Feasibility of a Metropolitan Truck-only Toll Lane Network: The Case of Atlanta, Georgia Michael D. Meyer, P.E., Professor School of Civil and Environmental.

Slides:



Advertisements
Similar presentations
Interim Guidance on the Application of Travel and Land Use Forecasting in NEPA Statewide Travel Demand Modeling Committee October 14, 2010.
Advertisements

Mid-Atlantic Rail Operations Study -- Benefit Assessment Presented by: Jack Lettiere, Commissioner New Jersey Department of Transportation Presented to:
Getting Started with Congestion Pricing A Workshop for Local Partners Federal Highway Administration Office of Operations.
I-95 Corridor Coalition December 14, 2001 I-95 Corridor Coalition Mid-Atlantic Rail Operations Study — An Integrated Strategy to Eliminate Choke Points.
SCAG Region Heavy Duty Truck Model Southern California Region Heavy Duty Truck Model.
Intercity Person, Passenger Car and Truck Travel Patterns Daily Highway Volumes on State Highways and Interstates Ability to Evaluate Major Changes in.
Metro Vision 2035 Regional Growth Scenarios. Scenario Workshop.
Transportation Planning Section, Transportation Development Division Oregon Transportation Plan 2005 Modeling Alternative Policy Choices Becky Knudson,
TRB Lianyu Chu *, K S Nesamani +, Hamed Benouar* Priority Based High Occupancy Vehicle Lanes Operation * California Center for Innovative Transportation.
Traffic Incident Management – a Strategic Focus Inspector Peter Baird National Adviser: Policy and Legislation: Road Policing.
Developing a Regional Express Lane Network Hercules City Council Meeting April 28, 2009 Doug Kimsey MTC Planning Director.
Presented by: David Jackson & Michael Snavely, Cambridge Systematics, Inc. Robert Calix, Los Angeles County Metropolitan Transportation Authority May 9,
1/20/2011 US DOT/RITA Volpe National Transportation Systems Center 1 Economic Costs and Benefits of Road Pricing Douglass B Lee Jr Volpe Center.
May 10, 2011 Life-cycle Benefit-Cost Analysis of Alternatives for Accommodating Heavy Truck Traffic in the Las Vegas Roadway Network Dr. Alexander Paz,
Navigating SB 375: CEQA Streamlining and SB 743 Transportation Analysis 2014 San Joaquin Valley Fall Policy Conference.
National Road Pricing Conference June 4, 2010 Jennifer Tsien, PBS&J Angela Jacobs, Federal Highway Administration.
National Road Pricing Conference June 4, 2010 Mark Burris, Texas Transportation Institute Jessie Yung, Federal Highway Administration.
Freight Bottleneck Study Update to the Intermodal, Freight, and Safety Subcommittee of the Regional Transportation Council September 12, 2002 North Central.
Transportation leadership you can trust. presented to presented by Cambridge Systematics, Inc. TRB Applications Conference – Freight Committee May 7, 2013.
Orange County Business Council Infrastructure Committee December 14, 2010 Draft Long-Range Transportation Plan Destination 2035.
Mississippi River Bridge An Analysis of Alternatives DRAFT Final Report Presentation January 31, 2007.
BPAC. “Congestion management is the application of strategies to improve transportation system performance and reliability by reducing the adverse impacts.
Quantifying Transportation Needs and Assessing Revenue Options: The Texas Experience presented to The Arkansas Blue Ribbon Committee on Highway Finance.
Transportation leadership you can trust. presented to 11 th TRB Transportation Planning Applications Conference, May 2007, Daytona Beach presented by Robert.
1 Michael Eichler Department of Transportation Planning Presentation to the TPB Technical Committee January 8, 2009 CLRP Aspirations Scenario Preliminary.
Beyond the Crossroads National Conference on Transportation Infrastructure and Regulatory Policy May 27, Denver, CO Future Infrastructure Needs,
Presentation to ***(group) on ***(date) 1.  Cities - 11  Highway districts – 3  Ada and Canyon Counties  School districts – 2  Valley Regional Transit.
Connectivity & Mobility
North Central Texas Council of Governments Transportation Department Summary Presentation January 2004 MOBILITY 2025: THE METROPOLITAN.
Soup to Nuts: Changing Operating Parameters for HOV Facilities Sponsored by the HOV Pooled-Fund Study and the Federal Highway Administration.
Transportation leadership you can trust. presented to FHWA “Talking Freight” Seminar Series presented by Lance Neumann Cambridge Systematics, Inc. August.
AltaViz – GDOT’s Alternative Visualization Analysis Tool for the Atlanta Managed Lane System Plan February 25, 2011 Atlanta Model User Group Meeting Jennifer.
1 Mississippi River Bridge An Analysis of Alternatives Expert Panel Review Sharon Greene & Associates.
California Department of Transportation Transportation Management Systems (TMS) and their role in addressing congestion Discussion Materials Lake Arrowhead.
Client Name Here - In Title Master Slide Data Requirements to Support Road Pricing Analyses Johanna Zmud, Ph.D. NuStats Partners, LP Expert Forum on Road.
Managed Lanes CE 550: Advanced Highway Design Damion Pregitzer.
Tolling and Pricing Opportunities Under the Federal-aid Highway Program January 2006.
David B. Roden, Senior Consulting Manager Analysis of Transportation Projects in Northern Virginia TRB Transportation Planning Applications Conference.
Modeling HOT Lanes TPB’s Approach AMPO Travel Modeling Group March 21, 2006 I:\ateam\meetings_conf\ampo_tms\ \Hot_Lane_Pres_to_AMPO_Final.ppt.
Major Transportation Corridor Studies Using an EMME/2 Travel Demand Forecasting Model: The Trans-Lake Washington Study Carlos Espindola, Youssef Dehghani.
1 Transit and Climate Change April 10, 2008 Deborah Lipman Washington Metropolitan Area Transit Authority.
Overview of PPI’s in Georgia April 26, 2006 Earl Mahfuz, Treasurer.
Economics of Congestion Jagadish Guria Presentation to the the 8th Annual New Zealand Transport Summit 25 February 2008.
Transportation leadership you can trust. presented to TRB 11 th Conference on Transportation Planning Applications presented by Dan Goldfarb, P.E. Cambridge.
Presentation for Talking Freight, November 16, 2011 Debbie Bowden Freight and Economic Policy Analyst, Office of Freight and Multimodalism Maryland Department.
Regional HOT Lanes Study Preliminary Findings An Informational Hearing of the Senate Transportation and Housing Committee Toll Roads and Managed Lanes.
S.H. 121 – Dallas, Texas Case Study Presentation National Summit on Future Transportation Funding and Finance Strategies April 11, 2007 Michael Morris,
Making Work Zones Work Better Chung Eng Work Zone Mobility & Safety Team Office of Transportation Operations Federal Highway Administration US Department.
Assessing the Marginal Cost of Congestion for Vehicle Fleets Using Passive GPS Data Nick Wood, TTI Randall Guensler, Georgia Tech Presented at the 13 th.
The Fargo/Moorhead Area Interstate Operations Study Opportunities and Planned Activities Presentation for the Mn/DOT Travel Demand Modeling Coordinating.
Analysis of the IH 35 Corridor Through the Austin Metropolitan Area TRB Planning Applications Conference Jeff Shelton Karen Lorenzini Alex Valdez Tom Williams.
Estimating Volumes for I-95 HOT Lanes in Virginia Prepared for: 2009 Planning Applications Conference Houston, TX May 18, 2009 Prepared by: Kenneth D.
Managed Lanes and Bus Rapid Transit: Emerging New Financing Opportunities ENGINEERS PLANNERS ECONOMISTS Wilbur Smith Associates Ed Regan Senior Vice President.
I-680 Value Pricing: A HOT Lane Demonstration Project of “Smart Carpool Lanes” Sponsor: Alameda County Congestion Management Agency 2003 Sponsor: Alameda.
Briefing for Transportation Finance Panel Nov 23, 2015 Economic Analysis Reports: 1.I-84 Viaduct in Hartford 2.I-84/Rt8 Mixmaster in Waterbury 3.New Haven.
A Sketch Planning Assessment of Managed-Lane Options for the I-5 Freeway Corridor Master Plan William R. Loudon, DKS Associates.
Darrin Roth American Trucking Associations, Inc. INTERNATIONAL SYMPOSIUM ON ROAD PRICING.
Company LOGO Georgia Truck Lane Needs Identification Study Talking Freight Seminar March 19, 2008 Matthew Fowler, P.T.P Assistant State Planning Administrator.
IH-10 Managed Lanes Project: A “Public-Public” Partnership ENGINEERS PLANNERS ECONOMISTS Wilbur Smith Associates Presented at the Value Pricing Conference.
Freight Railway Integration Strategy For Inter-American Development Bank Transport Week 2009 by Transportation Technology Center, Inc. (TTCI) Subsidiary.
ADVANCED TRANSPORTATION AND CONGESTION MANAGEMENT TECHNOLOGIES DEPLOYMENT (ATCMTD) PROGRAM 1 Bob Arnold, Director Office of Transportation Management,
Transportation Revenue Sources Presentation to the Discovery Institute October 6, 2004 Amy Arnis Deputy Director Strategic Planning and Programming Washington.
Presentation to the Joint Committee On Transportation Oversight 1 Jack Basso Chief Operating Officer and Business Development Director American Association.
Charlotte Region Fast Lanes Study
Downtown Valdosta Truck Traffic Mitigation Study
I-77 High-Occupancy Toll Lanes
Performance-Based Planning:
Performance Measure Exploration Preparing for the 2018 RTP
ITTS FEAT Tool Methodology Review ITTS Member States Paula Dowell, PhD
I-81 Corridor Improvement Plan
Presentation transcript:

Feasibility of a Metropolitan Truck-only Toll Lane Network: The Case of Atlanta, Georgia Michael D. Meyer, P.E., Professor School of Civil and Environmental Engineering Georgia Institute of Technology

2 TOT Study High level proof-of-concept analysis Not an exhaustive list of options Analysis based upon… –Available regional truck travel data –HOT lane study analysis methods –Assumed facilities (engineering feasibility not examined.)

3 HOT/TOT Steering Committee Atlanta Regional Commission (ARC) Federal Highway Administration (FHWA) Georgia Department of Transportation (GDOT) Georgia Regional Transportation Authority (GRTA) State Road and Tollway Authority (SRTA) Georgia Motor Trucking Association American Transportation Research Institute Industry representatives (United Parcel Service, Lithonia Lighting, Drug Transport, Inc.) Steering Committee

4 Congestion in 2030 Afternoon Peak (PM) Map Legend: Projected GP Congestion Levels in 2030 Highway GP lanes at capacity/congested Highway GP lanes near capacity Highway GP lanes with capacity available

5 The Opportunity & a Challenge Most HOV corridors have excess capacity But some HOV corridors will be congested Map Legend: Projected HOV Congestion Levels in 2030 PM Peak HOV lanes at capacity/congested HOV lanes near capacity HOV lanes with capacity available

6 HOT and TOT Study Primary Assumptions 2030 target analysis year Managed lanes network on all limited access facilities –One lane in each direction inside I-285 –Two lanes in each direction on and outside of I-285 Scenarios evolved based on expected performance levels and ability to handle demand at reasonable levels of service. TOT Assumptions

7 TOT Lane Objectives “MANAGE” the new lanes…Building to achieve --- Free flow conditions for managed lane users Free flow conditions for the region’s planned BRT network Maximum use of the highway capacity

8 Why Interested? Trucks constitute significant portion of highway flows Trucks take up a lot of space (capacity) Logistics industry in Atlanta region is significant and likely to grow Growth in national economy suggests tremendous growth in through truck trips Truck/auto crashes

9 TOT Assumptions Voluntary use of TOT lanes Value of time: –$35/hr for heavy trucks (over 8,000 lbs.) –$18/hr for light trucks Fees charged when needed and in the amount needed to manage performance of TOT lanes Conservative passenger car equivalents used (1 truck = 2 cars) Truck lane interchanges provided at HOV interchanges for initial assessment Buses can use TOT lanes as well

10 Three Alternatives Evaluated Alternative 1: TOT lanes are established along side of planned HOV lanes. Alternative 2: Same as above, PLUS in midday hours (10am-3pm) light service trucks can use HOV lanes inside I-285. Alternative 3: TOT lanes are established in place of planned HOV lanes along I-285 and outside of I-285.

11 Alternative 1 Voluntary TOT –I-75 N –I-85 N –I-285 –I-75 S HOV network –Entire region Voluntary TOT –I-75 N –I-85 N –I-285 –I-75 S HOV network –Entire region North-South East-West

12 Alternative 2 Current HOV lanes inside I-285 restricted to light duty trucks in midday Current HOV lanes inside I-285 restricted to light duty trucks in midday

13 Alternative 3 Voluntary TOT –Outside I-285 –On I-285 HOV network –Inside I-285 only TOT replaces HOV outside and on I-285 Voluntary TOT –Outside I-285 –On I-285 HOV network –Inside I-285 only TOT replaces HOV outside and on I-285

Truck Productivity TOT Scenarios

15 TOT Alt 3: North-South corridor travel time 2030 PM Peak Period Through trip in TOT lanes saves 70 minutes in TOT lanes compared to travel time in GP lanes Alternative 3 North-South Truck Trip N

16 Alternative 3 East-West Truck Trip 2030 PM Peak Period Through trip in TOT lanes saves 80 minutes in TOT lanes compared to travel time in GP lanes N

17 Truck Trip Performance Percent of North-south Trip at Given Condition during PM Peak Hour 2030 Scenario Free Flow (LOS A-C) Near Capacity (LOS D) At Capacity/ Congested (LOS E-F) HOV 2+ Base * 14%48%38% A1/A2: Major Truck Corridors 84%16%0% A3: Regional TOT Network 92%8%0% *TOT base scenario

18 Change in Weekday Vehicle Hours and Vehicle Miles, 2030 TOT Alternative Scenario Weekday VMT (000s) Change in Weekday VMT from Base (000s) Weekday VHT (000s) Change in Weekday VHT (from Base (000s) HOV 2+ Base 159,787-6,139- A1: Major Truck Corridors 160,1080.2%5, % A2: Service to Deliveries 160,1380.2%5, % A3: Regional TOT Network 159, %5, % * Regional measures include all vehicle types on all arterials, collectors, and limited access facilities. Network Performance

19 Change in Weekday Vehicle Hours and Vehicle Miles, 2030 TOT Alternative Scenario Weekday VMT (000s) Change in Weekday VMT from Base (000s) Weekday VHT (000s) Change in Weekday VHT (from Base (000s) HOV 2+ Base 159,787-6,139- A1: Major Truck Corridors 160,1080.2%5, % A2: Service to Deliveries 160,1380.2%5, % A3: Regional TOT Network 159, %5, % * Regional measures include all vehicle types on all arterials, collectors, and limited access facilities. Network Performance

20 Performance of GP Lanes PM Peak Hour Percent GP Lanes Operating at Given Condition during PM Peak Hour 2030 Scenario Free Flow Near Capacity At Capacity/ Congested HOV 2+ Base40%31%29% A1/A2: Major Truck Corridors 46%32%22% A3: Regional TOT Network 48%28%24% 17 to 24% reduction in congested general purpose directional miles

21 Change in PM Truck Volume TOT Alternative 3

22 Performance of Arterials and Collectors Percent Arterials and Collectors Operating at Given Condition during PM Peak Hour 2030 Scenario Free Flow Near Capacity At Capacity/ Congested HOV 2+ Base66%16%18% A1/A2: Major Truck Corridors 69%16%15% A3: Regional TOT Network 68%16% A 10-15% reduction of congested arterial and collector miles

23 ARC modeled air quality impact and found little change in expected emissions, however…. Safety benefits are potentially huge ($3 million per fatality, not to mention delay costs) Air Quality and Safety

Projected Annual Revenue 2030 TOT Scenario Weekday Revenue per TOT Lane Mile Total Weekday Revenue (000s) Projected Annual Revenue (000s) A1: Major Truck Corridors $ 694 $ 327 $ 89,400 A2: Service to Deliveries $ 614 $ 372 $ 101,000 A3: Regional TOT Network $ 554 $ 724 $ 198,000

25 Improved freight and passenger movement –Regional travel time saving (for all, except HOV users) –More reliable travel conditions –Safer travel conditions (we believe) Efficient –Truck operators save time, increase productivity –Regionally, similar vehicle miles traveled in fewer hours Potentially cost effective –Opportunity to offer substantial benefits, earn revenue What We Learned About TOT Lanes

26 Comparative Results of Regional Managed Lane Strategies 2030 HOV, HOT and TOT Scenarios

27 System-wide Annualized Capital & Operating Costs (M) HOV 2HOT 3+TOT A3 Capital Cost 1 $ 578$ 591$ 589 Operating Cost 2 $ 26 $ 72$ 41 Total Cost$ 604$ 662$ 630 Fee Revenue$ 0$ 90$ 198 Net Revenue Over Op. Cost- $ 26$ 18$ Capital costs are assumed to be sunk costs with 30 year bonds at 5% interest. Values may not sum due to rounding error. 2.Operating costs include administration, enforcement and maintenance.

28 Regional Value of Annual Time Savings* Estimates ($M) Regional value of time (VHT) saved versus HOV 2 base ($M) HOT 3+TOT A3 Light $18/hr $ 22$ 492 Heavy $35/hr. $ 13$ Occupant $15/hr - $ 101- $ 260 Single Occupant $15/hr. $ 379$ 905 Total** $ 313$ 1,504 * Savings is change from TOT analysis HOV base alternative; HOT 3+ scenario incorporates TOT model refinements. ** Values may not sum due to rounding error.

29 PM Peak Hour Level of Service General Purpose Lanes Free Flow (LOS A-C) Near Capacity (LOS D) At Capacity / Congested (LOS E-F) HOV 2+ Base 40 %31 %29 % HOT %32 %28 % TOT A3 48 %28 %24 % 20% increase in free flow performance

30 Range of responsibilities for TOT planning, development, operation, maintenance, and enforcement Common visions and principles Determine pricing strategy early on Regional vs. corridor-level issues Consistency with RTP TOT alternative in corridor studies Potential for PPP Use of revenues Public outreach Consistency with region’s fee collection strategy Implementa- tion

31 Travel demand model can be used for an analysis-driven debate Confluence of technical analysis and political advocacy Trucking representatives Strategy tied to BRT Voluntary use of lane Corridor-level studies with freight component Trade-off between HOV and …. Lessons Learned

32 Some Extensions Since the Study Was Done

33 Application of Screening Criteria (1) Screening Criterion 2: Daily truck volume Source: Hsing-Chung Chu, Implementing Truck-Only Toll Lanes at the State, Regional, and Corridor Levels: Development of a Planning Methodology, unpublished Ph.D. dissertation, School of Civil and Environmental Engineering, Georgia Institute of Technology, Screening Criterion 1: PM level of service

34 Application of Screening Criteria (2) Screening Criterion 4: High truck-related crashesScreening Criterion 3: Daily truck percentage Source: Hsing-Chung Chu, Implementing Truck-Only Toll Lanes at the State, Regional, and Corridor Levels: Development of a Planning Methodology, unpublished Ph.D. dissertation, School of Civil and Environmental Engineering, Georgia Institute of Technology, 2007.

35 Application of Screening Criteria (3) Potential TOT corridors – Combine screening criteria Source: Hsing-Chung Chu, Implementing Truck-Only Toll Lanes at the State, Regional, and Corridor Levels: Development of a Planning Methodology, unpublished Ph.D. dissertation, School of Civil and Environmental Engineering, Georgia Institute of Technology, Screening Criteria 5: 90% cost saving threshold

Planning Guidance (2) Identify Potential TOT Corridors and Their Extents (3) Determine the Placement of TOT lanes (6) Determine a Mandatory or Voluntary Policy (4) Determine the Location of Access Points (5) Determine Vehicle Eligibility (7) Determine the Pricing Strategy (8) Determine the Financing Mechanism (1) Define Goals, Objectives, and Performance Measures Implementation Steps for TOT Lanes Public-private partnerships Connect freight generators Trucking industry support Screening Process Efficiency, Safety, Freight productivity, Self-financing, Environment Through truck traffic Excess capacity – medium trucks Variable pricing / Optimum toll rates Source: Hsing-Chung Chu, Implementing Truck-Only Toll Lanes at the State, Regional, and Corridor Levels: Development of a Planning Methodology, unpublished Ph.D. dissertation, School of Civil and Environmental Engineering, Georgia Institute of Technology, 2007.