Low Flow Analysis & Water Use Plan Science & Community Environmental Knowledge Fund Forum June 10, 2004 Barry Ortman Diversified Technical Services Dawson.

Slides:



Advertisements
Similar presentations
Lawyer Creek Steelhead Trout Habitat Improvement Project presented by: Lewis Soil Conservation District.
Advertisements

© Chevron 2005 Chevron Piceance Basin Natural Gas Development Program Northwest Colorado Oil & Gas Forum Presented by: Michael DeBerry June 5, 2008.
WATER QUALITY ANALYSIS for ANTIDEGRADATION
Meadowbank Gold Project Cumberland Resources Ltd. Nunavut Impact Review Board Public Hearing Chesterfield Inlet, Nunavut March 30, 2006.
Division of State Lands’ Wetlands Program. Issues That Spawned State Wetlands Program (SB 3) Lack of detailed wetlands inventory information or guidance.
080820_v1DP TRAVEL MANAGEMENT - PROCESS ON THE GILA NATIONAL FOREST.
Cost-Share Funding Opportunities – How the Lower Souris Watershed Committee Can Help You? Karmen Kyle Group Plan Advisor, Lower Souris Watershed Committee.
Assessment of Utah’s Nonpoint Source control program Nancy Mesner, Doug Jackson-Smith, Phaedra Budy, David Stevens Lorien Belton, Nira Salant, William.
Bill Orme, Senior Environmental Scientist, State Water Board Liz Haven, Asst. Deputy Director, Surface Water Regulatory Branch, State Water Board Dyan.
Forest Practices Code Transition Roads With Ron Davis Chief Engineer, MOF.
South Llano River: One of 2011’sTop Ten National Fish Habitat Action Plan named SLR as “water to watch” WHY?? –Conserve freshwater, estuarine, and marine.
Kiggavik Uranium Mine Project Presentation to the Nunavut Impact Review Board Final Hearing Baker Lake, NU March 2-14,
LID and Stormwater Technical Resource Center Update County Road Administration Board November 3,
1 Public Lands Advocacy HOW TO REVIEW A FEDERAL PLANNING DOCUMENT.
Federal Realty Investment Trust (FRIT) Eastgate Shopping Center Chapel Hill, NC September 9, 2008.
Rivanna Water & Sewer Authority Community Water Supply Mitigation Plan Public Meeting November 2, 2006.
SHALE PLAYS IN THE INTERMOUNTAIN WEST: LEGAL AND POLICY ISSUES Development of Shale: Water Resource Concerns & Policy Considerations Katy Dunlap, Esq.
Getting the Big Picture How to Look at Your Watershed Indiana Watershed Planning Guide,
L-THIA Long-Term Hydrologic Impact Assessment Model ….provides relative estimates of change of runoff and non point source pollutants caused due to land.
Apalachicola/Chattahoochee/Flint Focus Area - USGS WaterSMART NIDIS SE Climate Forum Lake Lanier Islands, GA December 2, 2011.
Applying First Nations Traditional Knowledge to Reclamation in the Oil and Gas Industry West Moberly First Nations Traditional Knowledge Project Oil and.
Maintaining Watersheds. Next Generation Science/Common Core Standards addressed! HS‐ESS2‐5. Plan and conduct an investigation of the properties of water.
Presentation to the Workshop Climate Change and Great Lakes Water Levels March 30, 2001 Chicago, Illinois Gerald E. Galloway, Jr., P.E., Ph.D. International.
First Nations-Focused Scientific Reviews of Environmental Assessments MSESMSES Prepared by Sarah Hechtenthal, M.Sc., P. Biol.
Overview of Watershed Systems
West Virginia University Natural Stream Restoration Program An Interdisciplinary Program Focusing on Research, Education, and Professional Services in.
Most Common Conservation Practices Forestry Illinois.
Burl Carraway. Purpose of Redesign Shape and influence use of forest land on a scale and in a way that optimizes public benefits from trees and forests.
1 Module 4: Designing Performance Indicators for Environmental Compliance and Enforcement Programs.
Jan 2005 Kissimmee Basin Projects Jan Kissimmee Basin Projects Kissimmee River Restoration Project (KRR) Kissimmee Chain of Lakes Long Term Management.
1 U.S. ARMY CORPS OF ENGINEERS AND ST. JOHNS RIVER WATER MANAGEMENT DISTRICT Indian River Lagoon North Restoration Feasibility Study Public Meeting September.
IMPACTS OF LAND DEVELOPMENT ON OREGON’S WATERS 2001 This slide show was borrowed from the internet but we added our own research when we presented it.
Columbia River Water Management Program (CRWMP) Review of Year One Upper Crab Creek Planning Unit Meeting April 17, 2007.
Predicting Sediment and Phosphorus Delivery with a Geographic Information System and a Computer Model M.S. Richardson and A. Roa-Espinosa; Dane County.
Interim Headwater Drainage Feature Guideline: Protecting HDFs through Urbanization Laura C.R. Del Giudice, B.Sc., M.F.C., Senior Planning Ecologist.
Standards for Ecologically Successful River Restoration Palmer et al., 2005, Standards for Ecologically Successful River Restoration Palmer et al., 2005,
Review of the Nipissar Lake Replenishment Project, Rankin Inlet, Nunavut September 25, 2014 NWB Hearing Presentation Type A Water License Amendment Application.
1 Managing Cumulative Impacts SCEK Forum June 10, 2004 Fort St. John.
Icicle Creek Salmon Habitat Conditions* Land Development has affected stream channel movement, off channel habitat, and LWD recruitment. Barriers to migration.
Wetland Monitoring What Do We Need? Integration of Wetland Monitoring and Wetland Management Wetlands and Waterways Program Maryland Dept. of the Environment.
SCEK Fund Forum Reclamation & Impact Management.
Dr Richard Johnson, Mountain Environments, UK.  Lead Partner: Germany: Research Institute of Forest Ecology and Forestry  Partner countries: Germany,
SFS Best Practices Presentation Key “Best Practice” Drivers for the Crop Sector 1.Reduce Nutrient, Sediment and Herbicide Runoff 1.Riparian buffer strips,
Stormwater Retrofitting: The Art of Opportunity Prepared by the Center for Watershed Protection.
Teaching where science and policy intersect by developing a river restoration plan on a local stream Gabrielle David Department of Earth and Environmental.
Managing Western Water as Climate Changes Denver, CO February 20-21, 2008.
Bijou Erosion Control Project Project Kickoff TAC Meeting May 4, 2007 City of South Lake Tahoe ENTRIX, Inc. California Tahoe Conservancy.
Western Lake Erie Basin Partnership Presented by: Name, Title Your Organization DATE YOU PRESENTED The Meeting you presented at.
Rivanna Water & Sewer Authority Community Water Supply Mitigation Plan Public Meeting November 2, 2006.
James W. Beever III Southwest Florida Regional Planning Council 1926 Victoria Avenue Fort Myers, FL ( , ext 224)
Laguna Creek Watershed Council Development of the Laguna Creek Watershed Management Action Plan & It’s Relevance to the Elk Grove Drainage Master Planning.
Stormwater Overview Board of County Commissioners Planning Conference March 1, 2007.
Urban Water Research Todd Rasmussen Associate Professor of Hydrology The University of Georgia, Athens and Pending Director, Urban Water Research Institute.
2006 Cumulative Effects Assessment CEA Definition  Potential for residual project-specific effects associated with Meadowbank project in combination.
HYDROELECTRIC POWER AND FERC. HYDRO 101A ”Water Runs Down Hill”
Watershed Management Muhammad Dilshad Habib 2004-ag-1414
Lee County Water Resource Initiative: Community Sustainability Committee June 16, 2010 Kurt Harclerode Operations Manager Lee County Natural Resources.
STRATEGIES FOR FRESHWATER. CONTEXT FOR STRATEGIES.
California Water Plan Update Advisory Committee Meeting January 20, 2005.
Steve Todd WetSAG co-chair Suquamish Tribe Ash Roorbach CMER Riparian Ecologist August 5, 2010.
EVALUATING STREAM COMPENSATION PERFORMANCE: Overcoming the Data Deficit Through Standardized Study Design Kenton L. Sena (EPA VSFS Intern), Joe Morgan,
GIS M ETHODOLOGY Swearing Creek Watershed Restoration Plan 8/26/2015 Piedmont Triad Regional Council.
Nunavut Water Board Public Hearing
Todd Petty, Mike Strager, and Michael Hasenmyer
Retaining Water (In A Good Way).
Integrating Wetlands and Watershed Management: Lessons from the U.S.
PENNSYLVANIA STORMWATER BEST MANAGEMENT PRACTICES MANUAL
Anne Arundel County Maryland
Fox Creek Operators Group
Hamilton Township, Mercer County, NJ Hydrologic Evaluation and Water Resources Recommendations For Planning and Implementation Rutgers Cooperative Extension.
Presentation transcript:

Low Flow Analysis & Water Use Plan Science & Community Environmental Knowledge Fund Forum June 10, 2004 Barry Ortman Diversified Technical Services Dawson Creek, BC

Outline Purpose of the Project Purpose of the Project History of oilfield water use in NE BC History of oilfield water use in NE BC Problems / Impacts Problems / Impacts Hydrology Hydrology Water Use Plan – Upper Beatton River Water Use Plan – Upper Beatton River Healing the Land Pilot Project Healing the Land Pilot Project Where do we go from here? Where do we go from here?

History of Oilfield Water Use Drilling, camps, ice roads, hydrostatic testing and processing plants. Drilling, camps, ice roads, hydrostatic testing and processing plants. Short Term Approval for Water Use Short Term Approval for Water Use –Schedule A Approved Sources Fast paced activity Fast paced activity Water Flows are at a minimum when activity peaks Water Flows are at a minimum when activity peaks Working Area 600 km. X 150 km. Working Area 600 km. X 150 km.

Purpose The Low Flow project intends to mitigate the impacts of water use on the aquatic resources by developing a water plan for oil and gas exploration. The Low Flow project intends to mitigate the impacts of water use on the aquatic resources by developing a water plan for oil and gas exploration. The basic concept of the project is to identify where we have water supply problems, map the base flow conditions, locate suitable storage sites and review with the stakeholders for input. The basic concept of the project is to identify where we have water supply problems, map the base flow conditions, locate suitable storage sites and review with the stakeholders for input. Water will be diverted and stored during the spring runoff and used when the stream flow has dropped. Water will be diverted and stored during the spring runoff and used when the stream flow has dropped.

Mean Monthly Flows for the Blueberry River

Activity levels for exploration

Problems / Impacts Monitoring of Withdrawals Monitoring of Withdrawals Water Flow Data is minimal Water Flow Data is minimal Lack of Infrastructure Lack of Infrastructure Beaver Habitat Impacts Beaver Habitat Impacts Fish / Habitat Impacts Fish / Habitat Impacts Downstream Water Users Downstream Water Users Regulatory - Admin. Problems Regulatory - Admin. Problems

Process Phase I Identified High Value Watersheds for fish, water use, recreation and First Nation’s that overlapped with high oilfield activity zones. Identified High Value Watersheds for fish, water use, recreation and First Nation’s that overlapped with high oilfield activity zones. Identified problem areas and activities. Identified problem areas and activities. Completed Hydrology Assessment and mapping. Completed Hydrology Assessment and mapping. Field measurements on streams to confirm hydrology. Field measurements on streams to confirm hydrology. Identified base flow conditions for 5 watersheds (0.056m3/s) in the Liard, Fort Nelson, Fontas, Peace and Wapiti watersheds. Identified base flow conditions for 5 watersheds (0.056m3/s) in the Liard, Fort Nelson, Fontas, Peace and Wapiti watersheds.

Hydrology Forest Information Systems Ltd. completed the hydrology and mapping aspect using the Water Survey of Canada data. Forest Information Systems Ltd. completed the hydrology and mapping aspect using the Water Survey of Canada data. Analyzed using the 7 day low flow, probability of exceedence and regression analysis. Analyzed using the 7 day low flow, probability of exceedence and regression analysis. Watershed size of 3800 km. 2 is required to meet the minimum flow in the November to March season for a 2 year return period on the Plateau. Watershed size of 3800 km. 2 is required to meet the minimum flow in the November to March season for a 2 year return period on the Plateau.

Water Use Plan – Upper Beatton River Upper Beatton River was identified as having minimal stream flow, no surface storage and minimal lakes for water use. Upper Beatton River was identified as having minimal stream flow, no surface storage and minimal lakes for water use. We looked at the history of drilling, soils, forest cover, topo maps, digital ortho photos, hydrology maps and field inspections to identify needs, storage locations and alternate sources. We looked at the history of drilling, soils, forest cover, topo maps, digital ortho photos, hydrology maps and field inspections to identify needs, storage locations and alternate sources. Discussed with industry, regulatory staff, First Nations and water haulers to confirm the needs and possible source locations. Discussed with industry, regulatory staff, First Nations and water haulers to confirm the needs and possible source locations. By storing surface runoff we can have a minimal impact on a system by withdrawing during the least impact time of year. By storing surface runoff we can have a minimal impact on a system by withdrawing during the least impact time of year.

Offstream Storage Offstream storage is a proven technique to store water during high runoff times for use in low flow seasons. Offstream storage is a proven technique to store water during high runoff times for use in low flow seasons. Low maintenance, minimal impact and cost effective storage solution. Low maintenance, minimal impact and cost effective storage solution. By incorporating habitat and forestry needs we produce a site that has multiple benefits. By incorporating habitat and forestry needs we produce a site that has multiple benefits. Nesting zones, edge habitat and riparian vegetation increase the habitat potential of the site. Nesting zones, edge habitat and riparian vegetation increase the habitat potential of the site.

Healing the Land Pilot Project Outcome of Upper Beatton Water Use Plan Outcome of Upper Beatton Water Use Plan Highest and best use of the land. Highest and best use of the land. Cumulative impacts from water use and land disturbances (borrow pits). Cumulative impacts from water use and land disturbances (borrow pits). Demonstration sites for multiple benefits. Demonstration sites for multiple benefits.

Construction and Exploration Planning By Incorporating the water development into the construction aspect we can develop these projects with minimal cost and have years of benefit to the area. These benefits will be long lasting and will not show up as a scar on the landscape but rather as a natural opening and wetland.

Conclusions and recommendations? Complete the hydrology mapping. Complete the hydrology mapping. Water demand mapping. Water demand mapping. Implement Beatton Water Use Plan and the Healing the Land pilot project. Implement Beatton Water Use Plan and the Healing the Land pilot project. Require oil companies to obtain a water licence and use the base map as source of supply. Require oil companies to obtain a water licence and use the base map as source of supply. Assess lakes and identify acceptable sources. Assess lakes and identify acceptable sources.

Acknowledgements DTS would like to thank the Oil and Gas Commission, the Science and Community Knowledge Fund and especially Derek Doyle for having the enthusiasm and interest in this project. DTS would like to thank the Oil and Gas Commission, the Science and Community Knowledge Fund and especially Derek Doyle for having the enthusiasm and interest in this project. Thank You. Thank You.