Slide 1 2006 ITRS Spring Meeting Sponsored by Infineon Technologies Philips Semiconductors STMicroelectronics.

Slides:



Advertisements
Similar presentations
TWO STEP EQUATIONS 1. SOLVE FOR X 2. DO THE ADDITION STEP FIRST
Advertisements

Bellwork If you roll a die, what is the probability that you roll a 2 or an odd number? P(2 or odd) 2. Is this an example of mutually exclusive, overlapping,
Chapter 1 The Study of Body Function Image PowerPoint
1 Copyright © 2010, Elsevier Inc. All rights Reserved Fig 2.1 Chapter 2.
______________________________________________ 2004 first pass 2004 Programs Thu - Sat -am Mon pmam Tue pm am Wed pmam Thu pmam Fri pm Sat Fri.Sun
2011 ITRS Revision Guidelines1 JAN – MARCH – ITRS TABLES DRAFTS PREPARED –ITWGs and CrossTWG Study Group meet each month with their teams to work Difficult.
IRC Roll-Out/Plenary 4/4 Technology Node identified by xx90 –Minimum Half-Pitch of Metal 1 of either DRAM or Logic –Logic node presently being represented.
ITRS Winter Conference 2006 The Ambassador Hotel Hsin Chu Taiwan 1 ITRS IRC/ITWG Meetings HsinChu December 4, 2006 UPDATED Linda Wilson
2011 ITRS REVISION SCHEDULE AND GUIDELINES CONTENTS 2011 Due Dates and Meetings Whats New for 2011 ? Template info Chapter required topics outline and.
Slide 1 Apr 3 – 4 ITRS ITWG/IRC workshop July 14Presentation Drafts due 1 page text summary of key changes to tables and slides in powerpoint [do NOT send.
The International Technology Roadmap for Semiconductors
2010 ITRS Winter Meeting AGENDA(Proposal) Winter WORKSHOP AGENDA AND SCHEDULE(Proposal) Rev.1 Wednesday, 1December --- Tsukuba International Congress.
3-4 December 2012 Ambassador Hotel HsinChu, Taiwan ITRS WINTER PUBLIC CONFERENCE Wednesday 5 December – Ambassador Hotel, HsinChu, Taiwan MORNING.
International Technology Roadmap for Semiconductors
February 2010 L. Wilson Update Preparations and Formats.
International Technology Roadmap for Semiconductors 2001
ITRS Roadmap Design + System Drivers Makuhari, December 2007 Worldwide Design ITWG Good morning. Here we present the work that the ITRS Design TWG has.
Slide 1 ITRS 2006 Update The First Twelve Slides: –Objective of 2006 Update ………………………………….Slide 2 –2006 ITRS Schedule …..…………………………………….Slide 3 –Group.
Munich, 21. – 23. October 2005 Welcome to the UEMS Management Council Meeting 2005.
Mourad Loulou, Tunisia Section Chair 1 Mourad Loulou Tunisia Section Chair IEEE Tunisia Section.
Slide 1 FastFacts Feature Presentation October 13, 2009 We are using audio during this session, so please dial in to our conference line… Phone number:
Doc.: IEEE /0008r2 Submission March 2006 Steve Shellhammer, QualcommSlide 1 EC Summary of PAR Development Notice: This document has been prepared.
Vivek Gupta, Chair WG Joint Opening Plenary IEEE Media Independent Handover Services Session #23 Atlanta, Georgia Vivek Gupta
UNITED NATIONS Shipment Details Report – January 2006.
National Thousands Block Number Pooling Services NANC Meeting January 13, 2004.
NANPA Oversight Working Group Status Report to the NANC April 17, 2001 Chair Pat Caldwell.
The MPI Forum: Getting Started Rich Graham Oak Ridge National Laboratory.
Business Transaction Management Software for Application Coordination 1 Business Processes and Coordination.
GSMP Local Community Network Enhanced Process San Diego - 2 Oct Melanie Kudela.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Title Subtitle.
February, 2010 LEA Support Advisory Council. Agenda 2:30-3:00Discuss plan revision process (feedback and support) 3:00-3:30Discuss February workshops.
0 - 0.
DIVIDING INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
ADDING INTEGERS 1. POS. + POS. = POS. 2. NEG. + NEG. = NEG. 3. POS. + NEG. OR NEG. + POS. SUBTRACT TAKE SIGN OF BIGGER ABSOLUTE VALUE.
SUBTRACTING INTEGERS 1. CHANGE THE SUBTRACTION SIGN TO ADDITION
MULT. INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
Addition Facts
Richmond House, Liverpool (1) 26 th January 2004.
BT Wholesale October Creating your own telephone network WHOLESALE CALLS LINE ASSOCIATED.
Report Card P Only 4 files are exported in SAMS, but there are at least 7 tables could be exported in WebSAMS. Report Card P contains 4 functions: Extract,
ABC Technology Project
4 th Annual User Meeting The Next Steps! Wednesday & Thursday, October 23 & 24, 2013 Westin Buckhead, Atlanta GA AGENDA.
Shakopee Tennis Association
VOORBLAD.
Squares and Square Root WALK. Solve each problem REVIEW:
We are learning how to read the 24 hour clock
© 2012 National Heart Foundation of Australia. Slide 2.
1 Web Pages Week Three more tags… Sound Redirection Marquee.
Past Tense Probe. Past Tense Probe Past Tense Probe – Practice 1.
Submission doc.: IEEE 802-EC-13/0033r0 July 2013 Jon Rosdahl, CSRSlide 1 ExSec Agenda Items July 2013 Plenary Date: Authors:
GG Consulting, LLC I-SUITE. Source: TEA SHARS Frequently asked questions 2.
EuNet European network on international relations policies and town twinning First transnational conference Political Representatives 18/21 April 2012,
Addition 1’s to 20.
25 seconds left…...
Mail-merge and Contact Log Shaun Elliott – Business Consultant Enhance your knowledge, improve your organisation.
Januar MDMDFSSMDMDFSSS
Week 1.
We will resume in: 25 Minutes.
1 Unit 1 Kinematics Chapter 1 Day
1 PART 1 ILLUSTRATION OF DOCUMENTS  Brief introduction to the documents contained in the envelope  Detailed clarification of the documents content.
How Cells Obtain Energy from Food
FINAL EXAMINATION SCHEDULE SPRING 2009 MAY 15 – MAY 22 NOTE: A class that meets at more than one of the times on this final examination schedule will take.
Let’s go to school in Reims! Programme of the mobility May 11th -16th 2014.
Presentation transcript:

Slide ITRS Spring Meeting Sponsored by Infineon Technologies Philips Semiconductors STMicroelectronics

Slide 2 Monday Plenary Agenda Monday Morning –Welcome –Overview of Days Agendas & Special Events –2006 Update Task –2006 Key Dates –Instructions for the ITWGs for Monday –other items Monday Afternoon –IRC Rollout [Start times may be adjusted] –TWG Q&A

Slide 3 Tuesday Plenary Agenda Tuesday Morning –Optional Plenary [decided at Monday PM] –Key Challenges for each ITWG for 2006 Tuesday Afternoon –IRC Rollout –TWG Q&A

Slide 4 Agenda April 6 (Thursday) 8:30 - 9:15 Registration 9: :00Plenary General Session with ITWGs/IRC 10: :00Breakout for ITWGs and IRC 12: :30Lunch 13: :45Continued Breakout for ITWGs and IRC 16: :30Plenary with ITWGs/IRC Rollout 17: :00Break before dinner 18:00 Bus leaves for Hap and Stap event 18:00- 20:00Dinner Evening Details The special event on Thursday evening is called Hap and Stap. It includes a walking tour of Maastricht and a selection of restaurants for the evening.

Slide 5 Agenda April 7 (Friday) 8: :00Breakout for ITWGs and IRC [or Optional Plenary with IRC/ITWGs] 10: :00 Continued Breakout for ITWGs and IRC 12: :00Lunch 13: :45Continued Breakout for ITWGs and IRC 16: :30Plenary 17:30- 18:00 Break before dinner 18: :00Buffet Dinner in the Hotel

Slide 6 What is the 2006 Update? Each working group reviews their tables only for any corrections or updates, based on the industrys latest information –If a TWG needs to update figures or text, then report to IRC for discussion/approval. –2006 Timeframe Update uses the 2005 ITRS 15-year timeframe: 2005 through –Use the WAS-IS format from the 2005 tables for those rows that need to be updated. –Each ITWG writes a 1-page summary of key changes/challenges for the 2006 Update. –These updates must be finished by September 2006

Slide ITRS Update Instructions Instructions cover the 2005 ITRS table line items that are updated, deleted, or added. The word file of each TWG chapter is posted online at and was sent to each team in January. [Ask your TWG chair] Tables requiring revision can remain in Word or put into Excel spreadsheets for update by the TWG. Update format must be maintained in order to see new revisions as follows: –Each table indicates 2005 line items that require revision as WAS, with duplicate rows beneath the WAS row for update if new data or correction for 2006 Update apply. –Each ITWG fills in this new IS row with the new data. Deleted or new additional lines can also be indicated. –Deleted line items are noted as DELETE and with the data struck through. –New lines are noted as ADD and are located as they should be within a table. As added new information, these do not have WAS rows.

Slide 8 Jan – AprIRC, CrossTWG Study Group, and DTWG meetings ITWGs receive packets of 2005 chapter in Word, instructions for 2006 update. ITWGs work on review and update of tables only. [chapter text is NOT required to be updated!] Apr 5 – 7 ITRS ITWG/IRC meeting near Maastricht, the Netherlands at the Dolce Kasteel Vaalsbroek Jun 30Group 1 tables due to Group 2 teams and the ITRS office Jun 30Presentation Drafts due for preparing the July handout CD: 1 page text summary of key changes to tables and ~20 slides in powerpoint [do NOT send PDF…] Jul 10 – 11 ITRS ITWG/IRC meeting in San Francisco at the Hotel Marriott Jul 12ITRS Conference at the Hotel Marriott 2006 ITRS Key Dates for IRC and ITWG

Slide 9 Jul 24Group 2 tables are due to Group 1 and 3 teams and the ITRS office Aug 24Group 3 chapters are due to Group 2 and 3 teams and the ITRS office Sep ITRS content is frozen OctRegional Executives Advisory board approve ITRS Nov 10 Presentation Drafts due for preparing for December Public meeting CD Dec 4 ITRS ITWG/IRC meetings in Hsin Chu, Taiwan at the Ambassador Hotel Dec 5ITRS Conference at the Ambassador Hotel Dec 2006 Update is posted online to the public ITRS Key Dates for IRC and ITWG

Slide ITRS Working Groups Group 1 System Drivers & Design, Process Integration, RF/AMS Wireless, ORTC Group 2 Front-end Processes, Lithography, Interconnect, Assembly & Packaging, Test & Test Equipment, ORTC Group 3 Emerging Devices, ESH, Yield Enhancement, Metrology, Modeling, Factory Integration, ORTC

Cross TWG Schedule Slide 11

Cross TWG Schedule Slide 12

Cross TWG Schedule Slide 13

Slide 14 ITRS Special Events Electronics Manufacturers Summit webcast by Semiconductor International – April 18, 19, 20 ASMC highlights on ITRS Boston, MA – May 22-24