Simulating the MICE target M. Apollonio, A. Dobbs - IC 27/11/20081MICE Target Workshop - IC.

Slides:



Advertisements
Similar presentations
1April, UKNF09 - Lancaster1 MICE Beamline m. apollonio.
Advertisements

1 MICE Beamline: Plans for initial commissioning. Kevin Tilley, 16 th November. - 75days until commissioning Target, detectors, particle production Upstream.
The MICE Target Lara Howlett University of Sheffield.
MICE TARGET OPERATION C. Booth, P. Hodgson, R. Nicholson, P. J. Smith, Dept. of Physics & Astronomy University of Sheffield, England.
ISIS Related Issues for MICE Adam Dobbs Proton Accelerator Development Meeting, RAL 24 th March /03/20111A. Dobbs.
TJR Feb 10, 2005MICE Beamline Analysis -- TRD SEPT041 MICE Beamline Analysis – TRD SEPT04 Tom Roberts Muons, Inc. February 10, 2005.
MICE Beam Loss vs Particle Rate Adam Dobbs, ISIS Meeting, 18 th December 2009.
ISIS-MICE TGT alignment m. apollonio IC purpose: understand sources of reduced rate comment: probably a 2 nd order effect CAVEAT: result still preliminary,
MICE Particle Rate and ISIS Beam Loss Adam Dobbs, Target – ISIS Meeting, 17 th September 2010.
Target Shaft Simulation with G4Beamline M. Apollonio, IC.
On MICE Coordinate System Yury Ivanyushenkov RAL.
TJR 10/30/031 MICE Beam rates Tom Roberts Illinois Institute of Technology 10/30/03.
March 30, 2004 TJR1 MICE Target Source Calculations Tom Roberts Illinois Institute of Technology March 30, 2004.
MICE analysis meeting - (6/4/2006) 1 Update on MICE – step III M. Apollonio – University of Oxford.
124/3/2010CM26 - Riverside1 m. apollonio ( ,P) matrix.
Luminosity Monitor Commissioning MICE Collaboration Meeting March 2010 Paul Soler, David Forrest Danielle MacLennan.
M.apollonioMICE Funding Agency Committee Meeting - RAL 18/4/ M. Apollonio – MICE Operations Manager University of Oxford MICE beam line commissioning.
K.Walaron Fermilab, Batavia, Chicago 12/6/ Simulation and performance of beamline K.Walaron T.J. Roberts.
Target Test Report Given permission for a maximum of 5000 actuations. Performed 3679 actuations, 3654 with the gate valve open. Ran target at 0.4 Hz to.
Physics 151: Lecture 20, Pg 1 Physics 151: Lecture 20 Today’s Agenda l Topics (Chapter 10) : çRotational KinematicsCh çRotational Energy Ch
1 On MICE Coordinate System Yury Ivanyushenkov RAL MICE Collaboration CERN, 29 March - 2 April 2004.
Target/Beam Interaction M. Apollonio, A. Dobbs - IC 27/11/20081MICE Target Workshop - IC.
ISIS Beam Protection System and MICE operation. Dean Adams 29 Nov 07 Presented by Chris Rogers.
1June 1 st 2009MICE CM24 - RAL1 MICE Beamline m. apollonio.
MOM - M.ApollonioAccel. R&D/Physics and IADR - RAL - 19/3/ Summary of MICE operations – 14/15 March 2008 AIMS - establish MICE beamline in ISIS synchrotron.
July 22, 2005Modeling1 Modeling CESR-c D. Rubin. July 22, 2005Modeling2 Simulation Comparison of simulation results with measurements Simulated Dependence.
14/1/20097 January 2009MICE CM23 - Harbin - Beamline Session1 MICE Beamloss Data Adam Dobbs.
The MICE beam line status a)Muon BL: P=208 MeV/c, emi_N= 7 mm rad “... the mother of all the beamlines “ b)Proton BL: derived from (a) by rescaling magnet.
Setup of laser tracker on DX side NOTE: X axis along M1s centers, towards SX Z axis along M1-M2 centers, towards M2.
GRD - Collimation Simulation with SIXTRACK - MIB WG - October 2005 LHC COLLIMATION SYSTEM STUDIES USING SIXTRACK Ralph Assmann, Stefano Redaelli, Guillaume.
2002/7/02 College, London Muon Phase Rotation at PRISM FFAG Akira SATO Osaka University.
F Project X Overview Dave McGinnis October 12, 2007.
Two-Dimensional Rotational Kinematics 8.01 W09D1 Young and Freedman: 1.10 (Vector Products) , 10.5.
Target material and thickness considerations Alain Blondel, with thanks to Dean Adams and Dan Kaplan Priority for rebuild is to have a target mechanism.
W. Scandale 1 Status of UA9 Walter Scandale CERN CC09 5 th workshop on crystal channeling March 2009.
Target Shaft Simulation with G4Beamline M. Apollonio, IC.
October 4-5, Electron Lens Beam Physics Overview Yun Luo for RHIC e-lens team October 4-5, 2010 Electron Lens.
Luminosity Monitor UKNF Meeting 7 June 2010 Paul Soler, David Forrest Danielle MacLennan.
Status of Scaling FFAG Phase Rotation ICOOL Simulations Ajit Kurup ISS Machine Group Meeting 27 th July 2006.
Particle Production in the MICE Beamline IPAC10 Linda Coney, UC Riverside, Adam Dobbs, Imperial College London, Yordan Karadzhov, Sofia University The.
1 Beam and Target Issues Chris Booth 5 th May 2004.
Oct. 6, Summary of the Polarisation Session J. Clarke, G. Moortgat-Pick, S. Riemann 10 November 2006, ECFA Workshop, Valencia.
MICE TARGET OPERATION C. Booth, P. Hodgson, P. J. Smith, Dept. of Physics & Astronomy University of Sheffield, England. 1 – The MICE Experiment2 - The.
MICE Run Plan Sept/Oct 2009 m. apollonio – IC MACHINE PHYSICS USERs RUN NO SHIFT A B C D E.
March 18, 2008 TJRMICE Beamline Status1 MICE Beamline Status (March 18, 2008) Tom Roberts Muons, Inc. Illinois Institute of Technology.
Instrumentation and Simulations for Target Test MICE Collaboration Meeting 22 October Bill Murray 1, Paul Soler 1,2, Kenny Walaron 1,2 1 Rutherford.
1 Question to the 50GeV group 3GeV からの 54π と 81π 、 6.1π の関係 fast extraction 部の acceptance (81π?) Comments on neutrino beamline optics?
 A model of beam line built with G4Beamline (scripting tool for GEANT4)  Simulated performance downstream of the AC Dipole for core of beam using  x.
MICE Target Failure UKNFIC Meeting Adam Dobbs - when and why 4 th July 2008.
Target/Beam Interaction M. Apollonio, A. Dobbs - IC 27/11/20081MICE Target Workshop - IC.
ISIS Beam and MICE Target Simulation MICE Collaboration Meeting Adam Dobbs 19 th Oct 2008.
Nufact02, London, July 1-6, 2002K.Hanke Muon Phase Rotation and Cooling: Simulation Work at CERN new 88 MHz front-end update on cooling experiment simulations.
M. apollonio 7/7/2010CM27 - RAL11 Beam-Line Analysis …
Rotational Dynamics The Action of Forces and Torques on Rigid Objects
A Student on MICE Adam Dobbs, Imperial College Goldsmith’s Particle Physics Summer School 21 st July 2009.
V.Aulchenko 1,2, L.Shekhtman 1,2, B.Tolochko 3,2, V.Zhulanov 1,2 Budker Institute of Nuclear Physics, , Novosibirsk, Russia Novosibirsk State University,
J-Parc Neutrino Facility Primary Proton Beam Design A. K. Ichikawa(KEK), Y.Iwamoto(KEK) and K.Tanabe(Tokyo) et.al. 7 th Nov. 2003,
Doubling the Target Insertion Rate P J Smith for MICE VC 163.
CRYSTALS AS LONG-TERM IMPROVEMENT FOR LHC COLLIMATION
Background simulations: update and simulations of absorbed dose
Alignment and beam-based correction
Beam-Line Analysis m. apollonio 7/7/2010 CM27 - RAL 1.
MICE Beamline Status m. apollonio 17 December 2009 MICE VC
Luminosity Monitor Status
Introduction Goal: Can we reconstruct the energy depositions of the proton in the brain if we are able to reconstruct the photons produced during this.
A BeamLine update m. apollonio 7/7/2010 CM27 - RAL 1.
Sensitivity tests of BLM_S chamber in PSB dump
K. Tilley, ISIS, Rutherford Appleton Laboratory, UK Introduction
Discussion of High Energy Proton Losses in Arc 7
RC1 Prototype Conceptual Design Review 15 December, 2005
Presentation transcript:

Simulating the MICE target M. Apollonio, A. Dobbs - IC 27/11/20081MICE Target Workshop - IC

Motivations: Optimise secondary production minimising dangerous losses in ISIS Assess better orientation/shape of the shaft for secondary production A work at “four hands”: –A. Dobbs, ORBIT simulation of ISIS ring/interaction with target/comparison with taken data from MICE shifts, –MA, G4Beamline simulation of secondary production with a set of shafts. 27/11/20082MICE Target Workshop - IC

G4Beamline Studies 27/11/20083MICE Target Workshop - IC

10 mm X Z 25 deg Q1-TGT axis 25 deg lost to Q1 secondaries production 20<theta<30 propagation to plane A acos(Pz/Ptot)>20 && acos(Pz/Ptot)<30 rotation & propagation to plane B A A B C shift & align with Q1-TGT axis LONG SLIM 4

25 deg FAT SHORT TILTED TGT 10o / 25o 27/11/20085MICE Target Workshop - IC

25 deg Cylinder: OD=6mm/ID=4.7 mm Materials: Ti Be Al 27/11/20086MICE Target Workshop - IC

Tgt_long_slim_rot0: y:x Nprimaries=100M 27/11/20087MICE Target Workshop - IC A

Tgt_long_slim: y:x rotation 25 deg + shift /11/20088MICE Target Workshop - IC B

27/11/20089MICE Target Workshop - IC at Q1 plane in Q1 bore C

Tgt_tilt25_rot0: y:x Nprimaries=10M 27/11/200810MICE Target Workshop - IC A

At Q1 plane Q1 bore 27/11/200811MICE Target Workshop - IC C

Tgt_short_fat_rot0: y:x 27/11/200812MICE Target Workshop - IC

Tgt_cyl_rot0: y:x 27/11/200813MICE Target Workshop - IC

27/11/200814MICE Target Workshop - IC

27/11/200815MICE Target Workshop - IC

config N-POT Dx(mm) H(mm) Barea(mm2) V(mm3) Q1 resc to 1e8 A-imp(mm2) sc-f resc to A-imp pn pi+ pi- mu+ mu- gam e+/e- A rho A/rho pi+ exptd cyl_Ti5.0E cyl_Ti2.5E cyl_Be1.0E cyl_Al1.0E long slim1.0E A/rho primaries ref-impact area 1.E /11/200816MICE Target Workshop - IC

ORBIT Results Summary Adam Dobbs1 st Nov /11/200817MICE Target Workshop - IC

25/11/08ORBIT Results, Adam Dobbs18 Abstract An overview is presented of the results obtained from simulating beam loss in the ISIS synchrotron, using the ORBIT programme. Particluar reference is made to loss caused by the MICE target. Results for three target orientations are presented (“Long-Thin”, “Short-Fat” and parallel to the MICE beamline). Two target sizes are used, 10mm by 1mm and 1mm by 1mm. Dip depths ranging from 27mm to 24mm above beam axis are shown. 27/11/200818MICE Target Workshop - IC

25/11/08ORBIT Results, Adam Dobbs19 Target setups: Target Orientations “Short-Fat” – 1mm along z – axis, 10mm along x - axis “Long-Thin” – 10mm along z – axis, 1mm along x – axis (true orientation) “Reduced” – 1mm along z – axis, 1mm along x - axis 27/11/200819MICE Target Workshop - IC

25/11/08ORBIT Results, Adam Dobbs20 Model The MICE target is modelled as a block of iron inserted into the ISIS beam 2ms before extraction, sitting at a position of ~115m around the synchrotron ring. The target is also currently modelled as being static. Work is being done about the possibility of improving the model to make the target titanium and dynamic. 27/11/200820MICE Target Workshop - IC ORBIT phys.models Elastic/inelastic/nuclear

27/11/2008MICE Target Workshop - IC21 TGT

25/11/08ORBIT Results, Adam Dobbs22 Results The simulation results are represented as a series of 2D histograms. They show the number of particles lost from the beam as a function of the time in an ISIS spill and the position in the synchrotron in which they were lost. Further a table is also presented for each target configuration, showing the number of “hits” (intersections of the volume) in the MICE target, for the last 2ms of the ISIS spill. The tables also give the number of particles “absorbed” by the target i.e. turned into lost particles by their interaction with the target. 27/11/200822MICE Target Workshop - IC

25/11/08ORBIT Results, Adam Dobbs23 Injection losses MICE target losses Short-Fat: 27mm above axis, -1 to 10ms 27/11/200823MICE Target Workshop - IC

25/11/08ORBIT Results, Adam Dobbs24 Short-Fat: 27mm above axis, 8 to 10ms 27/11/200824MICE Target Workshop - IC

25/11/08ORBIT Results, Adam Dobbs25 NameIndexPosition [m]# Hits# AbsorbedEfficiency Mice Mice Mice Mice Mice Mice Mice Mice Mice Mice /11/200825MICE Target Workshop - IC

25/11/08ORBIT Results, Adam Dobbs26 Long-Thin: 27mm above axis, -1 to 10ms (NB: present config) 27/11/200826MICE Target Workshop - IC

25/11/08ORBIT Results, Adam Dobbs27 Long-Thin: 27mm above axis, 8 to 10ms 27/11/200827MICE Target Workshop - IC

25/11/08ORBIT Results, Adam Dobbs28 NameIndexPosition [m]# Hits# AbsorbedEfficiency Mice Mice Mice Mice Mice Mice Mice Mice Mice Mice /11/200828MICE Target Workshop - IC

25/11/08ORBIT Results, Adam Dobbs29 Long-Thin: 26mm above axis, -1 to 10ms 27/11/200829MICE Target Workshop - IC

25/11/08ORBIT Results, Adam Dobbs30 Long-Thin: 26mm above axis, 8 to 10ms 27/11/200830MICE Target Workshop - IC

25/11/08ORBIT Results, Adam Dobbs31 NameIndexPosition [m]# Hits# AbsorbedEfficiency Mice Mice Mice Mice Mice Mice Mice Mice Mice Mice /11/200831MICE Target Workshop - IC

25/11/08ORBIT Results, Adam Dobbs32 Long-Thin: 27mm above axis, 25 0 rotation, -1 to 10ms 27/11/200832MICE Target Workshop - IC

25/11/08ORBIT Results, Adam Dobbs33 Long-Thin: 27mm above axis, 25 0 rotation, 8 to 10ms NB At present there remains an ambiguity in the direction of the rotation, clockwise or anti-clockwise. If / when this is resolved it will be published in an updated version of this document. 27/11/200833MICE Target Workshop - IC

25/11/08ORBIT Results, Adam Dobbs34 NameIndexPosition [m]# Hits# AbsorbedEfficiency Mice Mice Mice Mice Mice Mice Mice Mice Mice Mice /11/200834MICE Target Workshop - IC

25/11/08ORBIT Results, Adam Dobbs35 Reduced: 27mm above axis, -1 to 10ms 27/11/200835MICE Target Workshop - IC

25/11/08ORBIT Results, Adam Dobbs36 Reduced (1mm^2): 27mm above axis, 8 to 10ms 27/11/200836MICE Target Workshop - IC

25/11/08ORBIT Results, Adam Dobbs37 NameIndexPosition [m]# Hits# AbsorbedEfficiency Mice Mice Mice Mice Mice Mice Mice Mice Mice Mice /11/200837MICE Target Workshop - IC

25/11/08ORBIT Results, Adam Dobbs38 Reduced: 26mm above axis, 8 to 10ms 27/11/200838MICE Target Workshop - IC

25/11/08ORBIT Results, Adam Dobbs39 NameIndexPosition [m]# Hits# AbsorbedEfficiency Mice Mice Mice Mice Mice Mice Mice Mice Mice Mice /11/200839MICE Target Workshop - IC

25/11/08ORBIT Results, Adam Dobbs40 Reduced: 25mm above axis, 8 to 10ms 27/11/200840MICE Target Workshop - IC

25/11/08ORBIT Results, Adam Dobbs41 NameIndexPosition [m]# Hits# AbsorbedEfficiency Mice Mice Mice Mice Mice Mice Mice Mice Mice Mice /11/200841MICE Target Workshop - IC

25/11/08ORBIT Results, Adam Dobbs42 Reduced: 24mm above axis, 8 to 10ms 27/11/200842MICE Target Workshop - IC

25/11/08ORBIT Results, Adam Dobbs43 NameIndexPosition [m]# Hits#AbsorbedEfficiency Mice Mice Mice Mice Mice Mice Mice Mice Mice Mice /11/200843MICE Target Workshop - IC

Circular-solid 6mm radius: 27mm above axis, 8 to 10ms 27/11/200844MICE Target Workshop - IC

NameIndex Position [m] # Hits # Absorbed Efficienc y Mice Mice Mice Mice Mice Mice Mice Mice Mice Mice /11/200845MICE Target Workshop - IC

27/11/2008MICE Target Workshop - IC46 SUMMARY of the SUMMARIES ORBIT Results Summary TargetRunDepth above axis (mm)LP end of spillMICE Collimator HitsMICE Collimator Absorber% Efficiency Short Fat Long Thin Reduced Rotated 25deg Circular 6mm rad Long Thin Reduced Reduced Reduced