware configuration Test of the communications Test of the equipments

Automation of the magnetic measurements IMMW14, Ferney Voltaire, September 2005 (slide 26/35) The RUN mode: Selection of the magnet type Selection of the measurement param. Selection of the current cycle

Automation of the magnetic measurements IMMW14, Ferney Voltaire, September 2005 (slide 27/35) The MEASUREMENT mode: Execution of the current cycle Control of the equipments Execution of the MM Reading of the integrators Saving the data

Automation of the magnetic measurements IMMW14, Ferney Voltaire, September 2005 (slide 28/35) The DISPLAY mode: Analysis of the data Info. about over range / out of limits Archiving of the raw data & results

Automation of the magnetic measurements IMMW14, Ferney Voltaire, September 2005 (slide 29/35) From the TEST MASTER … … to the MM analysis

Automation of the magnetic measurements IMMW14, Ferney Voltaire, September 2005 (slide 30/35) From the TEMA: Selection of the bench (1/2) Selection of the test to execute (ie : MM) Click on Run Test button Then all the following actions will be done automatically …

Automation of the magnetic measurements IMMW14, Ferney Voltaire, September 2005 (slide 31/35) On the HRS: Extraction of the present equipments from the DB Comparison with the needed one for this MM Extraction of the calibration parameters Configuration file generation for MMP6 Transfer of the config. file on the cluster workstation

Automation of the magnetic measurements IMMW14, Ferney Voltaire, September 2005 (slide 32/35) On the cluster workstation: Launching of the MMP6 application Execution of the commands for this test

Automation of the magnetic measurements IMMW14, Ferney Voltaire, September 2005 (slide 33/35) On MMP6: Execution of the HW test of the equipments Execution of the magnetic measurement Display & online analysis

Automation of the magnetic measurements IMMW14, Ferney Voltaire, September 2005 (slide 34/35) From the users: Checking of the MM status & limits Acceptation of the test Archiving of the raw data

Conclusions IMMW14, Ferney Voltaire, September 2005 (slide 35/35) - The integration of the Test Master, Hardware Recognition System and MMP6 satisfies the constraints specified for the test benches facility. - The full system is in use since few month. The performance is very satisfactory, with a good reliability. - A lot of time has been saved during the phases of measurement and software configuration. - The experience of HRS will be taken as an example in the view of an adaptation for the LHC.