Performance Based Studies Research Group Pre Award Phase.

Slides:



Advertisements
Similar presentations
Performance Based Studies Research Group
Advertisements

Performance Based Studies Research Group State of Oklahoma CTP Service.
Performance Based Studies Research Group
Office of Purchasing and Contracts Research Funded Procurement Outreach Training Level III Procurements $50,000 and Above.
Developed By: Performance Based Studies Research Group Performance Information Procurement System.
Program Management Office (PMO) Design
Roadmap for Sourcing Decision Review Board (DRB)
Ensure Vendor/Engineer of Choice Product Quality
Weekly Risk Report & Performance Metrics
Evaluation and Reporting ENTC 4060 Project Scheduling.
Chapter 3 Project Initiation
NEES Project Management Workshop June 16 June 18 1 Segment 2.
1 Schedule Risk Assessment (SRA) Overview July 2013 NAVY CEVM.
(Project) SIGN OFF PROCESS June 21, 2010
5/17/2015 Pre-Proposal Meeting Best Value Model. This presentation is being provided for educational purposes only Please refer to the RFP for specific.
Chapter 3: The Project Management Process Groups
Chapter 5: Project Scope Management
Performance Monitoring All All Contracts require basic monitoring once awarded. The Goal of contract monitoring is to ensure that the contract is satisfactorily.
Chapter 3 Project Initiation. The stages of a project  Project concept  Project proposal request  Project proposal  Project green light  Project.
Report Tile Training & Management Assistance Branch UNITED STATES OFFICE OF PERSONNEL MANAGEMENT Project Kick-Off Meeting for with Project Manager Name,
WCI LEA UPDATE MAY 2, 2014 RI Department Of Education Wireless Classroom Initiative Cynthia Brown, Director Office of Statewide Efficiencies Craig Hockenbrough,
 A project is “a unique endeavor to produce a set of deliverables within clearly specified time, cost and quality constraints”
S/W Project Management
Project Risk Management. The Importance of Project Risk Management Project risk management is the art and science of identifying, analyzing, and responding.
Full Process: From Application to Finalization
Be more effective at “planning the work and working the plan” Project Management Tips.
City of Rochester 2 nd Street Upgrade 9/15/2015 Dean Kashiwagi, PhD, PE Jake Smithwick Arizona State University.
1. 2 IMPORTANCE OF MANAGEMENT Some organizations have begun to ask their contractors to provide only project managers who have been certified as professionals.
Recap from last week Understand organizations, including the four frames, organizational structures. Explain why stakeholder management and top management.
EXAMPLE – Quality Control Plan For Consultants
CEN rd Lecture CEN 4021 Software Engineering II Instructor: Masoud Sadjadi Phases of Software.
Best Value Model Pre-Proposal Information RFP Rebecca Cohn Theatre Seating Renewal.
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 Gathering Network Requirements Designing and Supporting Computer Networks – Chapter.
Best Value Business Model Supplemental Pre-Proposal Information Video RFP : Part A Design-Build St. Joseph’s College Residence.
SacProNet An Overview of Project Management Techniques.
ISM 5316 Week 3 Learning Objectives You should be able to: u Define and list issues and steps in Project Integration u List and describe the components.
Project monitoring and Control
EXAMPLE – Quality Control Plan For Contractors To view the Pre-Award Phase presentation, please go to: Click on "PIPS"
IT 499 Bachelor Capstone Week 4. Adgenda Administrative Review UNIT Four UNIT Five Project UNIT Six Preview Project Status Summary.
STEP 4 Manage Delivery. Role of Project Manager At this stage, you as a project manager should clearly understand why you are doing this project. Also.
Meeting Management/Planning. Today Go over basics of meeting management Introduce key elements of creating a plan.
Introducing Project Management Update December 2011.
1 PROJECT RISKS IMPORTANCE OF COOPERATION BETWEEN PMs AND TEAM LEADs AUGUST 5, 2015.
SOLUTION What kind of plan do we need? How will we know if the work is on track to be done? How quickly can we get this done? How long will this work take.
Alpha Contracting Sole Source Negotiations between Government and Industry (13 CFR (c)(2))
Request for Service (RFS) Process and Metrics Update June 24, 2008.
The Implementation of BPR Pertemuan 9 Matakuliah: M0734-Business Process Reenginering Tahun: 2010.
Performance Based Studies Research Group Pre Award Phase.
NEM201 Week 4 Project Plan Create and complete outstanding items. 01. Front Cover 02. Document details 03. Scope Document 04. Technical Design 05. Creative.
UNIVERSITY OF DAR ES SALAAM t Selection and Employment of Consultants Negotiations with Consultants; Monitoring Performance of Consultants; Resolving Disputes.
BSBPMG501A Manage Project Integrative Processes Manage Project Integrative Processes Project Integration Processes – Part 2 Diploma of Project Management.
The Contract Management Process Post Award Activities.
Strategic sourcing is a Price Based approach to supply chain management that formalizes the way information is gathered and used so that an organization.
PIPS!!! Performance Information Procurement System.
What is Performance Based Contracting? In the performance-based approach, an agency says what problem needs to be solved and allows suppliers to make.
What is Performance Based Contracting? In the performance-based approach, an agency says what problem needs to be solved and allows suppliers to make.
The Project Management Process Groups
Vendor Date VALU Monthly Project Review (VMPR) Project Name/IN #
IS&T Project Reviews September 9, Project Review Overview Facilitative approach that actively engages a number of key project staff and senior IS&T.
Performance-Based Contracting PIPS Performance Information Procurement System Jacob Charries Central Purchasing
Project Management PTM721S
Sample Fit-Gap Kick-off
Procurement Management
Contracting Officer Podcast Slides
Best Value Performance Information Procurement System (PIPS)
Project Ideation Agile Down-to-Earth © 2016.
IS&T Project Reviews September 9, 2004.
Statewide Public Communications Services RFP#
(Project) SIGN OFF PROCESS MONTH DAY, YEAR
Project Kick-off <Customer Name> <Project Name>
Presentation transcript:

Performance Based Studies Research Group Pre Award Phase

W W W. P B S R G. C O M 2 Best Value System Identification of Potential Best-Value Pre Planning and Risk Management Measurement of Deviation from the Expectation PHASE 1 PHASE 2 PHASE 3

W W W. P B S R G. C O M Expectations of a Best Value Contract All efforts are first planned, and then operations are executed. All efforts are well documented with actual performance measured against the original plan. Risk and control transferred to the vendor. Risk are planned for before they occur, focusing on risk that is not controllable. A measured environment Accountable client and an accountable service provider Transparent, simple, and clear Minimum transactions 3

W W W. P B S R G. C O M 4 4 Pre Award Period What is it / Why is it important Period of time allotted to potential best value vendor (aka the Expert) to:  Present their project plan  Set a plan for its delivery / clarify that your proposal is accurate  Identify the risks and issues that could cause the plan to deviate  Identify what you don’t know and when you will know it and how the plan could change based upon what you discover  Set plans to minimize those risks from occurring  Address all the concerns and risks of the client

W W W. P B S R G. C O M 5 5 Pre Award Period What is it / Why is it important Period of time allotted to potential best value vendor (aka the Expert) to:  Know how they are being successful and adding value (measurement)  Weekly Risk Report through project  Identify what you need from the client and have a plan for getting it  Identify what you need from other entities, agency, etc. and also have a plan for getting what you need  Have completely aligned expectations between all parties so everyone knows what is going to transpire and what they are supposed to do

W W W. P B S R G. C O M 6 6 Pre Award Period What is it / Why is it important Period of time allotted to potential best value vendor (aka the Expert) to:  Coordinate the schedule: client, sub-vendors, consultants, suppliers, designer, etc. etc. etc.  Set up and initiate using the Weekly Risk Report (WRR)  Finalize and sign contract

W W W. P B S R G. C O M What Happens During the Pre Award Phase Education (video, vendor and PBSRG) Vendor present Draft Plan at the Kickoff meeting (what you proposed based upon), and also addresses any key client concerns, big ticket items, deal breakers, etc. Set Pre-Award Period Schedule Initiate the Weekly Risk Report IMMEDIATELY Work with client to finalize details and set expectations/responsibilities  Coordinate the project / transition schedule, complete RMP, etc. Finalize the financials and contract Set the baseline / benchmark metrics / performance measurement reporting Hold the Final Summary Meeting Sign the contract

W W W. P B S R G. C O M 8 Filter 1 Past Performance Information Filter 2 Current Capability Filter 4 Prioritization (Identify Best Value) Filter 5 Cost Reasonableness Filter 6 Pre- Planning & Risk Min Time Quality of Vendors Filter 3 Interview Key Personnel Award High Low BV Process Measurement of Risk & Performance During the Contract Non-Detailed Detailed Non-Detailed Clarification, but No Negotiation

W W W. P B S R G. C O M Buyer Controls Vendor Through Contract Traditional Risk Model VendorBuyer Contract

W W W. P B S R G. C O M Vendor Manages/Minimizes Risk With Contract - Contract is predictive Best Value Risk Model Vendor Buyer Contract

W W W. P B S R G. C O M Pre Award Period Start Very High Level Cost Verification Included in Proposal Excluded from Proposal Major Assumptions Major Client Risks/Concerns High Level Project Work Plan Client Risks/Concerns PA Schedule Uncontrollable Risks Response to all risks Roles and Responsibilities Value Added Ideas Coordination Review Functionality Mid Level Performance Reports / Metrics Additional Documentation Technical Details Project Schedule High level demos PA Document End

W W W. P B S R G. C O M 12 Pre Award Document (Risk Management Plan) The PA Document should contain the following: 1.Scope  Clear and Detailed Project Scope (what is and what is not included) – Set Baseline Expectation 2.Risks  A list of Risks vendor does not control with plans to minimize  Identified Risks List  A list of all client/user risks with plans to minimize & all vendor’s risks 3.Milestone schedule 4.Coordination 5.Client Action Item List 6.Weekly Risk Report 7.Cost 8.Other: Agreed to Value Adding Options, Original Plans, Interview Minutes, etc…

W W W. P B S R G. C O M 13 Note to Vendor and Client - Do Not Work in a Vacuum!!!!! The Pre Award period is a time for the client and Vendor to interact  Maximize effort BEFORE the event begins The Vendor should not work in a vacuum  There should be regular meetings between vendor and client (weekly)  An Outcome of first meeting: PA Period Meeting Schedule Agreed to  Vendor should come prepared with a proposed schedule that will be coordinated Complete honesty Optimize within client constraints Vendor should be the leader/driver All critical parties/groups should be coordinated with

W W W. P B S R G. C O M 14 Scope Projects need to have clear scope at the start of the service Everything within the expectation/budget  Minimize/Eliminate Client/User Scope Changes Detailed Scope  Scope identifies what is included and what is not included to meet the client’s intent  Conservative is best If risks exists between scope and client intent they must be identified  Resolve alignment and expectations before signing the contract  Identify path to identifying unknowns during contract

W W W. P B S R G. C O M 15 Cost Clarification Cost clarified if needed Clear and simple movement of money identified If need, linked to performance, expectations, or progress (set by vendor) Model can have “scenarios” for various outcomes Model can be adjusted based upon value adding options  Risk Plans  Additional risk elimination actions

W W W. P B S R G. C O M 16 Identified Risks List of Risks that have been previously identified  All vendor team risks  All client technical concerns, risk, issues, and bugaboos  All user concerns, risk, issues, etc. Simple format  Risk  Solution/Plan to Minimize  Action if Risk Occurs  Impact is Risk Occurs If a risk is not a risk, just say why it is not a risk…

W W W. P B S R G. C O M 17 Risk Minimization Structure List of Risk Vendor  From Project Capability plans Example Format  Risk #1: Description of risk (or why it is a risk)  Solution: Provide your solution. Because this document is not constrained by a page limit, it is acceptable to add more detail to your previous solution provided in your RAVA plan. Make sure it is identified at what point you have done everything reasonably possible. Identify the impact if the risk still exists after you have done everything reasonably possible.  Step 1:  Step 2:  Step 3:  Step 4:  Step 5:  Etc.  Action If Risk Occurs: Similar to above, but a list of action items once risk occurs  Expected Impact if Risk Occurs: For example, “If we have done the above X steps and the risk still exists, there will be an impact to the …budget…schedule…of $XX.XX…XX days.”

W W W. P B S R G. C O M 18 Milestone Schedule Project schedule that can be worked from  Simple to read  Simple to use Intent: Minimize Risk = Help All Parties be more efficient and accountable Contents  Major Activities, Deliverables, and Milestones (linked to metrics)  Client Action Items clearly identified (e.g. red)  Risky areas / decision points clearly identified (e.g. green)

W W W. P B S R G. C O M 19 Client Action Item List  List of all actions/tasks that the vendor requires from the client  Each Action Item will have a:  Activity  Person Accountable in the Client organization  Agreed to Due Date

W W W. P B S R G. C O M Example 20

W W W. P B S R G. C O M 21 Weekly Risk Reports What is it / Why is it important What is it:  Excel Spreadsheet that tracks unforeseen risks on a service Why is it important:  Allows vendors to document unresolved client issues  Allows vendors the ability to show they can manage a service through risk minimization  Allows vendors to document all client decisions  Provides PM a weekly/monthly analysis of all services  Will be used to monitor the progress and performance of the entire client organization (this isn’t just for a specific contractor or a specific service...there is a bigger picture) How much effort:  Minimal (less than 5-15 minutes), unless contractor did not preplan, or client making decisions

W W W. P B S R G. C O M 22 Weekly Reporting System (Sample) Excel Spreadsheet that tracks unforeseen risks on a service The client will setup and send to vendor once Award/NTP issued Vendor must submit the report every week (Friday). The final service rating will be impacted by the accuracy and timely submittal of the WRS

W W W. P B S R G. C O M 23 Weekly Risk Report  We will be starting a weekly risk report for the pre-award period  Contents:  Contact Info  Pre-Award Schedule  Risks/Issue Tracking PBSRG can provide specific detailed education individually with the vendor

W W W. P B S R G. C O M 24 Unforeseen Risks PERFORMANCE SUMMARY Vendor Performance Client Performance Individual Performance Project Performance RISK MANAGEMENT PLAN Risk Risk Minimization Schedule WEEKLY REPORT Risk Unforeseen Risks Measurement of Deviation from the Expectation Management by Risk Minimization

W W W. P B S R G. C O M 25 Other All other items of importance Including  Value Adding Options agreed to  Original Plans  Interview Minutes  Any specifications  Any other pertinent information

W W W. P B S R G. C O M 26 Pre Award Final Summary Meeting Is not a “Q&A” meeting  All issues resolved  All coordination complete  All risks that are not in vendors control have been identified  All value added options have been addressed PA Final Meeting is to summarize all of the coordination that has been complete and walk through the PA Document/RMP Upon successful completion of the PA Final Meeting, the client will make the award

W W W. P B S R G. C O M 27 Filter 1 Past Performance Information Filter 2 Current Capability Filter 4 Prioritization (Identify Best Value) Filter 5 Cost Reasonableness & Dominance Check Filter 6 Pre- Planning & Risk Min Time Quality of Vendors Filter 3 Interview Key Personnel Award High Low BV Process - Award Measurement of Risk & Performance During the Contract

W W W. P B S R G. C O M 28 Filter 1 Past Performance Information Filter 2 Current Capability Filter 4 Prioritization (Identify Best Value) Filter 5 Cost Reasonableness & Dominance Check Filter 6 Pre- Planning & Risk Min Time Quality of Vendors Filter 3 Interview Key Personnel Award High Low Measurement of Risk & Performance During the Contract Post Project Rating Updating of PPI

W W W. P B S R G. C O M 29 Final Rating After the project is complete, the client will evaluate the project. The Final Rating will be heavily impacted by:  Performance  Owner surprises  Complaints  Ability to submit accurate and timely weekly reports In Best-Value Procurement, the vendors goal is to get a high rating in order to stay competitive.

W W W. P B S R G. C O M 30 Immediate Action Items Prep for Kick Off Meeting & Conduct the Kickoff Meeting  Draft Plan (focus on differences from current service)  Address any Critical Client Concerns or clarification needs  Pre-Award meeting schedule  Initiate Pre-Award Period Weekly Risk Reporting Recommended to Hold a weekly phone call  Review schedule  Review issues/risks  This carries forward into the project Risk Minimization - Lists of risks/concerns/issues from the client, users, etc. Begin Pre-Award and RMP development – will become functional pieces of contract

W W W. P B S R G. C O M Best Value Vendor Characteristics Preplans and Minimizes Risk on Each Initiative  Has a plan and knows the risks to the plan  Is transparent  Communicates clearly  Asks good questions, knows what they don’t know Measures Performance and drives accountability Uses Dominant Information to Differentiate themselves/show value added Educates the Client and helps the client be a better client Educates themselves and has a continually enhanced vision Holds themselves and the client accountable Their plan is aligned so that when they win, the client automatically wins 31

W W W. P B S R G. C O M Best Value Client Characteristics Ensures their needs and concerns are known by the vendor Ensures the vendor has a plan that addresses each need/concern/risk Is a facilitator to the vendors development of the plan(s) Enforces the best value structure  Weekly risk reporting is being done  Each risk is given a client satisfaction rating  Measurements by vendor are being done  Do not be pulled into making decisions you do not need to make Educates themselves and the vendor  Avoids reversion to previous practices  Transfers risk and control Holds the vendor and themselves accountable Ensures the plan is aligned so they win and the vendor wins 32

W W W. P B S R G. C O M 33 Comments / Questions W W W. P B S R G. C O M

34 Uncontrollable Risk 1 The client has agreed to move storage boxes prior to the NTP. The boxes are blocking the wall where we will install the new electrical equipment. If the material is not moved we will not be able to install the equipment. If material is not moved we will perform the following: 1.Immediately notify the client and track in our weekly report. We will mobilize and perform other functions. However, if material is not moved by 2 nd week, this will cause delays. 2.If the client cannot get the material moved, we can move the material into another room (on the same floor) at no additional cost or time delay. The client will have to move the material back. 3.Or, we can rent a storage container for the duration of the project and move the material into storage and back into the room after completion. This will cost $1,500 and add 1 week to our schedule.

W W W. P B S R G. C O M 35 Uncontrollable Risk 2 One of the biggest risk on this service is falling debris from the roof deck onto personnel or equipment below the deck. On this service, the personnel and equipment are protected since there is a dropped ceiling beneath the deck. The PM (client) has assured us that these tiles have been installed properly and we have randomly spot checked areas to determine that they will perform. However, if for some reason the ceiling tile fails, we will perform the following:  Immediately stop all work and determine the extent of damage  Identify if work can proceed as is, or if additional protection is needed  We can modify our schedule to work off-hours to protect falling debris from hitting personnel, but this will not protect equipment. There will be no impact to cost or time if we have to work off-hours.  We can purchase large tarps (100’x100’) and place them beneath the ceiling tiles. This will protect both personnel and equipment. These special tarps will cost an additional $5K and will take an additional 2 weeks to setup and move.  Identify any actions required from the client