Status and Integration of the Spectrometer Solenoid Magnets Steve Virostek Lawrence Berkeley National Lab MICE RAL June 15, 2007.

Slides:



Advertisements
Similar presentations
CM-22 Magnet Issues, 6 June MICE Magnet Cool Down and Other Issues Michael A. Green Lawrence Berkeley Laboratory Berkeley CA
Advertisements

MICE RF and Coupling Coil Module Outstanding Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 26, 2004.
The Use of Small Coolers for Hydrogen and Helium Liquefaction
Magnet Cooldown Scheme 17 th February 2012 Roy Preece (STFC RAL)
Coupling Coil Test Facility Update Ruben Carcagno Fermilab September 20, 2012.
MICE Superconducting Solenoids: Status and Update RAL: T W Bradshaw M Courthold J Rochford M Hills D Baynham Oxford: J Cobb W Lau S Yang MICE.
MUTAC Review, 9 April MuCOOL and MICE Coupling Magnet Status Michael A. Green Lawrence Berkeley Laboratory Berkeley CA
Spectrometer Solenoids MICO 146 Steve Virostek LBNL June 6, 2011.
Trip Report on the visit to ICST of HIT, Harbin, China Derun Li Mike Green Steve Virostek Mike Zisman Lawrence Berkeley National Laboratory (from December.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab MICE Video Conference 114 September 18, 2008.
Spectrometer Solenoid Design and Procurement Review Steve Virostek Mike Green Mike Zisman Lawrence Berkeley National Lab MICE Collaboration Meeting October.
23 October 2005MICE Meeting at RAL1 MICE Tracker Magnets, 4 K Coolers, and Magnet Coupling during a Quench Michael A. Green Lawrence Berkeley Laboratory.
Installation Issues Steve Virostek Lawrence Berkeley National Lab MICE CM23 at ICST, Harbin January 13, 2009.
Spectrometer Solenoid Report and Coupling Coil Update Michael S. Zisman MICE Operations Manager Center for Beam Physics Lawrence Berkeley National Laboratory.
Spectrometer Solenoid Fabrication Update Steve Virostek Lawrence Berkeley National Lab MICE CM23 at ICST, Harbin January 14, 2009.
Spectrometer Solenoid Update Steve Virostek - LBNL MICE Video Conference #129 February 25, 2010.
9 June 2006MICE CM-15 Fermilab1 Progress on the MICE Cooling Channel and Tracker Magnets since CM-14 Michael A. Green Lawrence Berkeley Laboratory.
1S. Virostek - LBNL Spectrometer Solenoid Fabrication Update S. Virostek and M. Green are visiting vendor today for progress update Vendor expects to complete.
Spectrometer Solenoid Update Steve Virostek - LBNL MICE Video Conference #145 December 15, 2011.
Spectrometer Solenoid Fabrication & Testing Update Steve Virostek Lawrence Berkeley National Lab MICE CM24 at RAL June 1, 2009.
Design of the MICE RF Cavity Module :Status of the module designModule flange sealing options Steve Virostek Lawrence Berkeley National Lab MICE
1S. Virostek - LBNL Spectrometer Solenoid Fabrication Update Vendor still expecting to complete first magnet by the end of November, before X-mas more.
1 Technical Arguments in Favor of using the Cryomech PT-415 Cooler for Cooling the LH 2 Experiment Michael A. Green Lawrence Berkeley Laboratory Berkeley.
12 March 2006NFMCC Meeting, IIT, Chicago1 Progress on the MICE Cooling Channel and Tracker Magnets Michael A. Green Lawrence Berkeley Laboratory.
Update Hardware for conductive cooling of the quench resistors has been fabricated at LBNL. Preparation for installation to start this week. Installation.
Spectrometer Solenoid and RFCC Update Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory.
Spectrometer Solenoid Fabrication & Testing Update Steve Virostek Lawrence Berkeley National Lab MICE Collaboration Meeting #26 University of California.
MICE Collaboration Meeting CM-151 Is the the pulse tube cooler a must or is it simply better for the MICE AFC module? Michael A. Green Lawrence Berkeley.
Spectrometer Solenoids and Coupling Coils Primary Activities and Risks Going Forward Spectrometer Solenoids Completion of SS#2 magnetic mapping Completion,
RF Cavity / Coupling Coil Module
Assembly, Installation and Interfaces Steve Virostek Lawrence Berkeley National Lab RFCC Module Design Review October 21, 2008.
Progress on the MuCool and MICE Coupling Coils * L. Wang a, X. K Liu a, F. Y. Xu a, A. B. Chen a, H. Pan a, H. Wu a, X. L. Guo a, S. X Zheng a, D. Summers.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab Roy Preece Rutherford Appleton Lab October 28, 2011 MICE Collaboration Meeting.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MAP Winter Collaboration Meeting at JLab, Virginia February 28, 2011.
Magnet quench during a training run Successfully trained to peak currents and operationally tested Thermal performance requirements met 3D magnetic bore.
Spectrometer Solenoid Test Plan Workshop: Spectrometer Solenoid Overview Steve Virostek - LBNL February 17, 2012.
Spectrometer Solenoids MICO 214 Steve Virostek LBNL February 6, 2013.
Spectrometer Solenoid: Plans to Fix Magnet 2 Steve Virostek Lawrence Berkeley National Lab Spectrometer Solenoid Review November 18, 2009.
Preliminary Design for the Coupling Coil Cryostat in MICE
Spectrometer Solenoid Fabrication & Testing Update Steve Virostek Lawrence Berkeley National Lab MICE CM25 at RAL November 6, 2009.
Spectrometer Solenoid Fabrication Status and Schedule Steve Virostek Lawrence Berkeley National Lab MICE RAL October 20, 2008.
MICE Cooling Channel Magnets: Spectrometer Solenoid Procurement RF Module Coupling Coil Proposal Steve Virostek Lawrence Berkeley National Lab NFMCC 07.
Magnet vacuum vessel w/radiation shield and cold mass in place Magnet leads (left) and the three cryocoolers on the top of the spectrometer solenoid service.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab MICE Collaboration Meeting #28 Sofia, Bulgaria.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM29 at RAL, UK February 17, 2011.
CM-26 Cooler and Lead Test1 Tests of a PT415 Cooler with HTS Leads in the Drop-in Mode Michael A. Green Lawrence Berkeley Laboratory, Berkeley CA 94720,
Spectrometer Solenoid Test Plan Workshop: Safety Considerations Steve Virostek - LBNL February 17, 2012.
Spectrometer Solenoid Fabrication Status and Schedule RF Cavity / Coupling Coil Module Plan and Progress Steve Virostek Lawrence Berkeley National Lab.
Spectrometer Solenoid Fabrication Update Steve Virostek Lawrence Berkeley National Lab NFMCC at LBNL January 25, 2009.
MICE/MuCool Coupling Magnets to 22 ICST/HIT MICE/Muool Coupling Magnets Progress Li Wang for MICE Group Institute of Cryogenics.
22 October 2005MICE Meeting at RAL1 Tracker Solenoid Overview Michael A. Green Lawrence Berkeley Laboratory MICE Collaboration Meeting 22 October 2005.
MICE RF Coupling Coil Magnets Update Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory October 6, 2010 Sofia, Bulgaria.
MICE Prototype Coupling Coil Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM38 - Napa California February 25, 2014 February.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab MICE Video Conference 120 May 7, 2009.
Spectrometer Solenoid Design and Test Results Steve Virostek Lawrence Berkeley National Lab Spectrometer Solenoid Review November 18, 2009.
Spectrometer Solenoid Background Info Steve Virostek Lawrence Berkeley National Lab MICE Spectrometer Solenoid Review: Phone Meeting October 5, 2009.
MICE/MuCool Coupling Magnets ICST/HIT Progress and Schedule for the MICE/MuCool Coupling Coil Project HIT MICE CC Project Group.
Spectrometer Solenoid Prep Work at RAL and LBNL Steve Virostek Lawrence Berkeley National Lab Steve Virostek Lawrence Berkeley National Lab MICE VC May.
MICE Coupling Coil Update Allan DeMello Lawrence Berkeley National Laboratory Illinois Institute of Technology June 17, 2013 June 17, 2013.
-1- Steve Virostek (LBNL) and Li Wang (SINAP) Instrumentation for the MICE Coupling Coil Steve Virostek Lawrence Berkeley National Lab February.
MICE Spectrometer Solenoid Recovery Review - December 3-4, Steve Virostek MICE Spectrometer Solenoid Design and Assembly.
Cooling Circuit Design Steve Virostek Lawrence Berkeley National Lab February 29, 2012 MICE Coupling Coil Cryostat Design Review Lawrence Berkeley National.
MICE CC Magnet Cryostat Design Overview Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MICE CC Cryostat Design Review LBNL, February.
MICE Coupling Coil Fabrication Steps to Complete Allan DeMello Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
MICE Coupling Coil Vacuum Vessel Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
Integration of the Spectrometer Solenoid Magnets
MICE Meeting at RAL, Oct-23, 2005
Spectrometer Solenoid Update
Spectrometer Solenoid Fabrication Status and Schedule
MICE Coupling Coil Update
Presentation transcript:

Status and Integration of the Spectrometer Solenoid Magnets Steve Virostek Lawrence Berkeley National Lab MICE RAL June 15, 2007

Status & Integration of the Spectrometer SolenoidsPage 2 Steve Virostek Lawrence Berkeley National Laboratory MICE Cooling Channel Layout Spectrometer Solenoid 1 Spectrometer Solenoid 2

Status & Integration of the Spectrometer SolenoidsPage 3 Steve Virostek Lawrence Berkeley National Laboratory Spectrometer Solenoid Fabrication Update 1st magnet coil winding to be done end of June Second coil former ready for winding upon completion of first magnet coils Winding of fiberglass cold mass support bands complete – associated hardware nearly complete Four cryocoolers now on hand at Wang NMR HT C leads and magnet instrumentation on hand Power supplies being ordered this week (UCR) P.O. placed with Wang for cryocooler testing

Status & Integration of the Spectrometer SolenoidsPage 4 Steve Virostek Lawrence Berkeley National Laboratory Passive Quench Protection Space Center Coil Match Coil 1 End Coil 1 Match Coil 2 Coil Cover LHe Space 490 mm 690 mm 2544 mm Coil Spacer Spectrometer Solenoid Cold Mass End Coil 2 Complete Start next week Complete Done this week

Status & Integration of the Spectrometer SolenoidsPage 5 Steve Virostek Lawrence Berkeley National Laboratory 300 K Support End 60 K Support Intercept Support Bands 4 K Support End Cold Mass Covers Cold Mass with 50 Ton Support System Support Links Near complete Complete On order

Status & Integration of the Spectrometer SolenoidsPage 6 Steve Virostek Lawrence Berkeley National Laboratory Magnet #1 Coil Winding Progress Completed Match 2 coil Winding of Match 1 coil

Status & Integration of the Spectrometer SolenoidsPage 7 Steve Virostek Lawrence Berkeley National Laboratory Magnet #1 Coil Winding Progress

Status & Integration of the Spectrometer SolenoidsPage 8 Steve Virostek Lawrence Berkeley National Laboratory Cold Mass Support Fiberglass Bands All 32 pairs of fiberglass cold mass support bands have been machine wound, oven cured and cut to the finished width

Status & Integration of the Spectrometer SolenoidsPage 9 Steve Virostek Lawrence Berkeley National Laboratory Cold Mass Support Assembly Cold mass support band links, pins and bushings are being fabricated and are close to completion Design load proof testing of the 16 cold mass support assemblies will take place early next month

Status & Integration of the Spectrometer SolenoidsPage 10 Steve Virostek Lawrence Berkeley National Laboratory Other Related Hardware 2nd magnet coil winding form leak checked & ready to wind Material for cold mass supp’t vacuum vessel extensions

Status & Integration of the Spectrometer SolenoidsPage 11 Steve Virostek Lawrence Berkeley National Laboratory Updated Schedule Summary

Status & Integration of the Spectrometer SolenoidsPage 12 Steve Virostek Lawrence Berkeley National Laboratory Cryocooler Performance Measurement Purpose: Measure PT-415 cooler performance from 2.5 K to 22 K Confirm drop-in mode operation and measure heat leak Demonstrate that the PT-415 cooler will liquefy helium Check the convection currents’ role in intercepting heat Plan: Measure stage temps vs heat load (in vacuum & He gas) Assess the thermal resistance of the 1 st stage taper joint Operate the system with the helium at 3.8, 4.2 & 4.6 K Measure the liquefaction of helium at 4.3 K

Cryocooler Experiment Schematic Cooler Ballast Tank Valve Motor Rotary Valve Cryostat Top Plate Cooler Top Plate Drop-in Seal Cooler Enclosure Tube Wall t = ~0.38 mm Cooler Ist Stage w/ Taper Pulse Tube Regenerator Tube He Gas Radiation Shield Liquid Level Gauge Tube Safety Relief Tube Liquefaction Tank ID = ~125 mm Length ~150 mm Wall t = ~1 mm End t = ~6.4 mm Volume = ~1.8 liters K Shield Vacuum Vessel P Q T T Q T T T T Q T Q Condenser (A = m 2 ) Gas Fill Tube T

Status & Integration of the Spectrometer SolenoidsPage 14 Steve Virostek Lawrence Berkeley National Laboratory Integration and Installation Topics Design of module base connection to rails and module lifting features added to drawings and submitted to Wang Transfer thru MICE hall door verified Flange sealing concept/design integrated Utility requirements for operation Iron shield final design & fab plan ongoing

Status & Integration of the Spectrometer SolenoidsPage 15 Steve Virostek Lawrence Berkeley National Laboratory Module Mounting Provision Six mounting plates added to the support stand base for installation on rails

Status & Integration of the Spectrometer SolenoidsPage 16 Steve Virostek Lawrence Berkeley National Laboratory Module Lifting Provision Four cutouts added to the support stand side walls for lifting straps Open issue: will a lifting fixture be required?

Status & Integration of the Spectrometer SolenoidsPage 17 Steve Virostek Lawrence Berkeley National Laboratory Spectrometer Solenoid-AFC Module Joint 1372 mm ID bellows AFC flange Spectrometer solenoid flange 36 bolts on a 1470 mm dia O-ring groove Metal seal groove 56 mm

Status & Integration of the Spectrometer SolenoidsPage 18 Steve Virostek Lawrence Berkeley National Laboratory Magnet Utility Requirements Cryomech Model PT-415 cryocoolers (4 or 6 each total) 50 Hz AC: /220 or 380/420 V, 3 phase Cooling: minimum 3 gpm of 80ºF max 300 A Power Supplies – American Magnetics (3 ea total) Hz AC: V, 3 , forced air cooled, rack mnt. 60 A Power Supplies – Lake Shore Cryotronics (4 ea tot.) Hz AC: V, 3 , forced air cooled, rack mnt. Vacuum: startup thru a 25 mm flanged port Liquid cryogens: 600 liters LN 2, 1000 liters LHe (x2) Instrumentation monitoring requirements Various voltages, temperature, He level, heaters, pressure, vac.

Status & Integration of the Spectrometer SolenoidsPage 19 Steve Virostek Lawrence Berkeley National Laboratory Cryocooler Compressor Dimensions: 61x58x97 (LxWxH, cm) On ~7 cm  wheels Weight: 223 kg He flex line length: 20 meters Lifting eyes: 4 ea on top (one/corner)

Status & Integration of the Spectrometer SolenoidsPage 20 Steve Virostek Lawrence Berkeley National Laboratory Spectrometer Solenoid Iron Shields Overall iron shield dimensions have now been established Final design and fabrication drawings to be completed soon Design will be integrated with requirements of TOF shield (based on discussions this week) Shields likely to be fabricated locally to sites (FNAL, RAL) 1 shield FNAL and 2 RAL (tentative)

Status & Integration of the Spectrometer SolenoidsPage 21 Steve Virostek Lawrence Berkeley National Laboratory 1st magnet coil winding nearly complete Second coil former ready for winding Cold mass support bands complete Four cryocoolers, HT C leads and magnet instrumentation now on hand at Wang NMR Power supplies to be ordered this week (UCR) P.O. placed with Wang for cryocooler testing Vendor to complete 1 st magnet by Nov 07 Second magnet to follow 3 months later Summary