LHQ Curing Mold Miao Yu Fermilab 07/26/2011. HQ and LQ Curing HQ coil curing (LBNL) 2 LQ coil curing For HQ, the pressure of the mandrel cylinder is set.

Slides:



Advertisements
Similar presentations
FNAL QXF Curing Mold Miao Yu, FNAL 04/16/2013. FNAL Curing Press Max. load/cylinder (ton/kN) Spacing (inch/c m) Max. load (kN/m) Max. load for LHQ (kN/m)
Advertisements

LQ Reaction & Impregnation Tooling Internal Review F. Nobrega, N. Andreev May 7, 2007.
LQ Reaction & Impregnation Tooling Internal Review F. Nobrega, N. Andreev August 13, 2007.
LQ Winding and Curing Tooling Internal Review F. Nobrega, N. Andreev April 9, 2007.
Long HQ coil drawings now available 1 Miao Yu. Dead voltage taps in TQ/LQ/HQ coils Inner layer: 24, outer layer: 12 (33 inner/23 outer per coil for TQ/LQ/HQ)
Intake & Exhaust Team James Hogge Rebekah McNally Alisa Phillips Henos Woldegiorgis Upright Team Lloyd Outten Joseph Perry Josh Carroll Taylor Watkins.
LHQ Coil 02 Winding and Curing Plan Miao Yu 03/21/13.
LHQ Coil 1 OL Curing LHQ Coil 1 Shipping Miao Yu 02/28/2013.
3 rd Harmonic He Vessel Welding Helium Vessel-to-Cavity No June 2008.
BROOKHAVEN SCIENCE ASSOCIATES Manufacturing and Quality Assurance Magnet Production Workshop Frank DePaola April 11-12, 2012.
LHQ Curing Mold Simulation Analysis Miao Yu Fermilab 08/02/2011.
Vacuum Vessel Production Readiness Review
Dan Cheng H. Felice, R. Hafalia QXF Structures Video Meeting July 10, 2014 Coil Handling for Magnet Assembly Status Update.
S. Caspi, LBNL HQS Progress Report High Field Nb 3 Sn Quadrupole Magnet Shlomo Caspi LBNL Collaboration Meeting – CM11 FNAL October 27-28, 2008.
By: Joseph Martinez University of Michigan Supervisor: Dave Pushka, NuMI Project 3Q120-M Quadrupole Magnet Transport.
Automotive Bearings and Sealants
1 BROOKHAVEN SCIENCE ASSOCIATES Abstract Mechanical Engineering Issues Sushil Sharma, NSLS-II Project The NSLS-II storage ring requires multipoles and.
LARP QXF 150mm Structure Mike Anerella / John Cozzolino / Jesse Schmalzle November 15, nd Joint HiLumi LHC-LARP Annual Meeting.
Curing Mold Laminations Miao Yu 05/17/2012. QC on the cross-section 30/30 samples before production 16/500 samples during production 2.
SQXF 25 m Cable Practice Winding at LBNL Miao Yu Dan Cheng 10/31/2013.
LHQ Coil Fabrication Experience and Plan Miao Yu 04/08/2013.
Mechanical Engineering Analysis. Material Selection Process WoodStainless Steel HDPEAluminumPTFE Cost Machinability Strength Durability
Coil Design and Fabrication Miao Yu Outline Introduction Coil Design –Coil Pole –Coil End Parts –Coil Insulation Coil Fabrication –Winding.
VC Training Table Setup and Floating Agenda General –Air Supply Requirements Assembly –Assembling the System –Leveling the Table –Isolating.
Task7: NUSTAR2 - Design and Prototype Construction of a Radiation-Resistant Magnet C. Mühle GSI Task leader: G. Moritz /GSI.
Manufacturing Process A sequence of operations, often done on a machine or at a given area During a manufacturing process, we add, subtract, or form materials.
FNAL QXF Curing Mold Miao Yu, FNAL 05/07/2013. FNAL Short Curing Press 2 2 meter long Capacity (pump psi) Max. force/cylinder kN (ton) Spacing cm(inch)
DOE Review of LARP – February 17-18, 2014 Coil Design and Fabrication Miao Yu February 17,
LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 06 June 2006 No 1 /17 LARP Phase II Secondary Collimator RC1 Collimator Test Program Plan Forward Revised.
Flex Cam – Training This shows one version of a complete FlexCam system including Power Unit HCP and Compact Cam CC for piercing operation.
SQXF Winding Test Proposal Concept at LBNL Dan Cheng Sept 17, 2013.
LHQ Coil 02 Winding and Curing Miao Yu 07/11/2013.
Brookhaven - fermilab - berkeley US LHC ACCELERATOR PROJECT LHC IRQ Inner Triplet Review Q1, Q2, and Q3 Mechanics T. Nicol April 24-25, 2007.
FVTX Review, November 17th, FVTX Mechanical Status: WBS 1.6 Walter Sondheim - LANL Mechanical Project Engineer; VTX & FVTX.
STATUS REPORT ON DIPOLE MAGNETS FOR TRANSFER LINE-2 FOR CTF3 22 Jan 2008 S.S. PRABHU, A. K. JAIN & V. C. SAHNI RRCAT, INDORE (INDIA)
Summary The process and the components The tooling Production back log estimation The handles and the estimated cost and delay.
LMQXFA Cold Mass Assembly Antonios Vouris Fermilab February 3, 2016.
LARP Collaboration Meeting Racetrack Coil Fabrication
Dan Cheng, Helene Felice 4/8/2015 MQXFS-D Build-up LBNL “Lessons Learned”
1 MQXF Workshop on Structure, Alignment, and Electrical QA Feb 2-4, 2016 Options for modifications to parts and procedures Options for modifications to.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
MQXFB design, assembly plans & tooling at CERN J.C Perez On behalf of MQXF collaboration team MQXF Workshop on Structure, Alignment and Electrical QA.
Fabrication of test coil for D1 2m model Michinaka SUGANO KEK WP3 meeting 08/10/2014.
DOE Review of LARP – February 17-18, 2014 SQXF Coil Design and Fabrication Winding and Curing Miao Yu February 17,
Exercises in Hydraulic Bulge Testing H.S. Kim H. Lim Mike Sumption Ted Collings The Ohio State University Dept of Materials Science and Engineering Center.
Cold Mass and Assembly Tooling Design, Procurement Status and Assembly Plan Igor Novitski Fermilab 15 T Dipole Design Review April 2016 April 28-29,
MQXFB Prototype structure and plans at CERN J.C Perez On behalf on MQXF collaboration team Joint HiLumi-LARP Meeting & 24 th LARP Collaboration Meeting.
CONCEPTUAL DESIGN OF D2 MECHANICAL STRUCTURE (DOUBLE COLLARING OPTION) S. Farinon, P. Fabbricatore (INFN-Sezione di Genova) Sept. 24 th 2015.
QXF Reaction / Impregnation Fixtures J. Schmalzle 4/9/13.
QXF Winding/Curing Tooling and Curing Mold Miao Yu, FNAL 04/09/2013 CM20_Napa Valley, CA.
BNL - FNAL - LBNL - SLAC 6m (and 8m) scale-up Giorgio Ambrosio Fermilab Contributions from: Fred Nobrega, Rodger Bossert, Guram Chlachidize (FNAL) Jesse.
Dan Cheng 8/27/2015 MQXFS1 Observations and Feedback from the Assembly Processes, Part II.
LHQ Coil Design and Features Miao Yu Fermilab May 09, 2012.
LHQ01 IL Curing Miao Yu 01/31/2013. LHQ IL Packing for Curing 2.
LHQ Coil Fabrication Experience and Plan Miao Yu 04/08/2013.
ENGINEERING MANUFACTURING METHODS
Ceramic 3D Printer Jeffrey Ellard Melissa Falvy Austin Jefferson
QXF Coil Fabrication & Tooling Reaction / Impregnation
Procurement Status Miao Yu 11/19/2013.
SeaPerch Structural System
SeaPerch Structural System
LARP Phase II Secondary Collimator RC1
Support structure and target pre-stress
Helene Felice 02/15/2013 HiLumi Meeting HQ Program
Glyn Kirby Magnet AssemblyTechniques.
Far Detector Activities Late 2017 – Early 2018
SeaPerch Structural System
SeaPerch Structural System
GENERAL MOULD CONSTRUCTION CONCEPT
Helene Felice 02/15/2013 HiLumi Meeting HQ Program
Presentation transcript:

LHQ Curing Mold Miao Yu Fermilab 07/26/2011

HQ and LQ Curing HQ coil curing (LBNL) 2 LQ coil curing For HQ, the pressure of the mandrel cylinder is set at 500 psi The pressure of the main cylinder is 2,500 psi and the cavity is closed. Hold the platen position during curing. The pressure of the main cylinder increases to 3,500 psi. For LQ, the pressure of the mandrel cylinder is set at 600 psi The pressure of the main cylinder is 750 psi and the cavity is closed. Keep the pressure in both the mandrel cylinder and the main cylinder during curing. Adjust the platen position.

LHQ Curing Mold Modification on the HQ curing mold cross-section [234.95] [69.85] Die spring 1” OD * 1.25” Length Max. load: 321 lbs (Mcmaster) [254.0]

LQ Mold Deflection µm 4.3 µm

HQ Mold Deflection µm 8.3 µm

LHQ Mold Deflection µm 8.8 µm

Curing Pressure Mandrel Cylinder (pump psi) Main Cylinder (pump psi) Mandrel Support (MPa) Coil (MPa) TQ LQ HQ (3500) (27.3) LHQ Note: the cylinder pressure is converted to the effective load TQ Press: Mandrel cylinder (6), 10,000 pump psi ~ 10 tons Main cylinder (7), 10,000 pump psi ~ 60 tons LQ & LHQ Press: Mandrel cylinder (24), 10,000 pump psi ~ 15 tons Main cylinder (28), 10,000 pump psi ~ 200 tons HQ Press: Mandrel cylinder (7), 10,000 pump psi ~ 10 tons Main cylinder (10 + 4), 10,000 pump psi ~ 55.2 tons tons

EDM Block or Lamination ’’ long 2” EDM block 168 ’’ long 1/16” Lamination 348 ’’ long 1/16” lamination The short assembly requires the steel cylinders as the spacers put in between the top and bottom platens. 40 transport systems (wheel assembly) Max. load: 321*40 = 12,840 lbs 348” mold cavity weight: ~6600 lbs 160” coil envelop weight < 1700 lbs (SS) 348” coil envelop weight < 3700 lbs (SS) Rods+heaters+tie bars+… : ~500 lbs

Comparison of Cost Estimation 9 Method/CategoryM & STech LaborEDIATotal 348” EDM$217 k$23 k$52 k $291 k ± 58 k 168” EDM$109 k$15 k$52 k $176 k ± 35 k 348” Lamination$91 k$24 k$52 k $167 k ± 33 k 168” lamination$71 k$15 k$52 k $138 k ± 28 k * Note: the cost of the cylinders for the168’’ long mold was not included.

Cost Estimation for Lamination 10 LHQ 348" Curing Mold Assembly Variation20% $ 33,000 Sub-total $ 167,000 M & S $ 91,072 Toolingunitamount$/unit $ 42,440 Lamination stamping dieea1 $ 30, $ 30,000Final stamping profile, Note 1 Pre-notch dieea1 $ 10, $ 10,000Pre-stamp for stress-relief, Note 1 Short-stack toolingea1 $ $ 600Stacking 2' stacks Stacking toolingea1 $ 1, $ 1,200~7' stack on inclined table Mandrel for emery clothea2 $ $ 640Polishing profile interior Mold partsunitamount $/unit $ 48, Sphero Annealed Steellbs11200 $ 1.60 $ 17,920Note 1 Stampingea5600 $ 1.02 $ 5,712Note 1 Tie bars (staggered pieces)set6 $ $ 720 Tie rods (welded at FNAL)ea6 $ $ 2,880 Wheel assembliesassy40 $ $ 16,800 Top shim platesea8 $ $ 4,400Hardened, counterbored Hardware, misclot1 $ $ 200 Total Labor $ 76,216 Technician /hr$100techshrs/techqty parts $ 24,376 Clean 5600 laminations2161 $ 3,200 Inspect 10% to verify crown141 $ 400 Stack short stacks2115 $ 3,000 Weld short stacks $112/hr1115 $ 1,680 Attach wheel assemblies2140 $ 8,000 Align on transfer table281 $ 1,600 Weld tie rods (set of 6) $112/hr181 $ 896 Dress welded tie rods (set of 6)141 $ 400 Assemble with tie bars281 $ 1,600 Polish contour with emery cloth2161 $ 3,200 Inspect assembly141 $ 400 EDIAnum.wkspay rate/hr $ 51,840~ 0.25 FTE Engineer16108 $ 25,920 Designer13108 $ 12,960 Drafter12108 $ 8,640 QA11108 $ 4,320 Notes: 1) The above utilizes material values supplied by TD's Q&M Material Control Group. 2) Machining of short stacked packs can be more cost effective by mounting multiple stacks on the mill to make the cuts. 3) Heating element are excluded from this estimate. 4) EDIA: Engineering, Design, Inspection and Administration. 5)Sharpen the die after 3,000 pieces of lamination.

Conclusion The HQ curing mold cross-section can be modified to fit in the curing press. The deflection of the LHQ cavity is simulated and compared with the other curing cavities. The LHQ coil deflection in x-direction (open) during curing process is less than 8.6 µm. The cost of mold assembly using 2”EDM block and 1/16” lamination is estimated and compared. The long mold lamination assembly is preferred, and the total cost is estimated. 11