McLean VA, May 3, 2010 SG Systems Systems Requirements Specification Approach Overview.

Slides:



Advertisements
Similar presentations
Connected Health Framework
Advertisements

SG-Systems Boot Camp Use Case Process with TOGAF AMI-ENT Example Kay Stefferud Chair, SG-Systems Use Cases For more information visit:
“SG-Systems” (Smart Grid – Operational Applications Integration) “Boot Camp” Overview Greg Robinson, Co-Chair, SG-Systems Brent Hodges, Chair, SG-Systems.
Knoxville, TN Oct. 19, 2009 AMI-Enterprise Systems Requirements Specification Overview.
UCAIug HAN SRS v2.0 Summary August 12, Scope of HAN SRS in the NIST conceptual model.
May 2010 Slide 1 SG Communications Boot Camp Matt Gillmore 03/07/11.
0 © 2011 Silver Spring Networks. All rights reserved. Building the Smart Grid.
Vendor Briefing May 26, 2006 AMI Overview & Communications TCM.
September 30, 2011 OASIS Open Smart Grid Reference Model: Standards Landscape Analysis.
Slide 1 UCAIug OpenSG OpenADE Automated Data Exchange Requirements NAESB ESPI Energy Services Provider Interface Standard Specification Overview November.
Smart Grid - Cyber Security Small Rural Electric George Gamble Black & Veatch
OmniRAN Smart Grid use case Document Number: Omniran Date Submitted: Source: Max Riegel Nokia.
Advanced Metering Infrastructure AMI Security Roadmap April 13, 2007.
Slide 1 UCAIug OpenSG OpenADE Automated Data Exchange Requirements NAESB ESPI Energy Services Provider Interface Standard Specification Overview.
ISS IT Assessment Framework
OpenFMB Specification Development Plan
# 1 Information Exchange Standards Development Collaboration for AMI and HAN For further information, contact: Wayne Longcore
Business Technology Solutions B usiness T echnology S olutions Smart Grid Program Consumers Energy’s focus on Using and Enhancing Industry Standards.
OpenFMB Specification Development Plan
Enterprise Architecture
1 SmartMeter™ Delivering Customer Benefits Jana Corey Director, Policy Planning Integrated Demand-side Management Pacific Gas and Electric Company.
Training of master Trainers Workshop 10 – 15 November 2012 e-Services Design and Delivery Module VI Emilio Bugli Innocenti.
B usiness T echnology S olutions AMI – Advanced Metering Infrastructure Consumers Energy Mark Ortiz March 9, 2011.
Getting ready for Advanced Metering Infrastructure Paper by : Rajesh Nimare Presented by : Prashant Sharma.
TeleManagement Forum The voice of the OSS/BSS industry.
Developing Enterprise Architecture
Future of Smart Metering Kansas Renewable Energy & Energy Efficiency Conference September 26, 2007.
TDT4252/DT8802 Exam 2013 Guidelines to answers
Engineering, Operations & Technology | Information TechnologyAPEX | 1 Copyright © 2009 Boeing. All rights reserved. Architecture Concept UG D- DOC UG D-
© 2008 Eventure Events. All rights reserved. Standard interfaces & lower TCO in AMI Klaus Heiman, Wayne Longcore SAP, Consumers Energy.
EDISON INTERNATIONAL® SM SCE Project Story CIM User Group 10/12/2010 Jim Horstman Southern California Edison.
Darren Highfill Chairing on behalf of Erich W. Gunther UtilityAMI Chairman/Facilitator Chairman/CTO – EnerNex Corporation Utility Industry.
# 1 AMI Enterprise Task Force of the Utility AMI Working Group SRS Team Status Report (Palo Alto, Jan. 09) Joe Zhou.
# 1 AMI Enterprise Task Force of the Utility AMI Working Group Overview & Plans For further information, contact Wayne Longcore Chairman of AMI-Ent TF.
Maureen Trumble Jack Hobbick AMI – Providing the Smart Grid Foundation.
OpenSG Status UCAIug Members Meeting Chris Knudsen – Chair Gary Stuebing – Vice-Chair November 9 th, 2009.
“SG-Systems” (Smart Grid – Operational Applications Integration) “Boot Camp” Overview Greg Robinson, Co-Chair, SG-Systems Brent Hodges, Chair, SG-Systems.
AMI Enterprise Developing Interoperability for Distribution Systems January 2009 Terry Mohn, Technology Strategist SDG&E Vice Chairman, GridWise Alliance.
Distribution and components. 2 What is the problem? Enterprise computing is Large scale & complex: It supports large scale and complex organisations Spanning.
SG Systems - Service Definition Team Chair: Gerald Gray, Guiding Principle Consulting Co-Chair: Shawn Hu, Xtensible Solutions.
Dec UtilityAMI OpenHAN TF Requirements Working Group Specification Briefing January 2008.
Today’s Agenda Agree on recurring meeting secretary
12 May 2011 CIM Users Group 2011 Goals Spring Meeting, Prague 12 May 2011.
Guiding Principles A Walkthrough. 4 Parts Name – a brief title that identifies the principle Description – a paragraph that describes what the name covers;
Knoxville, TN October 20, 2009 SG-Systems Systems Requirements Specification Team Status and Breakout Session.
Enterprise Architecture HOW COMPANIES ARE EXPLOITING INFORMATION TO THROUGH IT.
# 1 AMI Enterprise Task Force of the Utility AMI Working Group SRS Team Plan Discussion For further information, contact Joe Zhou Team Lead
Boot Camp - Conformity July 19, 2010 Detroit, USA.
OpenHAN TF Meeting Where do we go next? Erich W. Gunther.
Erich W. Gunther UtilityAMI Chairman/Facilitator Chairman/CTO – EnerNex Corporation Jerry Melcher Onsite facilitator for this meeting.
Overview AMI-Enterprise For further information, contact: Wayne Longcore Chair of AMI-Enterprise Task Force, Board Of Directors.
SG-Systems Working Group Status: Active, meet once at each face-to-face meeting Charter: The SG-Systems Working Group defines requirements, policies, and.
Open Smart Grid (OpenSG) Technical Committee Plenary October 20, 2009.
OpenHAN SRS v1.95 Overview June 8, OpenHAN SRS v Introduction  OpenHAN area of focus within the NIST conceptual model.
Managers Guide to AMI Enterprise. AMI Enterprise What it is Why you need to be involved How you get involved Who from your organization needs to be involved.
June California Investor Owned Utilities (IOU) HAN vision statement development 15 June 2007.
ELECTRONIC SERVICES & TOOLS Strategic Plan
Slide 1 EIM Charter Identify and articulate common EIM requirements: Use cases System Requirements Specification (SRS) Work with other OpenSG groups, particularly.
“SG-Systems” ( Smart Grid – Operational Applications Integration ) Charter & Status Greg Robinson, Co-Chair, SG-Systems Brent Hodges, Chair, SG-Systems.
Metering Americas April 24, 2006 Advanced Metering.
Basic Concepts Key Learning Points : The objectives of this chapter are as follows:  To provide an introduction to the basic Concepts of enterprise architectures,
Open SG and SG-Systems Overview for IEC TC57 Working Groups For further information, contact: Greg Robinson Convener of IEC.
Enterprise Architectures Course Code : CPIS-352 King Abdul Aziz University, Jeddah Saudi Arabia.
AMI Enterprise Task Force of the Utility AMI Working Group
CIM Modeling for E&U - (Short Version)
TeleManagement Forum The voice of the OSS/BSS industry.
“SG-Systems” (Smart Grid – Operational Applications Integration) “Boot Camp” Overview Brent Hodges, Chair, SG-Systems Greg Robinson, Co-Chair, SG-Systems.
“SG-Systems” (Smart Grid – Operational Applications Integration) Charter & Status Brent Hodges, Chair, SG-Systems Greg Robinson, Co-Chair, SG-Systems.
AMI Security Roadmap April 13, 2007.
Presentation transcript:

McLean VA, May 3, 2010 SG Systems Systems Requirements Specification Approach Overview

McLean VA, May 3, 2010 SRS Document online SG Systems  OpenAMI-Ent  Shared Documents  SRS

McLean VA, May 3, 2010 Topics Purpose and Scope Interoperability Philosophy Documentation Approach Guiding Principles Reference Architecture Architecture Views –Business –Application –Data –Technical

McLean VA, May 3, 2010 Purpose and Scope The purpose of this document is to provide the architecture vision and requirements to serve as the “rules of engagement” for how vendors and utilities could implement recommended requirements and design specifications. Mainly focus on the AMI-ENT which is about how applications within the utility enterprise are to be integrated and composed to support AMI related business processes and functions. It is to deal with inter-application related business functions and stops at the boundaries of applications and the edge of utility enterprise. Edge applications are those applications that communicate with networks and devices in the field, as well as those that communicate with other businesses or enterprises (generally defined as third parties).

McLean VA, May 3, 2010 AMI-ENT Scope

McLean VA, May 3, 2010 OpenADE Scope 6

McLean VA, May 3, 2010 OpenHAN - Scope 7

McLean VA, May 3, 2010 OpenADR – Scope 8

McLean VA, May 3, 2010 Semantic Interoperability

McLean VA, May 3, 2010 Documentation Approach According to The Open Group, there are four architecture domains that are commonly accepted as subsets of an overall enterprise architecture, all of which TOGAF is designed to support: –The Business Architecture defines the business strategy, governance, organization, and key business processes. –The Data Architecture describes the structure of an organization's logical and physical data assets and data management resources. –The Application Architecture provides a blueprint for the individual application systems to be deployed, their interactions, and their relationships to the core business processes of the organization. –The Technology Architecture describes the logical software and hardware capabilities that are required to support the deployment of business, data, and application services. This includes IT infrastructure, middleware, networks, communications, processing, standards, etc.

McLean VA, May 3, 2010 Guiding Principles [mjz1] {AEP} Something should be said about companies' tendency to overestimate their differentiators. After all, a utility-driven process is the default and results in everybody rolling their own. [mjz1] [mjz2] {AEP} Standards that are almost, but not quite, good enough may be worse than no standard at all. The key is knowing HOW to build upon a standard (and knowing how to build a standard that can be built upon). This is something that a lot of people think is obvious and easy. It's...not.[mjz2] [mjz3] {AEP} The phrase "common information model" is here used in its plain-English sense, but it is also the name of a body of standards, inviting confusion.[mjz3] #NameDescription 1Utility driven and open process The process for developing, reviewing and ratifying the AMI-ENT specifications and artifacts including the SRS should be driven by utilities and contributed to by vendors. It shall be open to all members of UCAIug. 2Business driven architecture and design Requirements and architecture patterns and designs of this effort shall be driven by real world business requirements of AMI. 3Open interoperabilityThe IEEE defines interoperability as: the ability of two or more systems or components to exchange information and to use the information that has been exchanged. A complete interoperable solution requires systems or components to interoperate at both the technical and semantic levels. 4Leverage and collaborate with industry standards Where relevant industry standards exist to provide references, best practices, existing work products, and future directions, they should be leveraged to reduce time and increase quality of this effort. 5Actionable, testable and transferable work products Any work (artifacts) that are created can be used by the audience for this work, e.g. utilities, vendors, regulators, etc. There needs to be clear, explicit guidance for how to use the artifacts. There is an expectation that the work products are useful at lower levels of design 6Platform IndependenceRequirements and design artifacts shall be platform independent. Implementation technologies shall be chosen due to its level of acceptance at the marketplace as open standards. 7Common and Logical Reference Model Common components with known definitions that can be agreed upon; that they contain a common functionality that can be defined. This may be organized as logical business applications; there is an understanding of what applications will provide/consume what services. 8Common Information Model Common definition of meanings and relationships of how to represent information that are often context dependent. 9ExtensibilityThis activity will prioritize functions with a focus on AMI functions, but does not preclude future extensions of the architecture; e.g. smart grid. Implementation of AMI will also vary from utility to utility.

McLean VA, May 3, 2010 AMI-ENT Reference Architecture

McLean VA, May 3, 2010 Business View (AMI) Business Processes: B1 - Meter Reading B2 - Remote Connect/Disconnect B3 - Detect Theft B4 - Contract Meter Reading Consolidated Demand Response and Load Control C1 - Price Based DR and Voluntary Load Control C2 - Customer Views Energy Data C3 - Prepayment C4 - Third Parties Use AMI Network D2 - Distribution Automation D3 - Distributed Generation D4 - Outage Location and Restoration G1 - Gas System Measurement G2 - Gas System Planning G3 - Gas System Corrosion Control I1 - AMI System Installation I2 - AMI System Life-cycle Management I3 - Utility Updates AMI System S1 - AMI System Recovery

McLean VA, May 3, 2010 Business View (DR)

McLean VA, May 3, 2010 Business View (ADE) Draft

McLean VA, May 3, 2010 Application View

McLean VA, May 3, 2010 Data View

McLean VA, May 3, 2010 Technical View (Components)

McLean VA, May 3, 2010 Technical View (Patterns)

McLean VA, May 3, 2010 Here is the link to the AMI-ENT SRS v1.0 document (under SRS folder): uments/Forms/AllItems.aspx uments/Forms/AllItems.aspx If you have comments and/or wish to join and contribute to the AMI-ENT SRS effort, please contact Joe Zhou at Contact Info.