Defect Analyzer for Rods Patrick Gartung. Installation Tried to install and compile on my desktop –Fermi Linux LTS 3.0 –Newer system QT library caused.

Slides:



Advertisements
Similar presentations
Interface between Velleman PCSGU250 and MATLAB
Advertisements

ARCs cut definition for TEC modules Javier Fernandez Menendez Institut für Experimentelle Kernphysik Karlsruhe University TEC meeting 14 th July 2004.
{ Dominion - Test Plan Version 1 – 22 nd Apr Aravind Palanisami.
Adding electronic noise and pedestals to the CALICE simulation LCWS 19 – 23 rd April Catherine Fry (working with D Bowerman) Imperial College London.
1 US Testing Update-Anthony AffolderTracker Meeting, Feb 10, 2004 Faulty Channel Sources (TOB) Fault Sources (excluding cable breaks and CMN)  Hybrid-0.004%
Cluster Processor Module : Status, test progress and plan Joint Meeting, Mainz, March 2003.
1 Data Analysis Framework for DHC Tower Update - 07/28/2003 Kurt Francis - Northern Illinois University.
Slide 1 Anthony Affolder US Module LT meeting June 17, 2004 UCSB Module LT Testing.
May 13, FNAL Hybrid Thermal Test Status  Hybrid Thermal Test Procedure  Test Results Eva Medel FNAL CMS Group June 22, 2004.
Digital Hadron Calorimeter Cosmic Ray Test Stand As of 9am05/12/2003 Note: axes on scatter plots are reversed.
4/25/2006 Puneeth Kalavase, UC, Santa Barbara On behalf of US Tracker Outer Barrel group Construction and Testing of CMS “Rods”
Slide 1Electrical Testing at UCSB -Anthony AffolderDOE review, January 20, 2004 Module Testing at UCSB: Simulated Production Derek Barge On behalf.
1 US Testing Status-Anthony AffolderModule Testing Meeting, Dec. 11, 2003 Update of US Testing Status Anthony Affolder On behalf of the US testing group.
Status of the Tracker DB System Tk week april 03 D. Contardo Developments Applications.
CMS Tracker Week – Module Test Meeting – April 2003 – Patrick Gartung 1 Status of US long term module testing Patrick Gartung University of California,
HCAL Digitization Rick Wilkinson 1. CMSSW HCAL Simulation Three gains are used as input –Calibration (GeV/fC) From DB gain, by channel –Electronics (fC/photoelectron)
Digital Hadron Calorimeter Cosmic Ray Test Stand.
Statistical inference Population - collection of all subjects or objects of interest (not necessarily people) Sample - subset of the population used to.
1 TPC online  offline calibration November 2002.
CMS Tracker Week, CERN, Apr Apr 2004CMS Tracker Week - Module ProductionSalvatore Costa - Catania Module Production ___________ Report on.
Introduction to Hall-D Software February 27, 2009 David Lawrence - JLab.
Offline Tracker DQM Shift Tutorial. 29/19/20152 Tracker Shifts Overview Online Shifts at P5 (3/day for 24 hours coverage) – One Pixel shifter and one.
Tests with JT0623 & JT0947 at Indiana University Nagoya PMT database test results for JT0623 at 3220V: This tube has somewhat higher than usual gain. 5×10.
Painless Bug Tracking Michael Tsai 2011/9/30. Reference  html 2.
© Blackboard, Inc. All rights reserved. Deploying a complex building block Andre Koehorst Learning Lab Universiteit Maastricht, the Netherlands July 18.
STAR Analysis Meeting, BNL, Dec 2004 Alexandre A. P. Suaide University of Sao Paulo Slide 1 BEMC software and calibration L3 display 200 GeV February.
1 N eutrino E xtended S ubmarine T elescope with O ceanographic R esearch Operation and performance of the NESTOR test detector.
Debugging and Profiling With some help from Software Carpentry resources.
Capacitive transducer. We know that : C=kЄ° (A/d) Where : K=dielectric constant Є° =8.854 *10^-12 D=distance between the plates A=the area over lapping.
Commissioning and Operation of the CMS Tracker analogue optical link system at TIF with CMSSW: R.Bainbridge, A.Dos Santos Assis Jesus, K.A.Gill, V. Radicci.
Track Short Course: TrackRT Installation Thomas Herring, MIT Room A
Pixel DQM Status R.Casagrande, P.Merkel, J.Zablocki (Purdue University) D.Duggan, D.Hidas, K.Rose (Rutgers University) L.Wehrli (ETH Zuerich) A.York (University.
Statistics is... a collection of techniques for planning experiments, obtaining data, and then organizing, summarizing, presenting, analyzing, interpreting,
Peter W. PhillipsATLAS SCT Week, CERN, September/October 2002 Electrical Tests of SCT modules using RODs Peter W Phillips Rutherford Appleton Laboratory.
Be “GUI ready” developing in RPG by Robert Arce from PrismaTech. Be “GUI ready” developing in RPG-ILE Presented by: Robert Arce.
IT Project Management, Third Edition Chapter 8 1 Chapter 5: Project Quality Management.
LIGO-G9900XX-00-M DMT Monitor Verification with Simulated Data John Zweizig LIGO/Caltech.
PMT time offset calibration (not completed) R.Sawada 27/Dec/2007.
July 10, 2001 Status Report of the ROD Testing at BNL Kin Yip Activity update of the ROD system at BNL: DAQ-1 with trigger controller Data corruption testing.
“Not the real deal but close” Ch 11 Simulations. Real World Example This is a simulation of what it feels.
Introduction Sample surveys involve chance error. Here we will study how to find the likely size of the chance error in a percentage, for simple random.
Noise results from SR1 combined SCT barrel tests Summary of some initial results Alan Barr, UCL Pepe Bernabeu, Valencia.
Authors: Dmitrii Pereima, ITEP; Dmitry Golubkov, ITEP; Iouri Gouz, IHEP; Victor Egorychev, ITEP. Visualization of HCAL 137 Cs calibration data 1 CALO +
ANL Worksop Impressions The facility is really nice, with office space (Duke has one), printer, video connection, etc… The jamboree format (and the confined.
L1Calo Databases ● Overview ● Trigger Configuration DB ● L1Calo OKS Database ● L1Calo COOL Database ● ACE Murrough Landon 16 June 2008.
DB and Information Flow Issues ● Selecting types of run ● L1Calo databases ● Archiving run parameters ● Tools Murrough Landon 28 April 2009.
Stability Hidemitsu Asano. pixel unstable point seg#
Chapter 4 Review December 19, 2011.
Defect Analysis algorithms for the ARC, Lt and LtStruct tests
Update of US Testing Status
Hamburg Bonding Report
UCSB Testing Status Anthony Affolder
US Module Production Quality
FNAL Module Testing Status
First slides: Prof. Stojanovic, MIT Last slides: Prof. Dally, Stanford
Module production in Italy
US Testing Update Anthony Affolder (On behalf of the US testing group)
NanoBPM Status and Multibunch Mark Slater, Cambridge University
BESIII EMC electronics
Hybrid & Module Testing Status
US Module Testing Progress Report
Status of 44 ARCS tested TOB modules, June 24, 2004
5018 Sensors Channels 420 at 150 V.
TOB Module Production Overview and Plan
Hybrid & Module Testing Status
Hybrid & Module Testing Status
VELO Software Update TELL1 Algorithms Error analysis
5018 Sensors Channels 420 at 150 V.
Samples and Populations
FNAL Bonding Since our last report we have built and bonded an additional 10 TOB 4-chip modules 3 RMT pitch adapters 7 Planar pitch adapters By adjusting.
Presentation transcript:

Defect Analyzer for Rods Patrick Gartung

Installation Tried to install and compile on my desktop –Fermi Linux LTS 3.0 –Newer system QT library caused linking issues Installed and compiled on multirod system –Fermi Linux 7.3 Installed and compiled on single rod system –Do not want to cause any stability issues on multirod and single rod is used less often –Resolved remote access problem with Lenny’s help

Known bug Able to reproduce crash when DefAna is run on a root file for the second time –Narrowed the problem down to the text summarizer and possibly the histogrammer classes –Test summarizer is not needed since it really only works for cold box root files –Histrogrammer class crashes occasionally on second pass Always run DefAna on a new copy of the root file –This prevents the original from being corrupted –Histograms will be created without crashing

Plot generation Only those variables used for determining bad channels are presently plotted –CMSubtracted noise –Pedestal –Calibration profile pulse amplitude –Calibration profile pulse rise time More plots could be added –Timetune –Optoscan –Etc.

XML generation Records are saved in root with a database tag in each record (TNcdb) When the XML file is generated the program looks for this tag to determine which record goes in XML file Database tag set by SaveRec 4 th argument in scenario file Use SECLTFIRST, SECLTCOLD, and SECLTLAST for those records you are interested in putting in the XML file –This is usually the first measurement, the last measurement in the cold and the last measurement

Bad Channel Flagging Flags are generated based on absolute or percentage cuts (on chip average) Noise will have to be a percentage cut because of optical gain –Normalizing noise on tick height (distance between digital 0 and 1) was shown to be ineffective by TEC (V. Zhoukov talk Dec04) –Normalizing noise on chip average seems to be the only was to normalize without ARCS data (see V. Zhoukov talk Dec04) Channel flags are not set correctly –Noise flags are set correctly –5 of 6 modules have all channels flagged as likely pinholes –Currently working on tracking down the bug that causes this

Summary DefAna package compiles correctly on Fermi Linux 7.3 DefAna crashes in a predictable way that can be avoided Histrograms and XML files are generated when the correct DB tag is used Determining how to normalize the data and what cuts to use still needs work