Service Pack 1 Overview EPM 2007 Adrian Jenkins| Microsoft Supportability Program Manager Christophe Fiessinger| Microsoft Technical Product Manager.

Slides:



Advertisements
Similar presentations
Site Collection, Sites and Sub-sites
Advertisements

Microsoft Office SharePoint Portal Server 2007 Introduction to InfoPath Forms Services Daryl L. Rudolph.
Review and Q&A Sheila Volante Project Server 2007.
WSUS Presented by: Nada Abdullah Ahmed.
IT Project Management, Third Edition Appendix A1 Appendix A: Guide to Using Microsoft Project 2002.
NetAcumen ActiveX Download Instructions
OLAP Cubes and Pivot Tables Leveraging the Power of a Microsoft EPM Solution EPM Customization Series Part 1 February 21 st, 2007 Brendan Giles, PMP, MCP.
1 of 4 This document is for informational purposes only. MICROSOFT MAKES NO WARRANTIES, EXPRESS OR IMPLIED, IN THIS DOCUMENT. © 2007 Microsoft Corporation.
Project Server “12”: Developing Project Management Solutions Phil Smail OFF311 Program Manager Microsoft Project Business Unit.
1 of 5 This document is for informational purposes only. MICROSOFT MAKES NO WARRANTIES, EXPRESS OR IMPLIED, IN THIS DOCUMENT. © 2006 Microsoft Corporation.
1 of 4 This document is for informational purposes only. MICROSOFT MAKES NO WARRANTIES, EXPRESS OR IMPLIED, IN THIS DOCUMENT. © 2007 Microsoft Corporation.
Christophe Fiessinger & Jan Kalis Senior Technical Product Manager Microsoft Corporation Session Code: OFS214.
Microsoft Office Project 2003 Resource Kits James Scott & Roy Riley Technical Content Development Microsoft Corporation.
OFC324 Microsoft Project Server: Putting Enterprise Project Management (EPM) To Work Sam Brooks
11 MAINTAINING THE OPERATING SYSTEM Chapter 5. Chapter 5: MAINTAINING THE OPERATING SYSTEM2 CHAPTER OVERVIEW Understand the difference between service.
Information about Microsoft Project and Microsoft Project Server October 2011 Software Update Adrian Jenkins Senior Escalation Engineer Microsoft Corporation.
Working with SharePoint Document Libraries. What are document libraries? Document libraries are collections of files that you can share with team members.
Winter Consolidated Server Deployment Guide for Hosted Messaging and Collaboration version 3.5 Philippe Maurent Principal Consultant Microsoft.
Module 16: Software Maintenance Using Windows Server Update Services.
16.1 © 2004 Pearson Education, Inc. Exam Managing and Maintaining a Microsoft® Windows® Server 2003 Environment Lesson 16: Examining Software Update.
11 MAINTAINING THE OPERATING SYSTEM Chapter 5. Chapter 5: MAINTAINING THE OPERATING SYSTEM2 CHAPTER OVERVIEW  Understand the difference between service.
1 of 5 This document is for informational purposes only. MICROSOFT MAKES NO WARRANTIES, EXPRESS OR IMPLIED, IN THIS DOCUMENT. © 2007 Microsoft Corporation.
Update your servers to service pack 2. Ensure that the environment is fully functioning. Migrate to 64 bit servers is necessary. REVIEW UPGRADE BEST PRACTICES.
Welcome to the Minnesota SharePoint User Group. Introductions / Overview Project Tracking / Management / Collaboration via SharePoint Multiple Audiences.
Information About Microsoft Project and Project Server Cumulative December Update Adrian Jenkins Support Escalation Engineer Microsoft Corporation 1 Brian.
Lessons Learned: Using the Experience of Others to Avoid Common Project Server Mistakes LaDonna Carpenter Technical Lead Product Support Services Microsoft.
Developing Workflows with SharePoint Designer David Coe Application Development Consultant Microsoft Corporation.
OFC 200 Microsoft Solution Accelerator for Intranets Scott Fynn Microsoft Consulting Services National Practices.
Module 13: Maintaining Software by Using Windows Server Update Services.
11 MANAGING AND DISTRIBUTING SOFTWARE BY USING GROUP POLICY Chapter 5.
How to organize and plan your people and resources for EPM Roy Kayahara Program Manager Microsoft Office Project Microsoft Corporation.
Microsoft Office Solution Accelerator for Six Sigma – A Case Study in Project Server Customization Brian Smith Program Manager Information Worker New.
OLAP Cubes and Pivot Tables Leveraging the Power of a Microsoft EPM Solution EPM Customization Series Part 1 February 21 st, 2007 Brendan Giles, PMP, MCP.
Slide 2 The Microsoft Office Project 2003 Software Development Kit Jim Corbin Programmer Writer Office Developer Documentation Microsoft Corporation Uma.
Timesheet Deployment Considerations with Microsoft Office EPM Solution David Ducolon Program Manager Project Microsoft Corporation.
Implementing Resource Management within EPM Roy Kayahara Program Manager Microsoft Office Project Microsoft Corporation.
Project Server 2003: DC340: Security (Part 1 of 2): How to securely deploy Project Server in an enterprise environment Pradeep GanapathyRaj (PM), Karthik.
Migration from Software Update Services to Windows Server Update Services Jeff Alexander IT Pro Evangelist Microsoft Australia Scott Korman WSUS MVP SEC316.
Project 2003 Presentation Ben Howard 15 th July 2003.
DC440: Security (Part 2 of 2): Logons, permissions and views - how these systems work and how to manage them Pradeep GanapathyRaj Program Manager Project.
Slide 1.NET Development for Project 2003 Samples from the Project 2003 SDK Jim Corbin Programmer Writer Office Developer Documentation Microsoft Corporation.
Module 5: Configuring Internet Explorer and Supporting Applications.
Systems Management Server 2.0: Backup and Recovery Overview SMS Recovery Web Site location: Updated.
Tips and Tricks for Managing and Administering your Enterprise Project Management Server Solution Mike Joe / Karthik Chermakani Software Test Engineer.
WEBCAST SCHEDULE Today’s event will run one-hour long. Here are the expected times for each segment of the Webcast:  :00 – :05: Moderator introduces the.
Microsoft Project June 2010 Cumulative Update Microsoft Confidential1.
1 Microsoft Project Solution Offerings and the next chapter of EPM September 17th, 2003 Brendan Giles, PMP Systemgroup Management Services.
WCL303 Business Desktop Deployment (BDD) 2007: Part 2, Deploying the 2007 Office system Michael Niehaus Systems Design Engineer Microsoft
Connect with life Vedant Kulshreshtha Technology Solutions Professional – SharePoint | Microsoft India
Microsoft Office Project 2003: A tour of the EPM Solution.
Windows Small Business Server 2003 R2 Powering Small Businesses.
The 2007 Microsoft Office System Servers Enterprise Content Management, Workflow and Forms Martin Parry Developer and Platform Group, Microsoft Ltd
Internet Explorer 7 Updated Advice for the NHS 04 February 2008 Version 1.3.
Application Migration Fritz Ohman Alphageek
MPUG Global December 2 nd 2004 Portland, Oregon Brian Smith, Microsoft Corporation.
ITMT 1371 – Window 7 Configuration 1 ITMT Windows 7 Configuration Chapter 8 – Managing and Monitoring Windows 7 Performance.
Portfolio Analyzer Extender v. 1240
SharePoint 101 – An Overview of SharePoint 2010, 2013 and Office 365
How to be a SharePoint Developer
MODULE 10 – PROJECT SERVER
Appendix A: Guide to Using Microsoft Project 2002
Microsoft SharePoint Server 2010 Ignite!
RMS with Microsoft SharePoint
Session Objectives And Key Takeaways
12/31/ :55 AM © 2004 Microsoft Corporation. All rights reserved.
Site scripts and Site Design
Microsoft Office Project Server 2007: Server Administration
Introduction to VSTS Database Professional
Appendix A: Guide to Using Microsoft Project 2002
Windows Forms in Visual Studio 2005: An in-depth look at key features
Presentation transcript:

Service Pack 1 Overview EPM 2007 Adrian Jenkins| Microsoft Supportability Program Manager Christophe Fiessinger| Microsoft Technical Product Manager

Agenda Overview & Service Pack 1 (SP1) content Download locations Deployment guidelines Post SP1 hot fix rollup Questions and Answers

What SP1 is Hot fixes and DCRs Customer reported problems Crashing problems reported Microsoft internally reported issues Postponed issues found near the original 2007 ship date Security fixes

What SP1 is not A service pack based heavily on support call data The size and depth that would normally be expected for a first service pack For more information: KB ArticleTitle Description of the 2007 Office System servers Service Pack Description of the Microsoft Windows SharePoint Services 3.0 Service Pack Description of the Microsoft Office Project 2007 Service Pack Description of the Office 2003 Web Components Service Pack 1 for the 2007 Microsoft Office System Description of Microsoft Office Language Interface Pack 2007 Service Pack 1

List of SP1 Fixes Themes: Lookup Table & Custom Fields Active Cache Queue Timesheet & Statusing PerformanceStability KB ArticleDescription Issues fixed in Project 2007 by 2007 Office suite Service Pack Issues fixed in Project Server 2007 by Office 2007 Servers Service Pack Issues fixed in Windows SharePoint Services 3.0 by Windows SharePoint Services 3.0 Service Pack Issues fixed in Office SharePoint Server 2007 by 2007 Office System servers Service Pack Issues Fixed in Microsoft Project Portfolio 2007 Service Pack 1

Where to download SP1? Office Language Packs Office Language Packs Office Web Components Office Web Components Project Language Pack Project Language Pack Servers (MOSS, Project, Forms, Groove) Servers (MOSS, Project, Forms, Groove) Server Language Packs, x86 Server Language Packs, x86 Server Language Packs, x64 Server Language Packs, x64 Windows SharePoint Services Windows SharePoint Services Windows SharePoint Services Language Pack Windows SharePoint Services Language Pack Windows SharePoint Services Language Pack, x64 Windows SharePoint Services Language Pack, x64 Windows SharePoint Services with SP1 (slipstream) Windows SharePoint Services with SP1 (slipstream) Windows SharePoint Services with SP1, x64 (slipstream) Windows SharePoint Services with SP1, x64 (slipstream)

Deployement Guidelines Deploy software updates for Office Project Server 2007 Deploy software updates for Office Project Server 2007 Deploy software updates for Windows SharePoint Services 3.0 Planning and Deploying Service Pack 1 for Microsoft Office SharePoint Server 2007 in a Multi-server Environment Planning and Deploying Service Pack 1 for Microsoft Office SharePoint Server 2007 in a Multi-server Environment Deploy in pre-production/test platform first, and validate specific fixes you were expecting in SP1. Validate your typical usage scenarios prior to any deployment into production.

Post SP1 Hot fix Rollup Patch - 1 What is it? Hot fixes made after the SP1 code base was locked down and up until SP1 is released Typically released 4 to 8 weeks after a SP Leverage your Microsoft representative to get it Should I wait for its release prior to deploying SP1? Depends if it contains specific fixes that are specific to your deployment.

Post SP1 Hot fix Rollup Patch - 2 Project Client: KB ArticleDescription Error 458 appears when using the ProjectBeforeTaskChange or ProjectBeforeTaskChange2 VBA event Project crashes intermittently while connecting to Project Server and products such as Black Ice Firewall are installed Booking type of resources within a project get changed during the migration process Assignment booking type does not make it into the ASSN_BOOKING_TYPE column in dbo.MSP_ASSIGNMENTS table Project may keep crashing when a user tries to save a project back to Project Server Script error appears when closing a project while the Save Baseline or List project guide is open Users are able to save baselines on imported plans despite being denied in security settings Project may crash when grouping a resource view by RBS level

Post SP1 Hot fix Rollup Patch - 3 Project Server: KB ArticleDescription Adding more work to a task that has progress and is tracked on a % Complete basis incorrectly adds work to the task A crash may occur when updating tasks on multiple summary tasks via PSI OLAP cube dimensions do not work properly for the MSP_Project_Timesheet cube Build Team: Default Assignment owner is not changed after resources substitution in PWA / Status manager field not updated when saved from a template UpdateUserSyncSetting tool not working properly Need ability to clear rejected task assignment via PSI Self assign with actuals appears as one request in approvals 'Start Date' for tasks shows as NA in Applied Requests and Errors Updating custom field via PSI may cause ProjectSchedulingEngineException error Error when users are set to a high a RBS level IE has encountered a problem with an add-on and needs to close - PJGRID12.ocx Synching to WSS Root site can take a long time depending on the number of users being synchronized. An option now exists to disable sync Self assign to an existing task with an assignment incorrectly shows an update is needed to the resource the was originally assigned to the task Project Owners dropdown in Edit Project Properties does not take RBS into Account Updating tasks in PWA may cause failure to load projects in Project Professional Need the ability to remove themselves from a task with actual work is already applied Outline codes are not indented in Grouping views

Questions & Answers - 1 Will SP1 break existing customization? It depends! If you’ve changed standard PWA pages, database schema and stuff like that, then you could run into problems. Otherwise, things should be OK. Have there been any changes or fixes to PSI methods? No changes to the methods. There haven’t been any major fixes.

Q & A - 2 Have there been changes to PSMigrate? Not really. It has been recompiled to match Winproj.exe. There is a post SP1 rollup fix that does fix an issue with resource booking types. Can I migrate from PS 2003 to PS SP1? Yes, you can apply SP1 on your target environment. PS 2003 SP3 is NOT a pre- requisite nor is it necessary. Does SP1 contain any additional tools? No. There are no tools, for example, to check whether or not MPP files have become corrupted and so forth.

Q & A - 3 Are there any fixes that are specific to localized languages? No. When we were looking at the fixes to put into SP1, we were unaware of issues that were specific to a localized build. When will the SP1 language packs, 64-bit and 32-bit versions be shipped? All at the same time.

Q & A - 4 Are there any dependencies between the SP1 client and server versions? No. We test with RTM clients against SP1 servers and vise versa. However, with all of the fixes that are in SP1, it is a great idea to have both the server and client upgraded to SP1. There are also no dependencies between Office desktop applications. For example, you can install Project 2007 SP1 and still have Office 2007 at the RTM level. You will need to install WSS 3.0 SP1 before installing Project Server SP1, however.

Q & A - 5 Are there any database schema changes? A few minor changes. There are a lot of stored procedures and index changes to improve performance. Have any fixes been made that will help master and sub projects work better together – especially those that have been imported? Yes, there was a hot fix done for this and it is included in SP1.

Q & A - 6 Where can I get Project Portfolio Server SP1? PPS SP1 should be released next week Does SP1 contain updates to PWA’s ActiveX controls? Yes, they will have to be redeployed on the desktops. Please note that the hot fix rollup package will contain updates as well. How do we verify the version number of the client and the server? In Project go to Help/About MS Office Project (6215) On the server go to Central Admin/Operations/Servers in Farm (6219)

Q & A - 7 Is the CodePlex Timesheet Tied-Mode solution starter included in SP1? No, here’s a link: Timesheet Tied-Mode v1.0 Timesheet Tied-Mode v1.0 Timesheet Tied-Mode v1.0 What’s the plan for SP2? No target date so far, driven based on feedback. If you have issues continue to work with Microsoft Support to get a hot fix. What about compatibility with the next version of Windows Server 2008 and the next version of SQL Server 2008? Issues are being addressed with beta versions of these products.

18 © 2007 Microsoft Corporation. All rights reserved. This presentation is for informational purposes only. Microsoft makes no warranties, express or implied, in this summary.