U.S. ATLAS Executive Meeting Upgrade R&D August 3, 2005Toronto, Canada A. Seiden UC Santa Cruz.

Slides:



Advertisements
Similar presentations
10-Nov-2005US ATLAS Tracking Upgrade Santa Cruz 1.
Advertisements

Long Shaping-time Silicon Readout Bruce Schumm UC Santa Cruz Arlington Linear Collider Workshop January
Progress towards a Long Shaping-Time Readout for Silicon Strips Bruce Schumm SCIPP & UC Santa Cruz SLAC LC Workshop January 6-10, 2004.
Progress towards a Long Shaping-Time Readout for Silicon Strips Bruce Schumm SCIPP & UC Santa Cruz SLAC LCWS05 July 28-31, 2004.
4/25/2006 Puneeth Kalavase, UC, Santa Barbara On behalf of US Tracker Outer Barrel group Construction and Testing of CMS “Rods”
Progress towards a Long Shaping-Time Readout for Silicon Strips Bruce Schumm SCIPP & UC Santa Cruz SLAC LCWS05 July 28-31, 2004.
Progress towards a Long Shaping-Time Readout for Silicon Strips Bruce Schumm SCIPP & UC Santa Cruz Victoria Linear Collider Workshop July 28-31, 2004.
Sensors for CDF RunIIb silicon upgrade LayerR min (cm)1 MeV eq-n cm * * * * * *10.
The LHCb Inner Tracker LHCb: is a single-arm forward spectrometer dedicated to B-physics acceptance: (250)mrad: The Outer Tracker: covers the large.
PG2 Solid State Tracking Detectors Seems like we are all newcomers here Topics are arranged according to R&D topic not sub-system as it was in 2013 – Meaning.
DC/DC Converter Update Markus Friedl (HEPHY Vienna) B2GM, 22 July 2012.
A Serializer ASIC for High Speed Data Transmission in Cryogenic and HiRel Environment Tiankuan Liu On behalf of the ATLAS Liquid Argon Calorimeter Group.
March 20, 2001M. Garcia-Sciveres - US ATLAS DOE/NSF Review1 M. Garcia-Sciveres LBNL & Module Assembly & Module Assembly WBS Hybrids Hybrids WBS.
Electrical Integration WBS Eric J. Mannel Columbia University Electronics Project Engineer VTX and FVTX.
D. Lissauer, BNL. 1 ATLAS ID Upgrade Scope R&D Plans for ATLAS Tracker First thoughts on Schedule and Cost.
M. Gilchriese ATLAS Upgrade Introduction January 2008.
DOE/NSF Review of the U.S. ATLAS Construction Project June 3-4, 2002 WBS 1.1 Silicon Subsystem Abe Seiden UC Santa Cruz.
R&D on W-SciFi Calorimeters for EIC at Brookhaven E.Kistenev, S.Stoll, A.Sukhanov, C.Woody PHENIX Group E.Aschenauer and S.Fazio Spin and EIC Group Physics.
SLHC SG: ATLAS Pixel G. Darbo - INFN / Genova SLHC SG, July 2004 ATLAS Pixel at SLHC G. Darbo - INFN / Genova Talk overview: A table with different High.
U.S. Deliverables Cost and Schedule Summary M. G. D. Gilchriese U.S. ATLAS Review Revised Version November 29, 2000.
Phase 2 Tracker R&D Background: Initial work was in the context of the long barrel on local tracklet- based designs. designs of support structures and.
A.A. Grillo SCIPP-UCSC ATLAS 19-Jul SiGe biCMOS for Next Gen Strip Readout Evaluation of SiGe biCMOS Technologies for Next Generation Strip Readout.
M&O status and program for ATLAS LAr calorimeter R Stroynowski (on vacations)
U.S. Deliverables Cost and Schedule Summary M. G. D. Gilchriese Revised Version December 18, 2000.
U.S. ATLAS in the Next Decade Brookhaven March 6, 2008 A. Seiden UCSC March 6, 2008.
Vienna Fast Simulation LDT Munich, Germany, 17 March 2008 M. Regler, M. Valentan Demonstration and optimization studies by the Vienna Fast Simulation Tool.
2 Silicon pixel part Done and to be written Written! Under way To be done Introduction 1.Hybrid Pixel Assembly Concept 2.Silicon sensor 1.First thinned.
ATLAS PIXEL SYSTEM OVERVIEW M. Gilchriese Lawrence Berkeley National Laboratory March 11, 1999.
Common ATLAS/CMS Electronics Workshop March, 2007 W. Dabrowski Atlas ABCNext/SiGe W. Dabrowski Faculty of Physics and Applied Computer Science AGH.
Thin Silicon R&D for LC applications D. Bortoletto Purdue University Status report Hybrid Pixel Detectors for LC.
Upgrade R&D January 2005 A. Seiden U.C. Santa Cruz.
M. Gilchriese U.S. Pixel Mechanics Overview M. G. D. Gilchriese Lawrence Berkeley National Laboratory April 2000.
Tevatron II: the world’s highest energy collider What’s new?  Data will be collected from 5 to 15 fb -1 at  s=1.96 TeV  Instantaneous luminosity will.
UCSC August 12, 2008 U.S. Upgrade R&D Meeting: Strip Detector  Seiden.
All Experimenters MeetingDmitri Denisov Week of July 7 to July 15 Summary  Delivered luminosity and operating efficiency u Delivered: 1.4pb -1 u Recorded:
Trends and synergies in solid state tracking R&D Executive Summary of the session Frank Hartmann.
SCIPP Santa Cruz Institute for Particle Physics
Overview of a Plan for Simulating a Tracking Trigger (Fermilab) Overview of a Plan for Simulating a Tracking Trigger Harry Cheung (Fermilab)
Pixel power R&D in Spain F. Arteche Phase II days Phase 2 pixel electronics meeting CERN - May 2015.
Local Supports to IDR Discussion ATLAS Upgrade Week November 2014.
TC Straw man for ATLAS ID for SLHC This layout is a result of the discussions in the GENOA ID upgrade workshop. Aim is to evolve this to include list of.
WG3 – STRIP R&D ITS - COMSATS P. Riedler, G. Contin, A. Rivetti – WG3 conveners.
Calorimeter Digitisation Prototype (Material from A Straessner, C Bohm et al) L1Calo Collaboration Meeting Cambridge 23-Mar-2011 Norman Gee.
PHENIX Vertex Detector with Conventional Strip Sensors Abhay Deshpande Stony Brook University.
U.S. ATLAS Executive Meeting Silicon M&OWBS 3.1 August 3, 2005Toronto, Canada A. Seiden UC Santa Cruz.
Jan 24, 2005Tracking Upgrades Welcome and Agenda Carl Haber 1 US ATLAS: Meeting on SLHC Tracking Upgrades Jan 2005 Lawrence Berkeley Lab Welcome.
Ideas for Super LHC tracking upgrades 3/11/04 Marc Weber We have been thinking and meeting to discuss SLHC tracking R&D for a while… Agenda  Introduction:
May 2007DC-DC --- US ATLAS Upgrade R&D --- Garcia-Sciveres1 DC-DC converter R&D US ATLAS Upgrade UCSC May 2007.
Upgrade PO M. Tyndel, MIWG Review plans p1 Nov 1 st, CERN Module integration Review – Decision process  Information will be gathered for each concept.
ACES Mar 2007Geoff Hall1 System level requirements for upgraded tracker.
F Fermilab Vertex Effort From a Fermilab Detector R&D Perspective Marcel Demarteau For the Fermilab ILC Detector & Physics R&D Group ALCPG Vertex Detector.
Rene BellwiedSTAR Tracking Upgrade Meeting, Boston, 07/10/06 1 ALICE Silicon Pixel Detector (SPD) Rene Bellwied, Wayne State University Layout, Mechanics.
M. Gilchriese 1 Pixel R&D The useful lifetime of the innermost pixel layer is expected to be limited to a few years at design luminosity. However, there.
RD program on hybrids & Interconnects Background & motivation At sLHC the luminosity will increase by a factor 10 The physics requirement on the tracker.
Geoff HallLECC LHC detector upgrades Introductory comments on electronic issues Organisation of this short session.
Provocative. Who needs detector hardware (until 2025)? ATLAS LHCb KM3 ALICE Darwin/XENON ILC/CLIC Virgo/GW Auger ? medical imaging, beam therapy.
Steinar Stapnes, LHCC June The ATLAS inner detector TRT endcap A+B TRT endcap C TRT barrel SCT barrel SCT endcap Pixels uWhole ID sits inside bore.
The BTeV Pixel Detector and Trigger System Simon Kwan Fermilab P.O. Box 500, Batavia, IL 60510, USA BEACH2002, June 29, 2002 Vancouver, Canada.
NSW Electronics Preliminary Design Review Feb 2015 Introduction and Review Scope Feb 2015 NSW ELTX PDR S. Zimmermann 1 Stephanie Zimmermann.
Hybrid CMOS strip detectors J. Dopke for the ATLAS strip CMOS group UK community meeting on CMOS sensors for particle tracking , Cosenors House,
R&D for SLHC detectors at PSI and Geneva CHIPP workshop on the high-energy frontier of particle physics Zürich 6. September 2006 R. Horisberger (Paul Scherrer.
Tracking Upgrade R&D Meeting. Columbia University A. Seiden September 22, 2003.
 Silicon Vertex Detector Upgrade for the Belle II Experiment
FBK / INFN Roma, November , 17th 2009 G. Darbo - INFN / Genova
Some input to the discussion for the design requirements of the GridPixel Tracker and L1thack trigger. Here are some thoughts about possible detector layout.
P. Morettini Towards Pixel TDR PM - ITk Italia - Introduction 8/2/2017.
The Silicon-on-Sapphire Technology:
Silicon Pixel Detector for the PHENIX experiment at the BNL RHIC
Valerio Re (INFN-Pavia) on behalf of the RD53 collaboratios
Basic starting point New tracker layers on the timescale of the first 5 years of running are a sensible first step Contained in the volume from pixel layer.
Presentation transcript:

U.S. ATLAS Executive Meeting Upgrade R&D August 3, 2005Toronto, Canada A. Seiden UC Santa Cruz

2 Introduction FY06 we are planning to continue work on R&D for a new inner detector and on Liquid Argon readout electronics. Just completed workshop on inner detector R&D in Genova, Italy on July Very thorough discussion of issues. Approximately 100 people attended. Some outcomes: Plan to request formation of an Upgrade Project Office as part of TC. Rough schedule outlined. Need to complete key R&D by This includes radiation testing of components. Work on TDR in Development work through 2012 and then full scale construction. U.S. R&D effort that began a year ago fits in well with overall ATLAS goals expressed in Genova.

3 Inner Detector Geometry General layout ideas pretty clear. One inner removable pixel layer. Remainder of detector in one volume. Total of: 3 pixel layers, 4 short-strip layers, 2 long-strip layers. Some questions: Replace innermost short-strip layer with pixel layer? Should there be 3 long-strip layers? Which layers have stereo information?

4 Liquid Argon Liquid Argon work not yet organized into overall ATLAS program. However, U.S. groups have made a detailed overall plan, endorsed by the ATLAS liquid argon group. Strawman Target for FY06 from U.S. ATLAS for Upgrade R&D has been: Silicon Upgrade R&D$1,506k Liquid Argon Upgrade $494k $2,000k

5 Upgrade R&D Program for FY05 Plan for U.S. ATLAS Upgrade R&D for FY05. The people working on these projects are all in good communication and a true overall collaboration is developing. The program elements, all representing unique work directed at the high luminosity environment of an upgraded ATLAS, are as follows: 1) Development of a stave readout structure. This is a collaboration of BNL, Hampton, and LBNL, with UCSC anticipated to join later. This work leverages past effort for CDF in developing stave structures that minimize material, cabling, and power connections. Improvements in these areas are essential to fit a new tracker with many more channels into the space available in the ATLAS detector. 2) Development of a stripixel detector with small angle stereo readout and other features required to survive high integrated luminosity. These detectors look like a very promising choice for radii between about 25 and 65 cm. This is a unique U.S. effort and leverages past work on these detectors at BNL. This work will be done at BNL, but the detectors developed will be integrated into the stave structure in (1) and will fit together with the work on detector materials in (3). 3) Evaluation of detector materials, new choices for electronics, and development of a short strip detector (alternative to the stripixel detector, but also likely choice for outer tracking elements). New commercial electronics technologies will be evaluated for use with high-capacitance load detectors such as short strip or stripixel detectors. This work, which will be done at UCSC, leverages the effort within the RD50 collaboration on materials based on collaborative work that has been established, and funding from the DOE ADR program. A goal is to eventually integrate a radiation hard detector into the stave structure and to provide input on materials to the stripixel effort. 4) Work on 3-D pixel detectors. These detectors provide one of a very small number of alternatives for detectors inside of a radius of about 15 cm. The detector concept originated in the U.S. and we can leverage work toward other applications, particularly in biology. This is a collaboration of the Univ. of Hawaii and the Univ. of New Mexico. They will provide detectors and evaluate their radiation properties after irradiation. The LBNL pixel group collaborates informally regarding readout issues. 5) Characterization of readout chips using 0.13 micron CMOS. This work is essential for detectors of the future as industry is shifting to smaller feature size. The detailed chip design, layout, and measurements will be done by LBNL. This group has already submitted a chip (last year) and the effort is based on several years of work developing the present ATLAS pixel chip.

6 FY05 Upgrade R&D Program Funding: Upgrade R&D for FY 05 BNL87,500 Hampton20,000 LBNL165,000 UCSC100,000 Univ. of Hawaii63,500 Univ. of New Mexico63,500 Total499,500

7 Non-Tracker Projects in FY05 Novel Data Transmission Scheme at SMU$20k Development of Monitors in Muon Region, Arizona$30k

8 Requests for FY06 My recommendations in parentheses where different from request. 1.) Development of Stave. In Genova, stave idea endorsed as essential. $250k 2.)Stripixel detector. Not clear if this will have adequate signal to noise. Understanding capacitance most important immediate issue. Should think about an overall ATLAS review, when generic performance numbers are clear. $164k 3.) Evaluation of detector materials and Si-Ge technology for electronics. Initial results indicate that n-on-p detectors are most suitable choice for short-strips. Si-Ge offers potentially factor of 3 power savings for analog front-end. $335k($300k) 4.) 3-D pixel detector presently only viable choice for inner pixel layer other than a layer we replace yearly. Need to make more progress than last year. $200k

9 Requests for FY06 5.) Work on 0.13 micron CMOS and voltage conversion for powering modules. Very nice measurements made this past year on CMOS chip. Conceptual design of powering scheme worked out. Either this scheme or serial powering are essential for upgrade because of cabling constraints. $415k($200k) 6.) Work on optical readout. Plan based on working group meeting at Santa Cruz earlier this summer. Crucial to establish radiation limits of components and multiplexing schemes. Several schemes still possible. Institutions: Ohio State, Oklahoma, Oklahoma State, SMU, UC Santa Cruz. $430k($372k) Also want to continue radiation monitor work of Arizona at $20k in FY06. Total: $1,814k ($1,506k)

10 Liquid Argon Projects 1.) Study of Charge Build up Effects. Arizona $66k 2.) Analog Front-End Asic BNL, SUNY $255k 3.) Digital Readout Architecture NEVIS $300k 4.) Digital Optical Links SMU $170k 5.) Level 1 Interface BNL, Pittsburgh $15k 6.) Analog Optical Links BNL $75k 7.) ROD BNL $60k 8.) Power Supplies $75k Total Request: $1,016k

11 My Suggestions Delay items 5-8 and focus on other items. These are not as urgent or probably quite difficult (Analog Links). Makes it possible to get to $750k number, difficult to get to $494k target. This problem will persist into subsequent years unless target raised to $750k, or some tasks changed. Need some guidance on this issue. Would then discuss with Liquid Argon group.