Great Lakes Adaptation to Change A U.S. Army Corps of Engineers Perspective Deborah H. Lee, P.E., P.H., D.WRE 21 June 2011.

Slides:



Advertisements
Similar presentations
Asian Carp Control Strategy Draft Framework Asian Carp Control Strategy Draft Framework February 12, 2010.
Advertisements

David Purkey, SEI Rob Lempert, RAND
Slide1 Managing Flood Risk U.S. Army Corps of Engineers Steven L. Stockton, P.E. Director of Civil Works U.S. Army Corps of Engineers 14 July 2009 Presentation.
Great Lakes and Ohio River Division Program Overview
ICMP Public Meeting February 18 th, 2011 February 18 th, 2011.
Channel Portfolio Tool (CPT)
PRESENTATION SUMMARY Introduction – Living with the Red Introduction Introduction – Overview (Mike Ryan) Geography Geography – Living with the Red (M.
CLIMATE CHANGE AND POTENTIAL IMPACTS ON GREAT LAKES WATER LEVELS WHAT CAN WE DO? Chicago, Illinois March 30, 2001 Presentation By: Wayne A. Smith Vice-President.
Dredging, Disposal Management and Impacts on Lake Sediments US Army Corps of Engineers.
Presentation to the Workshop Climate Change and Great Lakes Water Levels March 30, 2001 Chicago, Illinois Gerald E. Galloway, Jr., P.E., Ph.D. International.
U.S. Department of the Interior U.S. Geological Survey Beach Science for the New Millennium Richard Whitman U.S. Geological Survey Great Lakes Science.
Illinois Department of Natural Resources. Illinois Coastal Management Program Illinois was officially approved as a Coastal Management Program on Jan.
Q AVG US Army Corps of Engineers BUILDING STRONG ® Q AVG US Army Corps of Engineers BUILDING STRONG ® USACE Regional Sediment Management Program Linda.
International Workshop on Institutional Capacity Development in Transboundary Basins, November 2008, Bonn, Germany Governance and Institutional Arrangements.
Problem Definition Exercise. U.S. Fish & Wildlife Service General Summary Responses from ½ of those surveyed (n=14/31) Broad and narrow in scope Narrow.
Waterway Transportation and the Environmental Management Program in the Upper Mississippi River System 尹耀 (Yin Yao) Director of International Strategies,
Lake Superior Binational Program and Lakewide Management Plan Lynelle Hanson Lake Superior Binational Forum Meeting Ashland, Wisconsin March 23, 2012.
Short-term water level forecasts for the Laurentian Great Lakes using coupled atmosphere, land-surface and lake models Vincent Fortin 1, Murray Mackay.
International Lake Ontario – St. Lawrence River Study New Study Release Today Study Board Offers Three New Options for Regulating Water Flowing From Lake.
Great Lakes “ 101 ” Mr. Rolland. 2 Familiar names l Chicago l Milwaukee l Green Bay l Detroit (river access) l Erie l Buffalo l Cleveland.
GEOSS Great Lakes Testbed connection to Adaptive Management
Lake Huron Initiative: A Work in Process Presented by: Jim Bredin - Michigan Office of the Great Lakes.
Background:Project Background * Work Statement * Relevance Study Area Methodology:Past Studies Data Preparation *? Actual Data Adjustments * Modeling Procedure.
The West Coast Governors’ Agreement on Ocean Health Jessica Hamilton Keys Natural Resources Policy Advisor Oregon Governor Ted Kulongoski Hydrographic.
Big Horn Lake Sediment Management Study. US Army Corps of Engineers Omaha District Study Background Bureau of Reclamation and Omaha District Interagency.
Collaborative Monitoring in the Great Lakes: Revisiting the Lake Michigan Mass Balance Project Collaborative Monitoring in the Great Lakes: Revisiting.
1 Slide1 THINGS WE NEED TO UNDERSTAND ABOUT LEVEES: CURRENT INITIATIVES AND FUTURE DIRECTIONS Presentation to Association of State Flood Plain Managers.
Potential Socio-Economic Impacts of Climate Variability and Climate Change in the Great Lakes Region by George M. Albercook C E P E S Center for Environmental.
U.S. Army Corps of Engineers In partnership with the South Florida Water Management District Water Management in South Florida.
Asian Carp Regional Coordinating Committee [TITLE] [Author] [Date]
Robert M. La Follette School of Public Affairs Great Lakes Aquatic Invasive Species and their Impacts on Milwaukee, WI Prepared for: City of Milwaukee,
US Army Corps of Engineers BUILDING STRONG ® 2012 Alabama Water Resources Conference Orange Beach, Alabama September 6, 2012 Beneficial Use Opportunities.
Tributary Modeling and Coastal Mapping w.r.t. Watershed Planning in the Great Lakes US Army Corps of Engineers Detroit District Great Lakes Hydraulics.
Who We Are What I Do Great Lakes Commission. Great Lakes Basin.
Managing Western Water as Climate Changes Denver, CO February 20-21, 2008.
Western Lake Erie Basin Partnership Presented by: Name, Title Your Organization DATE YOU PRESENTED The Meeting you presented at.
US Army Corps of Engineers Detroit District Knife River Reducing Sediment Delivery Through Forest Restoration.
U.S. Fish and Wildlife Service Overview: Alpena Fishery Resources Office Lake Huron Programs Anjanette Bowen USFWS-Alpena FRO Great Lakes Fisheries Leadership.
1 An Ocean Blueprint for the 21st Century. 2 The U.S. Commission on Ocean Policy 16-member, independent, bi- partisan group 26 scientific advisors 16.
US Army Corps of Engineers BUILDING STRONG ® USACE-IOOS Missions, Priorities, Recommendations Linda Lillycrop IOOC Member USACE Liaison, U.S. IOOS US Army.
Lake Michigan Coastal Program Coastal 101 – 2007 Edition.
By Zach.  The soo locks are a set of parallel locks which enable ships to travel between Lake Superior and the lower Great Lakes. They are located on.
A Pivotal Moment for Leaders Across the Gulf Coast States and Connected Communities Throughout the Country.
Lee County Water Resource Initiative: Community Sustainability Committee June 16, 2010 Kurt Harclerode Operations Manager Lee County Natural Resources.
State of Lake Huron Percids
San Francisco Ocean Beach-Great Highway Erosion Control Project.
CANADIAN COLUMBIA RIVER FORUM U.S. Flood Control and Operational Perspective Jim Barton, Chief of Corps of Engineers Columbia Basin Water Management Division.
Is the Mid-Atlantic Region Water Rich? Presentation to 5 th Mid-Atlantic Regional Planning Roundtable November 7, 2008 Joseph Hoffman, Executive Director.
Climate Change GLSGN Meeting Alexandria Bay, NY June 16, 2009.
BUILDING STRONG ® US Army Corps of Engineers BUILDING STRONG ® Systems-based Budgeting for Inland Navigation Operations and Maintenance Kenneth Ned Mitchell,
California Water Plan Update Advisory Committee Meeting January 20, 2005.
Great Lakes Water Levels and Coastal Systems Coastal Resiliency and Climate Change Scudder D. Mackey, Ph.D. Ohio Department of Natural Resources Lake Erie.
1 Cameron Davis Senior Advisor to the Administrator, U.S. EPA Commission for Environmental Cooperation Joint Public Advisory Committee Public Forum on.
MEKONG RIVER COMMISSION PROGRAMMES FOR SUSTAINABLE DEVELOPMENT.
Mekong River Commission Information System/ “WUP-FIN Phase III” Concept The information system development is critical activity for maintaining the MRCS.
The Mekong River Commission: Challenges, Mission, and Strategies.
Lake Management in Alberta. Lake Issues ~2500 lakes in total with 800 fish-bearing lakes in Alberta Many lakes have changed due to Watershed alteration.
57th Annual Meeting of the GLFC Buffalo, NY June 6-7, 2012 Water Level Regulation in the LO/SLR System Environmental Considerations and Plan BV7.
Lake Erie Dredge Material: Finding a Solution for Ohio Ohio Brownfield Conference 2016 April 6-7, 2016.
Preparing for Climate Change: British Columbia’s Adaptation Strategy Thomas White Climate Action Secretariat 26 January 2010.
Technical Support to AOCs
New York State AOC Meeting:
United States Environmental Protection Agency
The Ohio Clean Marinas Program Expansion
The Poe Lock – Lynchpin of the Great Lakes Navigation System
19 May 2017 Bill Bialkowski, M.A.Sc. P.Eng.
Shareholders Members/ Property Owners Board of Directors.
Great Lakes Green Infrastructure Champions
Metropolitan Mayors Caucus March 17, 2015
Eric Ellis Habitat Restoration Senior Program Specialist
Presentation transcript:

Great Lakes Adaptation to Change A U.S. Army Corps of Engineers Perspective Deborah H. Lee, P.E., P.H., D.WRE 21 June 2011

Outline  Corps Missions in the Great Lakes o Navigation / Hydropower o Environmental Initiatives o Flood Risk Management o Interagency & International Services  Observations Supporting the Missions  Adaptation to Changes 2

3 Ogdensburg Lake Superior Lake Michigan Lake Huron Lake Erie Lake Ontario MI NY PA IL WI IN CANADA OH Morristown Cape Vincent Sackets Harbor Port Ontario Oswego Little Sodus Bay Great Sodus Bay Irondequoit Bay Rochester Oak Orchard Olcott Wilson Little River Black Rock Lock/Tonawanda Buffalo Sturgeon Point Cattaraugus Dunkirk Barcelona Erie Geneva On-The-Lake Ashtabula Conneaut Fairport Cleveland Rocky River Lorain Vermilion Huron Sandusky West Harbor Port Clinton Toussaint River Cooley Canal Toledo Put-In-Bay Bolles Harbor Monroe Rouge River Detroit River Clinton River Belle River Pine River Lake St. Clair St. Clair River Black River Lexington Caseville Port Austin Bay Port Harbor Beach Port Sanilac Sebewaing Saginaw Point Lookout Tawas Bay Au Sable Harbor Harrisville Black River Harbor Alpena Hammond Bay Cheboygan Inland Route Mackinac City Mackinac Island St. James Cross Village Petoskey Charlevoix Channels in Straits of Mackinac Grays Reef Leland Greilickville Frankfort Arcadia Portage Lake Manistee Ludington Pentwater White Lake Muskegon Saugatuck Grand River Holland Grand Haven South Haven St. Joseph St. Joseph River New Buffalo Michigan City Burns Small Boat Harbor Burns Waterway Harbor Calumet Indiana Harbor Chicago River Chicago Harbor Waukegan Kenosha Milwaukee Port Washington Sheboygan Manitowoc Washington Island Green Bay Big Suamico Kewaunee Algoma Sturgeon Bay Two Rivers Pensaukee Oconto Menominee Cedar River Little Bay de noc Gladstone Manistique Detour Les Cheneaux Island Soo Locks St. Marys River Whitefish Point Harbor Little Lake Grand Marais Presque Isle Marquette Big Bay Grand Traverse Bay Lac La Belle Eagle Harbor Keweenaw Waterway Ontonagon Black River Saxon Ashland Chippewa Harbor Grand Marais Beaver Bay Two Harbors Knife River Duluth- Superior Bayfield La Pointe Cornucopia Port Wing Deep Draft Shallow Draft Federal Harbors on the Great Lakes A non-linear navigation system with 63 federal commercial harbors dependent on each other for the efficiency and health of the system 24 of the Nation’s top 100 harbors linked in trade with each other in a complex pattern of interdependency. Shallow-draft (recreational) harbors are critically important to the regional economy; not high administration priority. Navigation Mission

4 Initiatives to optimize dredging efficiencies: Dredge Sediment Traps Reduce sediment load to harbors Leverage GL Legacy Act and GLRI Great Lakes Dredging Navigation Mission Funding $21M in GL dredging has a return on investment of $201M

Great Lakes Tributary Models (Sec 516e, WRDA 96) l Twenty tributaries have models completed or under development l Web-based modeling tool being developed in cooperation with MSU l Technical support to state and local agencies with watershed planning tools for prioritizing soil conservation and nonpoint pollution measures St Joseph River Watershed 5 Navigation Mission: Changes Ahead

Compensating Works Sault Ste. Marie, Ontario Fishery Remedial Works Soo Locks Sault Ste. Marie, Michigan Edison Sault Electric Co. Sugar Island Great Lakes Power, Ltd. Canadian Lock 6 Mission: Navigation / Hydropower

Soo Locks Asset Renewal Long-Term Plan Asset Renewal Plan will maximize reliability and reduce risk through 2035  Full funding required $100 million over 6 years  $19.6 M funded to date through FY09 new hydraulics, stop logs, utilities  $5.5M funded in FY10 - $2M funded E&W, $1.2M reprogrammed, $2.3M from St. Marys account Crib Dam construction Compressed Air System design Mac Lock modernization design 7 Navigation Mission

Coastal Health Historically, environmental infrastructure projects/year in Great Lakes Challenge of declining funds and lack of Congressional “adds” Reduce sewer overflows and pollution to Lakes 8 Environmental Mission

Invasive Species Chicago Sanitary and Ship Canal (CSSC) Fish Barriers Sea Lamprey Traps & Barriers at the Soo ANS Interbasin Transfer Study Soo Lock 9 Environmental Mission

Chicago Lock TJ O’Brien Lock Starved Rock LD Marseilles LD Lockport LD Brandon Road LD Dresden Island LD Aquatic Nuisance Species Barrier Fox River Kankakee River Des Plaines River Chronologic Upstream Movement of Asian Carp Photo: K. DeGrandchamp and (RM 281.5) Photo: K. DeGrandcha mp 10 Environmental Mission

USACE Strategy for Deterring Aquatic Invasive Species Migration FY11 FY13 Jan 2010FY12 Barrier I Active (1 Volt/in, pulses 4 ms at 5 hz) Barrier IIA Active (2 Volt/in, pulses 6.5 ms at 15 hz) Asian Carp Monitoring Permanent Barrier I – Design/Build/Test Interbasin Transfer Study (Chicago Area Waterways System) Implement Solutions Complete Optimum Parameters Research Construct Interim Solutions for Potential Bypasses FY10 Efficacy Study Implement Study Solutions (Authorization & Funding Required) Barrier IIB Built IIB Testing Interbasin Transfer Study Continue Operation of Demo Barrier and Barrier IIA Additional eDNA Research/Efforts Modified Structural Operations 11 Environmental Mission

“Monthly Bulletin of Lake Levels for the Great Lakes” – 5,000 subscribers Semi-monthly Channel Depth forecasts Weekly water level forecasts Numerous public queries and media interviews Frequent presentations basin-wide Water Level Forecasting 12 Mission: Flood Risk Management

WELLAND CANAL 7 CONSTANT LEVEL LAKE ERIE OUTFLOW TO ONTARIO OUTFLOW TO THE SEA LAKE ONTARIO RUNOFF FROM LAKE PRECIPITATION ON LAKE OUTFLOW EVAPORATION FROM LAKE Hydrologic Components Flow from upstream lakes, evaporation and precipitation influence lake levels. This graph illustrates the relative influence of each of those factors on the Great Lakes system. Values are based on a monthly average and are represented as thousand cubic feet per second. Superior 57% in is precipitation 39% in is runoff 4% in from diversions _________________ 40% out is evaporation 60% out is outflow Mich-Huron* 39% in is precipitation 32% in is runoff 29% in is inflow __________________ 31% out is evaporation 68% out is outflow 1% out thru Chi. Diversion Erie 79% in is inflow 11% in is precipitation 10% in is runoff _________________ 89% out is outflow 11% out is evaporation Ontario 80% in is inflow 13% in is runoff 7% in is precipitation __________________ 95% out is outflow 5% out is evaporation 5 NY STATE BARGE CANAL 1 13 Mission: Flood Risk Management

Stannard Rock 14

Sault Ste. Marie (verify reported hydropower plants outflows) Lower Niagara River (verify flow over Niagara Falls) USACE SeaArk with ADCP 15

U.S. Staff Canadian Staff International Joint Commission International Lake Superior Board of Control International St. Lawrence River Board of Control International Air Quality BoardInternational Water Quality Board International Niagara Board of Control 1909 Boundary Waters Treaty created IJC to prevent and resolve disputes; empowered to approve projects that impact water levels across the boundary US Army Corps of Engineers chairs U.S. Section of 3 Great Lakes Control Boards 16 Mission: International & Interagency Support

Determine monthly outflow allocations from Lake Superior based upon regulation plan computations Support the International Joint Commission and the International Lake Superior Board of Control with technical analyses and communication with stakeholders Testing timing of peak flows this summer to enhance efficiency of sea lamprey traps at all powerhouses Lake Superior Outflow Regulation 17 Mission: International & Interagency Support

International Niagara Board of Control Board formed in 1953 to oversee operation of control structure above Niagara Falls, installation and removal of an ice boom at hear of the Niagara River, conduct studies and provide advice to IJC 18 Mission: International & Interagency Support

International St. Lawrence River Board of Control Board formed in 1952 to regulate Lake Ontario outflows weekly, oversee operation of control structures, provide advice to IJC Considers impacts to riparians, hydropower, navigation from Lake Ontario to Montreal Working with IJC to consider impacts of operations on the environment Extensive public information and outreach program Emergency outflow structureMoses-Saunders Powerhouse (primary outflow control structure) 19 Mission: International and Inter-agency Support

Building Robust Regulation Plans 20 Need to consider: Wide range of water supplies Performance with climate variability Impact on more interests – environment and recreation Adaptive management Adapting to Change

21 Potential Water Level Variability Adapting to Change

Riparians Hydropower Recreation Navigation Environment 22 Adaptive Management: Why? Process to better manage uncertainty of impact on interests Reduce uncertainty through long-term monitoring, modeling and assessment – adjust management as new information becomes available As we face climate change and increased climate variability, it will be important to build flexibility into our water management regimes Adapting to Change

Adaptive Management: Where? Adaptive management approach is currently being developed for Lake Ontario and the St. Lawrence River system –IJC Study demonstrated that ‘fixed’ water levels over 50+ years have had negative impact on lakeshore environment –Plan would improve environmental outcomes, while making no other uses worse off –Monitoring required to determine if desired outcomes are being achieved over time …and will be required for the upper Great Lakes –IJC moving toward increased flexibility in the regulation plan to respond to changes in water supplies –Study will call for program of monitoring water levels and evaporation Potential approach being developed: Defining Coping Zones Acceptable zone within an interest’s expectations and tolerances. Outside an interest’s expectations, yet they can cope under current management regimes. The impacts, both economic and environmental, are generally considered reversible. Persistent negative consequences; serious degradation of ecosystem functions. Hazard zone policies and major infrastructure would be compromised. The impacts are irreversible. 23 Zone A Zone B Zone C Adapting to Change

Summary – Path Forward 24 Summary Corps will continue to collaborate with other agencies, academia, NGOs in collecting, analyzing, displaying information needed by decision makers Corps will examine utility of data collected by others, such as GLOS, to support Corps missions Corps will continue to collaborate with others on studies and programs (GLRI, IWRSS, IJC, etc.) The role of the Coordinating Committee on Great Lakes Basic Hydraulic and Hydrologic Data may expand Adaptive management is data intensive, and central to future management