ATC Major Projects Update Flora Flygt, Director of System Planning Franc Fennessy, Manager of Local Relations Wisconsin Industrial Energy Group August.

Slides:



Advertisements
Similar presentations
Calista AVCP Regional Energy Plan. Preliminary Planning and Stakeholder Involvement Resource Inventory and Data Analysis Develop and Review Draft Energy.
Advertisements

Houston Region Import Capacity Project Planning for Reliable Power.
October 16, 2009 RPG Meeting ERCOT RPG Project Review Update Jeff Billo.
Sacramento Local Agency Formation Commission (LAFCo) ANALYSIS OF PROPOSED SMUD SPHERE OF INFLUENCE AND ANNEXATION Presented by Chris Tooker Friday, October.
Rate Plan. Value Story When asked, our customers identify the following topics as ways MidAmerican Energy provides value – Emergency Response.
TERRACE TO KITIMAT TRANSMISSION PROJECT UPDATE Feb/March 2015.
Empowering Communities 1 NWT Chamber of Commerce AGM NTPC 2012/14 General Rate Application April 4, 2012.
ATC Planning Zone Meeting Teresa Mogensen Director, Transmission Planning & Service Scott Barnhart Manager, Transmission Planning.
THE POWER OF POSSIBILITY Electric Transmission System Development in Alberta Neil J. Brausen, P. Eng., Director System Planning APEGGA Calgary Branch Luncheon.
Houston Region Import Capacity Project August 27, 2013 Regional Planning Group Meeting.
Stakeholder Information Update Edmonton-Calgary 500 kV Transmission Development December 14, 2005 Introduction Neil Millar, vice-president, Transmission.
1 Singapore Update Presented by Dave Carlson Chief Executive Officer 30 October.
OVERVIEW OF THE MINNESOTA PUBLIC UTILITIES COMMISSION Presentation to the Itasca Economic Development Corp. February 14, 2007 By LeRoy Koppendrayer, Chair.
Alabama Power and Economic Development Alabama County Government Institute Shane Kearney Sr. Project Manager Economic Development Alabama Power Company.
IMPERIAL VALLEY CONFERENCE July 21, SOLICITATION RENEWABLES PORTFOLIO STANDARD.
U.S. Transmission Capacity & Reliability Are we willing to do what it takes to preserve the transmission option? David R. Nevius - NERC.
North Eastham Wind Feasibility Study Results Brian Eastman Eastham Energy Committee Kristen Burke Massachusetts Technology Collaborative Ric O’Connell.
Florida Southeast Connection Florida Energy Pipeline Association Jena Mier, Environmental Project Manager August 12-14, 2015.
Wyoming Infrastructure Authority Developing Electric Infrastructure for the Future of the West Energy Gateway Update Presented by Darrell T. Gerrard Vice.
2006 Reliability Study Scope Name Date. DRAFT 2 Purpose of Study Assess the PEC and Duke transmission systems’ reliability Develop a single reliability.
The Need for Electric Transmission Improvements in Dane County.
Final Thoughts The Future of Our Industry The Global Envelope Conference June 4-6, 2007 Berlin, Germany.
0 CapX /1/2015 CapX 2020 Transmission Plan: Ensuring Reliable Electricity.
Kilowatt Hour Usage MGE serves approximately 113,000 residential customers in the Dane County area …and approximately 17,500 business customers.
Reliable Power Reliable Markets Reliable People Performance Targets for the Customer Interconnection Process January, 2008.
10/03/ Report on Existing and Potential Electric System Constraints and Needs Within the ERCOT Region October 3, 2002.
© OECD/IEA 2010 Energy Policies of the Czech Republic 2010 In-depth Review Energy Policies of the Czech Republic 2010 In-depth Review Prague, 7 October.
Technical Conference on Net Metering Load Research Study November 5, 2014.
1 Transmission Line Projects in Maryland – an Overview Sandra S. Patty PPRP - Manager, Transmission Projects PPRAC Meeting Country Inn & Suites, Annapolis,
Network Customer Meeting Access Metric Update November 16, 2006.
North Island Grid Upgrade Proposal Presentation to the Electricity Commission Conference 22 May 2007.
ERCOT SCENARIO DEVELOPMENT STAKEHOLDER WORKSHOP CNP Discussion Points for Long-Term Scenarios ( ) January 23, 2014.
WIEG Board Meeting Alliant Energy New Generation Plan Kim Zuhlke February 8, 2007.
1 WPL Regulatory Update Scott R. Smith Director, Regulatory Affairs.
Wholesale Electricity Market – Western Australia APEx Conference 2008 – Sydney Allan Dawson 13 October 2008.
CWAG ENERGY CONFERENCE BIG SKY, MT Collaborative Efforts to Find Solutions: A Case Study – The Mountain States Transmission Intertie (MSTI) Presented by.
Mr Martin Crouch, ERGEG Electricity Regulatory Forum 2009 Florence, 5 June 2009 Status Review of Sustainable Development in the Energy Sector.
ATC Planning Zone Meeting Teresa Mogensen Director, Transmission Planning & Service Scott Barnhart Manager, Transmission Planning.
Partnering for the Future WIEG Meeting September 16, 2010.
1 Sunrise Powerlink Project Update Orange County Business Council March 10, 2009.
Reliable Power Reliable Markets Reliable People Hanna Region Transmission Development Ramaiah Divi, P.Eng Manager, Central System Planning.
Yellowhead Area Transmission System Development
Order 1000 Implementation in PJM – Challenges and Opportunities Jodi L. Moskowitz Senior Director – Transmission Development & Strategy October 13, 2015.
June 2008 Windsor-Essex Electrical Service Needs and Solutions.
Bob Cupit Manager, Energy Facility Permitting Minnesota Public Utilities Commission.
Indy Butany DeSouza Consumer Benefits from the Competitive Provision of Energy Services and the Ontario Smart Meter Implementation.
Craig Williams Market Interface Manager August 21, 2014 ISAS, Portland, OR.
DataPost Federal Reserve Bank of San Francisco Economic Education & Outreach Inflation Measuring Price Changes Date last updated: December 7, 2015.
To Buy or To Build Is it really one or the other? APPA New Generation Workshop Portland, Oregon August 1, 2007.
TRANSMISSION INFRASTRUCTURE IMPROVEMENTS — Current Projects — The Center for the New West “ The Sun Valley Energy Roundtables 2006” November 30 – December.
© 2008 Dominion Building New Nuclear Plants: Are Utilities Ready? Wisconsin Public Utility Institute Advances in Nuclear March 26, 2008 Eugene S. Grecheck.
Update on the North Carolina Transmission Planning Collaborative January 30, 2007 For the North Carolina Utilities Commission and the North Carolina Public.
ERCOT Transmission Planning Process Overview and Recommendations November 6, 2002.
Performance of the Integrated National Electrification Programme as at 30 June 2008 (4 rd Quarter) Presentation to the Select Committee on Finance 14 August.
SERC Reliability Corporation 1 SERC RELIABILITY CORPORATION MID-AMERICA RELIABILITY CONFERENCE June 21, 2006 COLUMBUS, OHIO.
California Energy Action Plan December 7, 2004 Energy Report: 2004 and 2005 Overview December 7, 2004.
2006 Reliability Study James Manning Bryan Guy May 12, 2006.
Federal Energy Regulatory Commission 1 Overview of the Federal Energy Regulatory Commission (FERC) Roland W. Wentworth Office of Markets, Tariffs and Rates.
03/06/2008 TAC CREZ Transmission Optimization (CTO) Study Update Dan Woodfin Director, System Planning.
TransmissionHub Quarterly Market Update June 8, 2015 Kent Knutson, Director Hub Services, PennWell Corporation Sponsored by.
4/16/2010 Regional Planning Group Meeting Long-Term Planning Study of the ERCOT Interconnection Warren Lasher Manager, System Assessment.
Understanding the Integrated Resource Plan (IRP 2010 Rev 2)
The Midwest ISO – Platform to Meet Tomorrow’s Challenges Wisconsin Industrial Energy Group August 7, 2008.
LNBA Subgroup: Avoided Transmission Value
Saskatoon South Perimeter Freeway Information Session
Environmental Assessment PUC Application Process
New England Resource Adequacy
PUBLIC PARTICIPATION MEETING FOR CONSTRUCTION OF A 400KV ±250 KM POWER LINE FROM BORUTHO S/S IN MOKOPANE TO BOKMAKIERIE S/S IN NZHELELE & ASSOCIATED SUBSTATION.
Brackish Water Desalination Project
Puerto Rico Electric System Challenges Ahead
Presentation transcript:

ATC Major Projects Update Flora Flygt, Director of System Planning Franc Fennessy, Manager of Local Relations Wisconsin Industrial Energy Group August 9, 2007 Madison, WI

2 Access Initiative  Goal: Reduce delivered cost of energy to Wisconsin consumers by... –reducing system congestion –improving access to additional energy sources  Solution: Add an additional 345 kV circuit to the existing 345 kV line (W4) between Rockdale SS (Dane) and Paddock SS (Rock)  Project estimated costs (2010): –Preferred route: $132.7 million –Alternate route: $210.8 million

3 Access: Net Present Value Benefits less Project Costs (2010) Paddock-Rockdale Analysis - NPV of Net Benefits (Costs) ($ Millions) Robust Economy No NALX -COL Robust Econom y High Retirements High Environmental Slow Growth Fuel Supply Disruption High Growth Wisconsin APC$341$299$574$82($62)$575$265 70% APC + 30% LLMP$529$455$950$132($47)$956$544 LLMP$968$819$1,826$249($12)$1,843$1,196 ATC Customer Benefit$409$356$710$104($56)$710$365 APC = Adjusted Production Costs LLMP = Load-weighted Locational Marginal Prices

4 Access: Net Present Value Benefits less Project Costs (2010) Robust Economy Without Add’l EHV Robust Economy With Add’l EHV High Retires High Environment Slow Growth Fuel Supply Disruption High Growth Wisconsin

Dane County Projects Update

6 Background  Dane County has experienced major economic growth in the last 25 years.  Three of Wisconsin’s top 5 fastest growing municipalities are in Dane County (Verona, Cottage Grove and Sun Prairie). (Includes municipalities with a population of 5,000 or more in 2005; data source: U.S. Census Bureau.)  Dane County’s electricity consumption is expected to continue to increase through year  System-reliability models indicate that new transmission lines will be needed in Dane County by 2008 and every few years thereafter to keep pace with this growing demand.  ATC proposed five projects to deal with this growth

7 Public Outreach  Extensive outreach on all Dane County projects –Energy Initiative Study – supported a group of stakeholders and traditional interveners in review of Dane County’s transmission needs –Project communications, open houses –Ongoing consultation with regulatory agencies –Extensive media relations –Polling –Advertising

8 Dane County Transmission Projects  North Madison-Huiskamp – approval 7/12/07  Femrite-Sprecher – in service  Fitchburg-Verona – application complete, pending hearings  Paddock-Rockdale – application complete, hearings set  Rockdale-West Middleton – routes announced in August

9 North Madison-Huiskamp Project (aka “Waunakee Project”)  Controversy early in project –39 different parties, two intervenor groups –More than 100 public hearing witnesses –Calls for ‘independent’ study  Excerpts from PSCW oral discussion of decision: –“Ebert said this agenda item represents probably the most pressing reliability challenge he has seen since becoming Chairman.” –“Ebert said the [PSC] was formed 100 years ago and was created precisely to conduct that independent review.”

10 Dane County 345 kV Project  Rockdale – West Middleton (Dane) –Resolves significant voltage and reliability issues in Madison area –Final routes were announced on August 1; PSCW filing in October 2007 –Considerable public involvement effort to date. Open houses this month –Underground options evaluated—will not be recommended by ATC –In-Service: 2013

11 Other 345 kV Projects  Arrowhead – Weston –On schedule & budget for June 2008  Gardner Park - Central Wisconsin –WPS Weston 4 generator interconnection –Early in construction; in-service 2009  Morgan – Werner West –System enhancement project in NE Wisconsin –Early in Construction; in-service 2009

12 Thanks! Questions? Web: