LOGO Link It Company Supervised By: Mr.: Ahmed Abumsameh.

Slides:



Advertisements
Similar presentations
Drybridge Consulting Party Identification Directory Installing the Microsoft Research Service IDEAlliance and Drybridge Consulting – collaborating to deliver.
Advertisements

09/04/2015Unit 2 (b) Back-Office processes Unit 2 Assessment Criteria (b) 10 marks.
MIS 2000 Class 20 System Development Process Updated 2014.
Objective Understand web-based digital media production methods, software, and hardware. Course Weight : 10%
Dr Gordon Russell, Napier University Unit Data Dictionary 1 Data Dictionary Unit 5.3.
Reference and Instruction Automated Statistics Gathering and Reporting System Members: Patrick Chen (pyc7) Soo-Yung Cho (sc444) Gregg Herlacher (gah24)
15 Chapter 15 Web Database Development Database Systems: Design, Implementation, and Management, Fifth Edition, Rob and Coronel.
MSIS 110: Introduction to Computers; Instructor: S. Mathiyalakan1 Systems Design, Implementation, Maintenance, and Review Chapter 13.
CONTENTS  ABSTRACT  INTRODUCTION  HARDWARE & SOFTWARE REQUIREMENTS  PROBLEM ANALYSIS  MODULES DESCRIPTION  TABLE DESIGN  ER DIAGRAM  SCREEN SHOTS.
© InLoox ® InLoox PM Web App product presentation The Online Project Software.
STOCKDOC Advanced Stock Management System
"In the name of ALLAH, most Gracious, most Compassionate".
Conference management system Jordanian Renewable Energy Society (JRES)
A brief overview of the project By Group 2 Barry Amir Bhumi Shubh
Software Engineering Group Project Prepared by Abd Elkarim AbuGhali Mahmoud Badawi Norhan Abo Hani Supervised By Dr: Mohammed Mikii.
USING REFWORKS Fall What is RefWorks? A web-based bibliographic and database manager Creighton University faculty, students, and staff have access.
MU Bulletin Board Member: Carol Lim Yi Wang Lei Wen Mentor: John Boyer Programmer/Analyst of MSA/ Student Life.
Systems Development Life Cycle Dirt Sport Custom.
The purpose of this Software Requirements Specification document is to clearly define the system under development, that is, the International Etruscan.
Callis ApS, Copyright © Reviewer Training Material Callis Reviewer version 1.1.
Class Instructor Name Date. Classroom Tips Class Roster – Please Sign In Class Roster – Please Sign In Internet Usage Internet Usage –Breaks and Lunch.
بسم الله الرحمن الرحيم SOFTWARE ENGINEERING. Store System Prepared by Moamer.T.Sawafiri Ahmed.R.Abu saif Hasan.M.Ouda
Web Browser Security Prepared By Mohammed EL-Batta Mohammed Soubih Supervised By Eng. Eman alajrami Explain Date 10. may University of Palestine.
Bayu Priyambadha, S.Kom Teknik Informatika Universitas Brawijaya.
TriUlti Senior Project iFlowEdit HTML5 Canvas Workflow Diagram Editor Sponsored By iNNOVA IT Solution Inc.
CS 474 Database Design and Application Terminology Jan 11, 2000.
Search on the internet the different ways for building a website, and choose which one bests suits you for what website you are doing.
Final Year Project COMP390/393/394/395 Irina Biktasheva – coordinator
Principles of Information Systems, Sixth Edition Systems Design, Implementation, Maintenance, and Review Chapter 13.
Systems Development Life Cycle
University of Palestine Faculty of Applied Engineering and Urban Planning Software Engineering Department Prepared By Ahmed Obaid Wassim Salem Supervised.
LOGO 2 nd Project Design for Library Programs Supervised By Dr: Mohammed Mikii.
University Of Palestine. Department of Information Technology.
Palestine of University Faculty of Engineering Software Engineering Software project Prepared by :- supervised by Fawzy Al tayeb Yasmeen elbobo Eid ramadan.
Online Friends’ Community Presented by: Stuart Monaghan HND in Computing th May 2002.
1 Determining the High-level Direction of Information Systems Part 2.
Business System Analysis
11 CHAPTER INFORMATION TECHNOLOGY, THE INTERNET, AND YOU.
Learning Objective The students should be able to: a. state the definition of software b. state the usage of software c. list different types of software.
Database Systems I Content: –How to build a database application –Principles of database-system implementation Instructor: John Sieg Required Text:
WEP Presentation for non-IT Steps and roles in software development 2. Skills developed in 1 st year 3. What can do a student in 1 st internship.
CTP210 TERM PROJECT
Connecting with Computer Science2 Objectives Learn how software engineering is used to create applications Learn some of the different software engineering.
Principles of Information Systems, Sixth Edition 1 Systems Design, Implementation, Maintenance, and Review Chapter 13.
VIGNAN'S NIRULA INSTITUTE OF TECHNOLOGY & SCIENCE FOR WOMEN TOOLS LINKS PRESENTED BY 1.P.NAVEENA09NN1A A.SOUJANYA09NN1A R.PRASANNA09NN1A1251.
GROUP PresentsPresents. WEB CRAWLER A visualization of links in the World Wide Web Software Engineering C Semester Two Massey University - Palmerston.
Online School Management System Supervisor Name: Ashraful Islam Juwel Lecturer of Asian University of Bangladesh Submitted By: Bikash Chandra SutrodhorID.
Unit 3: Understand Multimedia Production and Web Design Objective 3.02: Develop Webpages Section A: Introduction to Web Development and Standards.
 Project Team: Suzana Vaserman David Fleish Moran Zafir Tzvika Stein  Academic adviser: Dr. Mayer Goldberg  Technical adviser: Mr. Guy Wiener.
UNIVERSITY MANAGEMENT SYSTEM
Supervisor: Tran Dinh Tri Group Members: Duong Ngoc Nhat-NhatDN01687 Nguyen Quang Minh-MinhNQ01717 Nguyen Quang Minh-MinhNQ01717 Duong Hoang Nam-NamDH01552.
Exam Schedule System by Sheikh Nur Jahan ID# Supervisor: Md. Ahsan Arif Project Presentation for Bachelor of Science Dept. of Computer Science.
Speed Cash System. Purpose of the Project  online Banking Transaction Information.  keeping in view of the distributed client server computing technology,
Cemetery Information Management System CEMETERY INFORMATION MANAGEMENT SYSTEM Supervisor: Mr.Trần Bình Dương Team Members:  Phạm Văn Bình  Ngô.
Advanced Higher Computing Science
Blood Bank Phạm Tiến Lập – SE02683 Nguyễn Sơn Hải – SE02879
Coach Route Searching System
Pre-Production Meet with the client to create a project plan:
RA-Team Supervisor: Tran Dinh Tri Member: Nguyen Hoang Duc(PM)
SEO Link Building Engine For Web-Admins
Information Technology Deanship
Introduction to System Analysis and Design
B2C Online Store. B2C Online Store Group Members Introduction Name: Muhammad Gulfam VU ID: MC Program: MCS Supervisor: Muhammad Qamar Usman.
An example of a pilot project as part of USP course:
University Event Management System
InLoox PM Web App product presentation
Objective Understand web-based digital media production methods, software, and hardware. Course Weight : 10%
Database Management Systems
NOTICE! These materials are prepared only for the students enrolled in the course Distributed Software Development (DSD) at the Department of Computer.
Outline Introduction o Definition of the problem o Overview of computer based payroll system o Purpose, scope o Existing system o Proposed system o System.
Presentation transcript:

LOGO Link It Company Supervised By: Mr.: Ahmed Abumsameh

Students Mohamed A.Al Ashy. 1 Bader aldeen J.alsabeh Hashem S.Humeed Shaaban Kh.alhello

Planning

Analysis

Contents Introduction,Problem Introduction,Problem 1 The project,Model 2 Requirements, Analyses 3 Entity Relationship,Class Diagram USE case models,Sequence Diagrams 5 Implementation & Design

Introduction  The name of software … Design an internet web application for Link IT System Company  Why are we selected this project: -Modern construction company and help this important cause and to develop a large information system for the company. -Place the company is in the middle homes for students on the project. -Users need like this system to reaction with it. -The company has a large system and it's important to convert it to web application. -We have a good connection with some company members and can help us to do like this project

Introduction Problem definition:  the organization use the paper systematic to archive his data and information  The advertisements which the organization made are not enough, and too cost.  Hard reaching to the information, or data, and the search function is too slow.

The project  Project Definition:  Project Goals: Design an internet web, connect with database.  Project Scope: The services of the project - Saving the data and the information of the customers, and training information. - Make the queries possible and the searching easier than before. - Advertisement services. The project will be sure about some things like….. -Decrease the errors, and loosing any information or data from the database. - Increasing the security of the data, from any risks.  Project Users: The people who will use the project

model  Work Breakdown: After we did the primary study of the project, we put the suitable work breakdown to this project, and we choose the waterfall development model.

Problem The phases of the waterfall model:  The first phase " REQUIREMENTS ANALYSIS & DIFINITION “  The second phase" SYSTEM & SOFTWARE DESIGN“  The third phase "IMPLEMENTATION & UNIT TESTING “  The fourth phase "INTEGRATION &SYSTEM TESTING “  The fifth phase "OPERATION & MAINTENANCE "

System and software design Implementation and unit testing Integration and system Requirements definition Operation maintenance

requirements  User requirements:  System requirements: Software Requirement - Microsoft Visio Microsoft project DreamWaver cs4 -WampServer 2.0 -SmartDrow Flash 8

Requirements (cont…)  None functional: -Reliability Our system as a website will be under many risks but we do the best to avoid all risks. -Availability The system will be available on 24 hour a day. -Security Authentication from username and password to login to related page…. -Maintainability The Manager can maintain any problem and modify any data. -Transferability/Portability Our system is a website so it is a platform independent and user can explore it by any web browser.

Requirements (cont…)  Functional Requirement: Detailed in the project file. Add ST, Delete ST, Modify ST, Add TE, Delete TE, Modify TE, Add CO, Delete CO, Modify CO,Report view, Login.

Project Developing  Project Description: The project is design a web to use it in the organization, to increase the efficiency, speed of the work and to decrease the wasting time in the data flaw.  The objectives: -Convert the paper system to computer system or web system. -Electronic advertisement by the web. -The web will solve all the search, wasting time, and the efficiency problems.  Project Organization: The project divided into submissions, and for every mission we have one man to do it.

Project Developing Project Developing (cont…) NameMission nameno Mohammed Al Ashy & Shaaban Al Hello 1.Studying the last system and analyzing it to produce the new one. 2.reviewing the work done by others. 3.coordinate the final version. 1 Shaaban Al Hello 1.making reports. 2.making the meeting reports. 2 Hashem humeed1.design the software 3 Hashem Humeed1.design the database 4 Bader Al Sabeh & Hashem humeed 1.programming the software 2.making the power point 5 Bader Al Sabeh1.general coordinator 6 Mohammed Al Ashy 1.rational rose programmer 7 And here you are the details with schedule time.

Risk Analysis  There are tow kind of risks: The first kind "the risks which face the project in general from beginning to finish it". -The time wasn't enough to make a good project. -The employees were busy. the second kind Risks may the customers, or users face in using the project. And these few problems are:  May the users or the manager want some modifying or some accessories? And to solve this problem by make a maintenance contact.  At beginning, the users and customers may not use the web good. And the solution of this problem is by training.

Resource Requirements  Hardware and software resource requirements: PART. A. Hardware Requirement -3 pc's -Scanner -Printer PART.B. Software Requirement -Microsoft Front Page Microsoft Word Microsoft Visio Microsoft project DreamWaver cs4 -WamoServer 2.0 -SmartDrow Flash 8

USE Case Models

Sequence For Viewing Marks

Sequence For Registration

Entity Relationship:

Class Diagram:

Implementation &Design  programming language: -Chose the programming language PHP Chosen because it is the language of art, met all the requirements of the system, where data structures, dealing with Internet sites and this was the main reason, because the system should work on the web. -Also convenient to control the color and form through the pages CSS, JavaScript and deal with this for the convenience of the user and good interaction with the system

Interface  Page to enter users and powers according to the type of user

Interface (Cont…)  Registration page on the site

Interface (Cont…)  Page of the trainee

the last  It is the last stage of the project and loads the web application for services from the company itself to be the experience of the new system, the user experience of the three rules of the Director, the coach and the trainee.

(cont…) the last (cont…)  The results are as follows: 1.A system (web application) the prerequisites set by the Director and the coach and the trainee has the same system requirements of the project: 1- high-efficiency 2- easy to use 3- easy data archiving 4- speed the search for data 5- easy download advertisements on existing courses and raised courses 6- deal with the Director of trainees or students are faster and easier

(cont…) the last (cont…)  The project won the admiration of both the Director and the coach and the trainee 3 and the problem faced in the training of the students in the beginning, but that problem was solved by increasing the number of trainers or supervisors on the stage of Testing.

End

LOGO Thank You!